您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 辰元西园1#~5#楼施工组织设计(定)
-1-目录一、编制依据············································2二、工程概况············································3三、施工部署············································5四、施工总平面布置·····································7五、分项工程···········································131、施工测量············································132、基础工程············································133、钢筋工程············································144、模板工程············································165、混凝土工程··········································196、砌体工程············································207、屋面工程············································218、脚手架工程··········································219、垂直运输设施········································2210、抹灰工程···········································2311、门、窗工程·········································2312、外保温工程·········································2413、外墙瓷砖···········································2714、外墙涂料···········································2915、电气工程··········································3016、水暖、给排水及消防工程····························32六、主要施工管理措施···································35七、施工现场安全管理措施·······························39八、现场文明施工及工程环保·····························421)附施工总平面布置图(共1页)2)附施工进度计划表(共1页)-2-一、编制依据1、招标文件,施工图纸、施工合同及会审图纸答疑记录。2、根据内蒙古建筑勘察设计研究院勘测有限责任公司提供的建民房地产辰元西园小区岩土工程勘测报告。3、根据建设部颁发的《建设工程施工现场管理规定》4、中华人民共和国颁布的现行建筑结构和建筑施工有关规程,规范及验收标准。GB50026-2007《工程测量规范》GBJ202-83《地基与基础工程施工及验收规范》GB50204-2002《混凝土结构工程施工质量验收规范》GB50208-2002《地下防水工程质量验收规范》GB50209-2002《建筑地面工程施工质量验收规范》GB50203-2002《砌体工程施工质量验收规范》GB50207-2002《屋面工程质量验收规范》GB50300-2002《建筑工程施工质量验收统一标准》JGJ18-2003《钢筋焊接及验收规程》GB50303-2002《建筑电气工程施工质量验收规范》GB50242-2002《建筑给水排水及采暖工程施工质量验收规范》GB50210-2001《建筑装饰装修工程质量验收规范》GB50108-2008《地下防水工程技术规范》GB50045-95-2005《高层民用建筑设计防火规范》JGJ59-99《建筑施工安全检查标准》GB5144-2006《塔式起重机安全规程》JGJ130-2001《建筑施工扣件式钢管脚手架安全技术规范》JGJ80-91《建筑施工高处作业安全技术规程》JGJ33-2001《建筑机械使用安全技术规程》JGJ3-2002《高层建筑混凝土结构技术规程》JGJ46-1988《施工现场临时用电安全技术规范》DBJ03-35-2008《居住建筑节能设计标准》JGJ8-2007《建筑变形测量规范》03G101-1《混凝土结构施工图平面整体表示方法制图规则和构造详图》-3-04G101-3《混凝土结构施工图平面整体表示方法制图规则和构造详图》03G329-1《建筑物抗震构造详图》JGJ/T185-2009《建筑工程资料管理规程》二、工程概况1、工程概况序号项目内容1工程名称辰元西园住宅小区1#、2#、3#、4#、5#楼2工程地址鄂尔多斯市伊旗镇3建设单位鄂尔多斯*****房地产开发有限公司5设计单位内蒙古****建筑设计有限责任公司6监理单位内蒙古****建设监理有限责任公司7施工总承包单位陕西****建设工程有限公司9合同承包范围施工图纸内容包括:土建、水暖、卫生、消防及电气工程。10结算方式预算+增减帐11工期要求计划开工日期:年月日要求工期:日历天12合同质量目标(等级)合格2、建筑概况:楼号结构类型建筑总高度建筑面积层数±0.000标高室外高差1#楼钢筋混凝土剪力墙结构47.00米地下一层地上十五层1332.400m0.45米2#楼43.50米地下一层地上十四层1332.850m3#楼43.50米地下一层地上十四层1332.400m4#楼28.50米地下一层地上九层1332.400m5#楼34.50米地下一层地上十一层1332.600m施工图除标高及注明处以米为单位外,其他尺寸标注一律以毫米为单位,各层标高为建筑完成面标高,屋面标高为结构面标高;建筑设防类别为2类高层建筑,合理使用-4-年限为50年;抗震设防烈度为6度;设计地震为第三组;设计基本地震加速度:0.05g;防火设计其耐火等级二级。3、结构概况本工程根据勘测单位出据的勘察报告,冰冻线:-1.5m,本工程基础持力层采用È4É强风化细砂岩层,承载力特征值fak=360KPa;自然条件:1、基本风压:W=0.50KN/M2,地面粗糙度:B;2、基本雪压:W=0.35KN/M2.主楼基础:采用钢筋砼筏板基础,底板厚为600mm,本工程为钢筋砼剪力墙结构,抗震等级为三级,基础垫层砼强度等级为C15;基础为筏板基础,采用C30砼防水等级为二级,抗渗等级为S6.0钢筋混凝土;其中构造柱、圈梁、过梁混凝土等级为C20,主体混凝土强度等级均为C30。4、专业设计概况4.1暖通本工程采暖系统为散热器热水采暖系统。4.2给排水给排水系统一层至八层为低区,九层至一十五层为高区,冷热水采用PE-RT冷热关材热熔连接,排水采用UPVC排水铸铁管柔性胶连接,雨水管采用焊接钢管焊接,排烟为竖井排烟,出屋面。4.3消防消防系统采用高压冷水系统并在每层设若干手提式粉末灭火器,型号MF15×2.4.4电气电源总路线采用落地式动力箱,进出线方式为下进下出,住户配电箱分别设立于每户。4.5节能屋顶挤塑聚苯板采用100厚;外墙挤塑聚苯板采用70厚;不采暖地下室顶板SMXT硅酸铝保温42厚;不采暖楼梯间隔墙采用SMXT硅酸铝保温38厚;不采暖楼梯间的户门采用成品保温门;外窗采用断桥铝合金中空玻璃;屋顶100厚挤塑聚苯保温板,容重≥30kg/m3。外墙的气密性能比低于《建筑外窗气密性能分级及其检测方法》(GB/T7107-2002)中规定的四级,外门窗立口均与结构外墙齐平,框料与墙体之间缝隙添堵和密封材料做法详05J3-1页A7,本工程建筑节能设计执行内蒙古自治区工程建设标准《居住建筑节能设计标准》(DBJ03-35-2008)。建筑为钢筋混凝土剪力墙结构,采用外墙外保温体系,-5-墙身细部:女儿墙、窗口、空调板、勒脚及窗井等部位均应采取断桥保温措施。5、施工难度分析及措施5.1本工程属高层建筑,施工立体交叉作业多。5.2建设地区属于高原地带天气变化不稳定、风力大、施工工期短。为了能保证按期完成该项工程,依据本工程的特点及我公司的技术装备、劳动力资源等情况,必须以科学多样性的施工方法,以结构工程为先导,砌筑、装修工程随结构工程进展而适时地进行立体交叉作业,特别注意安全操作规程,确保无安全事故发生。5.3本工程施工特点必须采用控制总工期,季、月、周等计划层分解的方法实行工期管理,以工序工期保证周计划,以周计划保证月计划,以月计划保证季度计划,最终保证总计划。5.4综合上述施工特点,难点,我公司本着以项目经理为主,组成安全、材料、施工、技术、质检及资料六大工作成员,负责对本工程领导、指挥、协调、决策并定期召开生产例会,及时解决本工程出的问题及协调各生产要素,主导重大事宜为下步生产工作提前做好准备。6、工程控制目标6.1安全控制目标:无重大安全事故发生,轻伤率小于3‰;6.2质量控制目标:合格;6.3工期控制目标:确保合同工期内完成并争取提前完成;6.4费用目标:精心组织施工,在保证质量的前提下,合理利用现有资源,减少材料浪费降低成本;6.5服务目标:建业主满意工程。三、施工部署3.1项目组织机构我公司委派项目经理及主管安全、质量、施工、技术、材料、资料六大工作成员,本着以项目经理为主导核心,并负责对该工程领导、指挥、协调、决策等重大事宜。具体安排详见下页“施工现场项目组织机构图”-6-3.2施工总工艺流程首先定位放线,做好控制桩点并桩点保护好,做好记录;然后开挖土方(分包方另行出方案);先做住宅楼的基础,待住宅楼结构主体进行至标准层时,再插入地库基础及结构的施工;为保障地库施工的有序进行,采用分段进行,确保施工现场的道路通畅;1#--5#住宅基础施工顺序是4#-2#-5#-1#-3#,因地库后施工现场比较大,人员、物资和机械都可以更有效合理的组织安排,所以我们采用大流水的施工方法施工,按4#-2#-5#-1#-3#的施工顺序进行流水;地库的顺序是先从西侧开始,按后浇带自然分段向东展开施工;最后利用地泵浇注后浇带砼;待主体结构封顶、地库顶上履土后再拆除塔吊,进入后期施工阶段。3.3塔吊的布置每栋号设一台40m(臂长)的塔吊,1#、2#、3#、4#、5#的位置都是在楼的北侧,项目经理:***苗金贵安全员:***材料员:施工员:***资料员:***技术员:钢筋班组木工班组水暖工班组架子工班组外装饰班组抹灰工班组质检员:***瓦工班组混凝土班组电工班组防水工班组技术总工:***苗金贵生产经理:***苗金贵-7-4#、5#主要考虑尽量离相邻施工单位的塔吊远点,1#、2#、3#也是要与其他栋号的塔吊远点。同时要将各个塔的高度错开。具体见《塔吊施工方案》四、施工总平面布置1、现场准备1.1根据规划部门提供的测量基准点,布设测量网点,做好定位放样的准备。1.2根据施工要求与总平面布置,及时组织相关人员进行现场临时水电安装,并按当地相关要求做好安全防范工作。1.3根据工程施工现场总平面布置图,迅速组织人员搭设临舍,确保人力与设备及时进场。2、技术准备2.1项目技术人员认真熟悉施工图与相关图集,通过图纸会审、设计交底及组织技术人员认真研究讨论解决相关疑难问题,为以后顺利施工打下良好基础。2.2根据本工程实际施工需要及有关重点、难点,制定切实可行的各专项工程施工方案、技术交底,并向业主、监理报审。3、人员准备3.1我施工单位本着对业主的承诺,合理组织强有力的施工队伍进场,保证工程的工期及质量。3.2加强对进场人员的安全教育培训,强化进场人员安全意识,严把安全质量关。3.3制定各项安全生产管理制度、职责以及各项措施4、现场临时设施准备本工程总平面按照大路
本文标题:辰元西园1#~5#楼施工组织设计(定)
链接地址:https://www.777doc.com/doc-4482251 .html