您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 宁波地铁文明施工方案
宁波市轨道交通1号线一期工程车站机电安装施工项目JD1102标文明施工管理方案工程名称:宁波轨道交通1号线一期工程车站机电安装施工项目JD1102标工程地点:宁波市施工单位:广东省源天工程公司监理单位:乌鲁木齐铁建工程咨询有限公司编制人:项目经理:盖章:编制日期:年月日目录一、工程简介·····································································································1二、指导思想·····································································································1三、管理目标·····································································································2四、文明施工管理体系·························································································2四、文明施工责任制度·························································································3五、文明施工检查制度·························································································5六、文明施工奖惩制度·························································································5七、文明施工管理措施·························································································6八、环境保护工作···························································································10~1~一、工程简介工程名称:宁波市轨道交通1号线一期工程车站机电安装施工项目JD1102标建设单位:宁波市轨道交通工程建设指挥部监理单位:乌鲁木齐铁建咨询有限公司设计单位:广州地铁设计研究院有限公司(西门口站)上海市隧道工程轨道交通设计研究院(鼓楼站)监督单位:宁波市市政公用工程安全质量监督站施工单位:广东省源天工程公司宁波市轨道交通1号线分两期实施,其中一期工程线路长度为20.972km,包括高架线路5.45km,过渡段0.31km,地下线路15.118km。共设车站20座,包括高架站5座,地下站15座,平均站间距约1.14km。一期工程设石路头停车场和天童庄车辆基地各1座,在东环南路站附近设控制中心1座。根据宁波市轨道交通网络规划,1号线一期工程与5条规划线路换乘,全线共有换乘车站5座,由西向东分别是望春桥站、大卿桥站、鼓楼站、樱花公园站和海晏北路站。JD1102标工程范围包括西门口站、鼓楼站及相应区间的机电安装与设备管理用房装修工程。二、指导思想以宁波市轨道交通建设指挥部关于《文明工地管理规定》精神为指导,贯彻落实市安质监站、市重大办以及业主关于文明施工的有关要求,做到全员参与、全过程管理、全方位达标,提高创建水平和质量,使文明施工管理进一步规范化、科学化、制度化。文明施工是施工企业整体实力和综合管理水平的反映,项目部应将文明施工当作企业生存和发展的基本策略之一,树立良好的企业形象和社会信誉。~2~三、管理目标1、全面落实宁波市轨道交通建设指挥部对文明施工的部署和各项具体要求,继续巩固轨道交通建设区域文明工地成果。2、争创宁波市文明施工样板工地。四、文明施工管理体系工程部:林楚裕质安部:陈文燕办公室计材部车站负责人林为叶、庄宇平技术负责人陈佳钿安全总监林泽文西门口站林为叶火灾门禁监控班建筑装修班通风空调班给排水及消防班低压配电及照明班鼓楼站庄宇平火灾门禁监控班建筑装修班通风空调班给排水及消防班低压配电及照明班项目经理金世国~3~主要成员职责分工:现场管理:金世国内业资料:陈佳钿宣传交底:林泽文材料堆放:林为叶、庄宇平治安消防:彭东生施工安全:林泽文五小设施:施工班组长机械用电:陈文燕工程质量:陈佳钿管线防护:施工班组长防尘降噪:林楚裕环境卫生:林为叶、庄宇平五、文明施工责任制度1、目的为了实现本工程文明施工目标,争创宁波市文明施工样板工地,依据《建筑施工安全检查标准》(JGJ59-99)和宁波市轨道交通建设指挥部关于《文明工地管理规定》的有关要求,特制定本制度,文明施工责任落实到部门和人,建立检查制度和奖罚制度,进行有效控制和管理。2、文明施工责任制度项目部成立以项目经理为组长的文明施工领导小组,全面负责文明施工及争创宁波市文明施工样板工地监督、检查工作。按照“宁波市建设工程现场文明施工管理办法”的要求,将文明施工的要求有关责任分解落实到项目部的有关部门和责任人如下:2.1项目经理文明施工职责:根据《宁波市市政公用建设工地文明施工管理暂行办法》、《宁波地铁建设工程施工、监理单位安全、质量、文明施工考评办法》和业主颁布、印发关于质量、安全生产、文明施工等考核办法建立文明施工管理制度;落实人员职责;保证文明施工费用的投入;组织现场文明施工检查、考核;~4~2.2安全总监文明施工责任责任人:林泽文现场围蔽达标。(施工组配合)封闭管理达标。(施工组配合)配合施工班组负责施工场地达标。负责办公区域、食堂、员工、宿舍消防、防火,灭火器材设置的达标。负责工地宣传栏、读报栏、黑板报的建立,读报栏管理。负责项目部治安综合管理达标。2.3技术负责人责任人:陈佳钿负责项目部文明施工学习计划的制定和实施。负责组织规划施工现场平面布置和动态管理。负责文明施工业内资料管理。2.4车站负责人按照施工总平面布置图设置各项临时设施负责施工现场的用电线路、设施的安装和使用管理保持施工现场道路畅通,排水系统处于良好状态;随时清除建筑垃圾,保持场容场貌的整洁。做好施工区域的标志和成品保护工作2.3计材部职责责任人:林为叶材料堆放达标。负责仓库、材料堆放区域的防火,灭火器材配备,易燃易爆物品专人管理和禁火标志设置达标。2.4工程部职责责任人:林楚裕检查、监督进行施工现场人员佩戴工作卡。配合安全总监做好现场围蔽、封闭管理达标。负责施工场地达标。负责各专业操作人员持证上岗达标。负责环境保护达标。负责施工现场工完场清达标。~5~2.5质安部职责责任人:陈文燕负责办理动火审批手续和动火监督。监督操作人员持证上岗。负责组织项目部黑板报的编写。负责安全文明施工安全标语和横额的设置。2.6办公室职责负责文明施工文件资料达标。负责项目部宣传栏的编写。六、文明施工检查制度1、项目部文明施工领导小组按“《建筑施工安全检查标准》(JGJ59-99)中文明施工检查评分表”每月进行一次文明施工综合检查评分。2、项目部经理主持检查评分。3、安全总监每周组织各有关责任部门和责任人对自己负责的文明施工内容进行经常性的日常检查,发现问题或不达标之处要及时组织修改,务必使施工全过程保持在良好的文明施工状态。七、文明施工奖惩制度1、项目部将每月文明施工检查评分结果纳入项目部月度、季度、年度奖金实行奖励与处罚,每检查项目月度检查评分不能达标或低于“应得分数的90%”的有关责任部门和责任人的奖金需扣减。2、对每月文明施工检查评分结果检查项目完全达标的部门责任人予以通报表扬,对检查项目不达标或检查评分低于应得分90%的责任部门和责任人可以通报批评,并责成尽快整改达标。~6~八、文明施工管理措施场容布置:1、工地大门及柱牢固、美观、符合招标要求的高度、宽度和造型。2、施工现场围墙封闭严密、完整、牢固、美观、上下平、外立面直、高度2.5m。沿街围墙使用灰砂砖砌筑,外表批荡或采用围街板封闭,并贴上有关地铁施工的宣传标语。3、在施工工地大门外明显处,悬挂宽0.6m、高0.8m的施工牌,写明工程名称、建筑面积、建设单位、施工单位、驻地监理单位、质量监督站、安全监督站、工地施工及管理负责人姓名、开工日期、竣工日期等内容。4、工地大门口设置洗车槽,所有出场车辆必须进行清洗,以免车辆从施工场内带出泥土,污染市政道路。5、在临时驻地入口、施工现场各出入口、站台轨行区入口、站厅、站台等位置设置视频监控,不留死角。6、在办公、生活区的入口处设置“广东源天”标志牌。7、生活办公区临时设施按施工平面图布置,搭设整齐。8、建筑物内地面捣制10~15cm厚的素混凝土,建筑物外通道进行硬地化处理。9、临时驻地排水系统符合要求。10、场地空旷,要架设避雷针和铺设接地网。11、在办公、生活区内显眼处设立宣传通知栏。12、在各建筑物的墙上张贴有关质量、安全、防火、文明施工等内容的塑料标语牌。13、在各办公区、地下作业区入口悬挂有关质量、安全、防火、文明施工等内容横幅。14、在办公室外墙上设置“九牌两图”。15、设置消防水池和配备足够的消防灭火器材。~7~16、在厨房、宿舍、办公室附近分别设置垃圾桶。17、设置文化娱乐设施,空置场地适当绿化。18、施工现场的开关箱符合规范要求,使用统一规格、颜色并在正面喷有“广东源天”的开关箱。19、现场施工人员统一佩戴地铁公司版本的工作胸卡、进出施工站内必须在门卫处做好登记并出示工作证,进入不同的区域施工按规定领取A或B证件,统一着装,并统一安全帽的使用:项目部管理人员使用白色安全帽;工地专业班组长使用蓝色安全帽;施工作业人员使用黄色安全帽。办公室布置1、办公室内铺地板砖并吊顶。2、施工办公室门口设置功能标牌。3、办公室内台凳统一布置,装设电话和网络、传真机、复印机、电脑、电开水器和空调机。4、根据公司文明施工规定,办公室悬挂系列相架和图表。5、资料分类入盒,放在资料柜内;施工图纸分类分册摆放整齐。仓库布置1、仓库内的货架采用金属货架,摆设整齐。2、材料按名称、规格、型号存放,摆放整齐,并标志清楚。3、油漆、乙炔、氧气等危险品设立专门仓库存放,同时配备足够的灭火器材,设置防火禁令牌和危险标志。宿舍布置1、宿舍门口挂出宿舍防火管理责任人及进住人员牌子,宿舍内挂宿舍管理制度。2、统一使用铁架上下床,每个房间设4张床,住6人。预留1个床位的空间,放置安全帽、生活用品等。3、宿舍内不准堆放材料,不准生火或煮东西,不准躺在床上吸烟,设置烟火灭火水桶。~8~4、在宿舍附近规定地方设置足够的灭火器材。5、宿舍清洁卫生每天轮流值日进行,周边环境有专人打扫。6、定期进行宿舍舍容,卫生评比活动,奖优罚劣。7、女职工宿舍单独设置。厨房厕所布置1、地面使用大理石地面,墙面1.8米以上和洗池贴白色瓷片,厨房门窗装纱窗。2、保持厨房、饭堂内外卫生,每餐后清扫,每周大扫,厨具定期消毒。3、厨房使用煤气灶、电炊具,配备一台以上的冰箱,灭蚊灯,生熟食品分开存放。4、厨房的食品卫生许可证及炊事员的健康证须悬挂在厨房墙上。5、厕所设置按要求距离食堂30米以上。6、厕所、淋浴室内的设置符合文明施工规定,其数量须满足施工高峰的要求。7、厕所内设置洗手盆,设自动冲洗装置。8、厕所日常卫生由专人管理,并定期消毒。施工区文明施工管理1、牢固树立“预防为主、安全第一”,“以人为本,关爱生命”,“安全责任重在落实”的思想,全面落实“三宝”“四口”防护及防火、防盗、用电安全,实施换牌出入施工现场制度,安全保卫巡检制度和用电专人负责制度。2、加强安全文明施工教育,全体工地工作人员,每周进行一次安全文明教育
本文标题:宁波地铁文明施工方案
链接地址:https://www.777doc.com/doc-4810542 .html