您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 安全文明施工 > 空心薄壁墩盖梁施工受力计算书
--1---2-盖梁施工验算书根据JTJ025-86公路桥涵钢结构及木结构设计规范,临时性结构的容许应力提高系数为1.3~1.4,以Q235(A3)为例:弯曲应力[σw]=145Mpa,作为临时性结构提高后的弯曲应力[σw]=203Mpa,已接近屈服点,实际计算弯曲应力中按屈服强度235MPa做为验算控制指标。剪应力[σ]=85Mpa,临时性结构提高后的剪应力[σ]=119Mpa。一、荷载计算①、梁重q=2.5×(0.9+0.8)×3=12.75t/m(全截面段)对支撑杆件施加作用力的砼总重量=全截面段+渐变段+挡块+垫石=((0.9+0.8)×3×0.5+(1.7+0.9)×2.425÷2×3+0.5×0.56×3+0.8×0.8×0.175×2)×2×2.5=(2.55+9.46+0.84+0.224)×2×2.5=65.37t模板荷载:对应墩顶的6.5m范围:0.9KN/㎡×(1.7×2)×6.5=1.989t盖梁悬臂部分全断面0.5m两侧:0.9KN/㎡×(1.7×2+3)×0.5×2=0.288×2=0.576t盖梁悬臂部分渐变段2.425m两侧:0.9KN/㎡×((1.7+0.9)×2.425÷2×2+2.554×3)×2=2.514t挡块模板:0.9KN/㎡×(0.5×0.56+0.5×3)×4=0.641t∑模板=5.72t--3-施工人员,施工料具荷载:1.0kpa×3m=0.3t/m0.3t/m×12.35=3.705t砼倾倒与振捣荷载:4kpa×3m=1.2t/m1.2t/m×(12.35-5.5)=8.22t荷载分布系数:砼取1.05,其它取1.1荷载计算:1.05×65.37+1.1×(5.72+3.705+8.22)=68.64+19.41=88.05t②、(4根45b工字梁:12×0.087485×4=4.2t)拟采用槽钢横梁、木楔等计8t全部荷载:P=88.05+4.2+8=100.25t≈100t二、串杠受力验算D=10cm碳圆(尺寸及参数:d=100mm,Ix=491cm4,wx=98.2cm3,截面面积=78.5cm2,理论重量=61.7(kg/m))18工字钢(尺寸及参数:h=180mm,b=94mm,Ix=1660cm4,wx=185cm3,截面面积=30.756cm2,理论重量=24.143(kg/m))20b工字钢(尺寸及参数:h=200mm,b=102mm,Ix=2500cm4,wx=250cm3,截面面积=39.578cm2,理论重量=31.069(kg/m))25a工字钢(尺寸及参数:h=250mm,b=116mm,Ix=5020cm4,wx=402cm3,截面面积=48.541cm2,理论重量=38.105(kg/m))38kg/m(U74普通碳素轨)(尺寸及参数:h=134mm,b上=68mm,b下=114mm,Ix=1204.4cm4,wx=178.9cm3,截面面积=49.5cm2,理论重量=38(kg/m))--4-支撑点一端受集中力:P=100/4=25t1)试算d=10cm碳圆(考虑每侧采用两根bI40做横梁)a、剪力验算:钢)(385][847.311005.014.325000076.3184713300785.025000005.014.32562222AMPaMPaPamNmtAP满足要求b、弯曲应力验算:MPacmmNWMcmrd5.361102.98142.02500002.9840982.0W6333(高于235Mpa的屈服点,不满足要求)W=毛截面抵抗矩c、刚度验算mmmmmtEIPlfA72.024.01024.03093300496.74610491101.2310144.02533811433--5-444491641014.364cmdIπ悬臂构件计算跨度取实际长度2倍,L=0.144*2=0.288m,0.288m/400=0.72mm(L=0.144mbI40b=14.4cm,h=40cm)满足要求结论:不考虑采用。2)试算18I工字钢(考虑每侧采用两根bI40做横梁)a、剪力验算:钢)(385][28.8110756.302500005.8128495210756.30250000756.30252242AMPaMPaPamNcmtAP满足要求b、弯曲应力验算:MPaMPammtcmtWMAN235][88.2756.19428.81c185101144.025756.3025362不满足要求c、刚度验算mmmmmtEIPlfA72.0071.010071.0101660101.2310144.02533811433悬臂构件计算跨度取实际长度2倍,L=0.144*2=0.288m,0.288m/400=0.72mm(L=0.144mbI40b=14.4cm,h=40cm)结论:不可以采用。3试算bI20工字钢(考虑每侧采用两根bI40做横梁)a、剪力验算:钢)(385][1.6310578.39250000578.3925242AMPaMPamNcmtAP--6-满足要求b、弯曲应力验算:MPaMPammWMAN235][1.2071441.63c250101144.0102510578.392500003644满足要求c、刚度验算mmmmtEIPlfA72.0047.0102500101.2310144.0253811433悬臂构件计算跨度取实际长度2倍,L=0.144*2=0.288m,0.288m/400=0.72mm(L=0.144mbI40b=14.4cm,h=40cm)结论:可以采用。4试算aI25工字钢(考虑每侧采用两根bI40做横梁)d、剪力验算:钢)(385][5.5110541.482500005150285310541.48250000541.48252242AMPaMPaPamNcmtAP满足要求e、弯曲应力验算:MPaMPammWMAN235][1.1416.895.51c402101144.010255.51364满足要求f、刚度验算mmmmtEIPlfA72.0024.0105020101.2310144.0253811433悬臂构件计算跨度取实际长度2倍,L=0.144*2=0.288m,0.288m/400=0.72mm(L=0.144mbI40b=14.4cm,h=40cm)结论:可以采用。--7-4试算轨型为38kg/m普通碳素轨U74(考虑每侧采用两根bI40做横梁)a、剪力验算:)(74147][5.50105.4925000050505051105.492500005.49252242UMPaMPaPamNcmtAPU74的允许剪应力估算为0.36倍屈服强度取值为:147Mpa满足要求b、弯曲应力验算:MPaMPammWMAN410][7.2512.2015.50c9.178101144.010255.50364屈服满足要求c、刚度验算mmmmmtEIPlfA72.0098.010098.01041204101.2310144.02533811433悬臂构件计算跨度取实际长度2倍,L=0.144*2=0.288m,0.288m/400=0.72mm--8-结论:可以采用。实际施工过程中,两根串杠按照盖梁横坡不等高埋设。三、钢盒子底砼应力验算一处受集中力P1=2P=2×25=50t,钢盒子与砼接触面积取0.116×3=0.128m2,MpaMpaNmtAP8.26][43.1.348m01050348.05042(C40砼)满足要求--9-四、工字梁受力验算(I40a尺寸及参数:h=400mm,b=142mm,Ix=21700cm4,wx=1090cm3,理论重量=67.598(kg/m))(I36a尺寸及参数:h=360mm,b=136mm,Ix=15800cm4,wx=875cm3,理论重量=60.037(kg/m))(I50a尺寸及参数:h=500mm,b=160mm,Ix=46500cm4,wx=1860cm3,理论重量=93.654(kg/m))1)弯曲应力计算方法1(较精确计算)每次盖梁施工,采用4根aI40工字梁:M1(悬臂全截面段)=0.5×1.7×3×2.5×(0.5+0.058+0.25)=6.375×0.808=5.151t-mM2(悬臂渐变段)=(0.9+1.7)/2×2.425×3×2.5×(0.5+0.058+0.5+1.09)=23.64×2.148=50.78t-my2=(2.425×(1.7+2×0.9))/3×(1.7+0.9)=1.09m--10-M3(挡块)=0.5×0.56×3×2.5×(0.5+0.058+2.925-0.28)=2.1×3.203=6.726t-mM4(垫石)=0.8×0.8×2×0.175×2.5×(0.5+0.058+2.025)=0.56×2.583=1.446t-mM5(模板)=全截面段+悬臂全截面段+悬臂渐变段+挡块+垫石=0.09×((1.7×2)×0.558×(0.558/2)+(1.7×2+3)×0.5×(0.5+0.058+0.5/2)+((0.9+1.7)/2×2.425×2+2.554×3)×(0.5+0.058+1.09+0.5)+(0.5×0.56+0.5×3)×2×(0.5+0.058+2.925-0.28)+0.8×0.175×4×2×(0.5+0.058+2.025))=0.09×(0.529+2.586+30.001+11.402+2.893)=0.09×47.411=4.267t-mM6(施工人员,施工料具荷载):0.3t×2.925×(2.925/2+0.5+0.058)=0.878×2.02=1.773t-mM7(砼倾倒与振捣荷载):1.2t×2.925×(2.925/2+0.5+0.058)=3.51×2.02=7.092t-m∑M=5.151+50.78+6.726+1.446+4.267+1.773+7.092=77.235t-m①σ=M/W=772350/(875×4×10-6)=220671428.6pa=220.7Mpa<235Mpa(结论:使用4根36a工字梁可满足施工荷载要求)②σ=M/W=772350/(1090×4×10-6)=177144495pa=177Mpa<235Mpa(结论:使用4根40a工字梁可满足施工荷载要求)③σ=M/W=772350/(1860×2×10-6)=207620967.7pa=207.6Mpa<235Mpa(结论:使用2根50a工字梁可满足施工荷载要求)2)弯曲应力计算方法2(近似计算)--11-q=1.7×3×2.5=12.75tL=5.3mCA=BD=3.525m1、悬臂段AC=BC段:)(aIMPaWMmqlM456225.1381041430792134N.7921342525.312750023)挠度计算①取用4根I45a当)2(83laEIlqaffdc=)384.5)558.0925.2(2(10432200101.28384.5)558.0925.2(1275008113=0.0134×2.6469=0.035mm<13.46mmmmmL46.13400384.5400当x=mla175.62384.5)558.0925.2(2--12-8112222min10432200101.216384.5)558.0925
本文标题:空心薄壁墩盖梁施工受力计算书
链接地址:https://www.777doc.com/doc-4953644 .html