您好,欢迎访问三七文档
XXX输变电改造工程(线路部分)导地线展放施工方案1110KVXXX输变电改造工程导地线展放施工方案XXXXXXXXX项目部二〇一五年十一月六日1目录一、编制依据······················································2二、工程概况·····················································2三、施工方法及步骤··············································3四、主要施工工艺及要求···········································101、金具施工图及说明·············································102、驰度观测与调整·············································103、导地线液压·················································134、防振措施···················································145、放线施工注意事项············································14五、工期目标和施工进度计划·······································15六、资源需求计划·················································21七、质量控制措施·················································25八、安全控制措施················································27九、应急预案····················································292一、编制依据●适用范围:本施工方案仅适用于XXX工程●目的:通过本作业指导书要求及现场布置,规定的操作工艺和技术要求,使本工程在张力展放导、地线施工过程中,满足施工安全和质量要求,确保工程顺利进行。●编写依据:1)《110~750kV架空输电线路设计规范》GB50545-20102)《交流电气装置的过电压保护和绝缘配合》DL/T620-19973)《架空送电线路杆塔结构设计技术规定》DL/T5154-20024)《电力系统污区分级与外绝缘选择标准》Q/GDW152-20065)《架空送电线路基础设计技术规定》DL/T5219-20056)XXX工程设计资料7)我公司现场调查资料8)我公司的技术力量、施工水平和机械设备9)我公司以往施工的110kV、220KV送电线路工程的施工方案、施工经验和工程总结二、工程概况略三、施工方法及步骤3.1、施工方法3.1.1展放方法:本工程采用张力放线,利用张力机、牵引机等设备在规定的张力范围内悬空展放导、地线、一拖一的施工方法,全线均采用先组立铁塔,后在展放新线的同时拆除旧线的施工方法。3.1.2工器具及设备准备导地线展放前,确定飞艇的起止点,飞艇在放一级牵引绳所需的工器具及设备。张力场、牵引场、转向场、紧线场、过线杆塔等相应的工器具及设备。3.1.3牵引钢丝绳的选择33.1.3.1导线张力展放:φ22钢导引绳牵LGJ-400/35导线及OPWG-10-50-1、OPGW-13-100-1复合光缆;3.1.3.2地线张力展放:φ13钢导引绳牵GJ-50/7、JLB20A-100-19型钢绞线地线;3.1.3.3导线展放(1)导线展放须采用张力展放,按技术部门提供的导线布线图进行安装线盘,将导线缠入张力轮,缠绕方向以导线外层绕捻方向为准。(2)放线前指挥人员应明确施工人员的通讯频道、工作地点及当天的工作内容,并交待清楚子导线的排列序号,相序等,以便施工人员在放线过程中能准确无误地反映各子导线的动态。导线牵引前应收紧牵张机与其尾车之间的绳线,调整好尾部张力。(3)张力放线的现场指挥设在张力场。各岗位按现场指挥的统一指令作业,现场指挥汇总各岗位的情况做出判断并做出指令。导线换盘或停机过夜时,张力机后的导线须用尼龙绳进行锚固。(4)接到任何岗位发出的停机信号时,牵引机均须立即停止牵引。带张力牵引时应先开张力机,待张力机刹车打开后,再开牵引机。需停止牵引时,应先停牵引机,后停张力机,并始终保持牵、张机的尾线有足够的张力。待缺陷处理完毕后恢复开机。(5)施工过程中,牵张设备操作人员,应密切注意设备运转情况,出现异常情况,立即停止作业,处理完毕后继续作业。(6)开始牵引前应重点检查以下情况:1)沿线电力线停电措施有否落实;2)场地布置和机械设备锚固有否到位;3)通信联络和人员有否到岗;4)受力系统连接是否到位;5)牵引绳是否在牵引滑轮内。(7)开始牵引时,牵引速度应缓慢,现场指挥应通知塔号看护人员检查施工区段有无异常情况;调整各子导线张力,使走板呈水平状态。走板牵引至靠近转角塔滑车时,应慢速牵引,并调整各子导线张力,使走板面与滑轮轴基本平行,4以防跳槽。(8)放线滑车上扬的塔号,由专人监护以防跳槽,并准备好处理跳槽的必备工具。(9)牵引绳牵放导线过转角塔时,放线滑车向转角内侧偏斜,为防止外角侧放线滑车偏斜磨擦横担,外角侧的放线滑车应设置拉线以控制滑车偏斜。(10)更换牵引绳盘:当牵引绳头进入牵引绳盘3—4圈后,应停止牵引。在牵引机与绳盘之间用卡线器锚固牵引绳;拆除刚入绳盘的抗弯连接器;卸下满盘,换上空盘。将牵引绳头缠固在新装的绳盘上,转动绳盘,收紧牵引绳。卸下牵引绳上的临时锚固的卡线器后,继续牵引。(11)更换导线盘:当导线线盘上的导线剩下最后一层时,应减慢牵引速度;线盘上导线剩下6圈时,应停止牵引,将尾线临时锚固,倒出盘上余线,装上新盘导线,用双头网套将尾线与新线连接,并将余线缠回线盘;继续慢速牵引至双头网套于压接点位置,停止牵引进行压接。(12)每相的导引绳、牵引绳展放完毕应随即在牵张场两端进行地面临锚,锚线张力应满足对地及交跨物的安全距离。(13)走板过滑车后应重点检查:1)走板不应翻转;2)平衡锤不应搭在导线上;3)导线不应跳槽;(14)按锚线张力选配工器具及锚桩,锚线与导线接触或可能接触的部位,应采取导线防磨措施。(15)一相导线展放完毕后,在牵张机前,将导线临锚,同相各子导线的锚线张力宜稍有差异,使子导线在空间错开,避免线间鞭击。导线锚线高度应保证与地面或跨越物的安全距离。3.1.4放线牵张力的选择3.1.4.1选择放线张力的一般原则3.1.4.2牵放过程中,导线、地线与地面及被跨越物的距离应不小于:a、一般区段,导线、地线距地面3米;b、通行行人及少量车辆的道路,施工时只需设岗监护而不需搭设跨越架者,5导线、地线距离路面5M;3.1.4.3需满足我公司现有导、牵引绳的安全系数;导引绳、牵引绳的有关数据如下表:规格自重kg/m破断拉力kgΦ22钢导引绳1.04815500φ13钢导引绳0.5898106503.1.5被跨越物保护:①、跨越电力线路必须停电施工;②、跨越通讯线路时,采取托高的方法使牵引绳通过;③、跨越公路时,在跨越点前后300m左右设安全警示牌,并安排专人监护;④、穿越高电压等级的线路跨越点,设专人监控跨越点当中导地线及牵引绳的高度。3.1.6紧线施工方法:①、检查本耐张段内各杆塔上导地线是否在滑车内,消除跳槽现象;②、将牵张场两终端塔分别挂线(保证中间无过多余线);③、在各紧线端用机动绞磨进行紧线,直至达到弧垂点;④、划印,安装耐张金具;⑤、过张,挂线。3.1.7耐张塔临时拉线的安装紧线前应该在耐张塔上的每一相导线和避雷线都应打设临时拉线。打设方向位于相对应的导地线延长线上,对地夹角为不大于45°注:①拉线方向为顺施工线路的方向;②拉线应打在本段施工的挂线侧,对地夹角≤45°;③拉线的连接:上端——在挂线点处主材上绑圆木打上千斤套(≥φ15)与NX-5楔型线夹相连,下端为NUT-5型UT线夹与≥φ18.5配的地牛鼻相连;④地锚埋设深度依地质条件由项目部核定,其地线侧拉线地锚以8T为宜,导线侧拉线地锚以12T为宜。3.1.8对所放区段导地线的检查:①检查子导线在放线滑车中的位置是否正确,消除跳槽现象;6②检查子导线是否互绞,如有则需打开后紧线;③检查压接管的位置合适否,否则应作调整处理;④检查地线上扬杆塔的压线滑车是否保留;⑤检查各档对导地线提高驰度是否还存在树枝、障碍物影响,若有应清理;3.1.9对所有耐张塔的导地线挂板方向的正确性应进行检查,与设计要求不符者应处理。3.1.10直线塔附件安装:①、在悬垂串投影点上划印;②、用小型紧线工具(双钩、手板葫芦或是收线器)提升导线、地线。③、将导线、地线提离直线滑车;④、按照划印点安装悬垂线夹;⑤、松紧线工具,并对悬垂线夹进行适当调整,保证悬垂串垂直。3.2、施工步骤3.2.1施工准备3.2.1.1运输和存放:导线、金具运输和存放时,应按设计和生产厂家要求进行。3.2.1.2牵张场的选择(1)牵张场尽可能选择在允许导、地线压接档。(2)牵张设备、吊车等能直接运抵,并有满足设备物资堆放及施工操作的场地。(3)相邻杆塔允许作紧线及过轮临锚操作,锚线角度满足要求。(4)主牵引机、主张力机宜布置在线路中心线上,当满足不了要求时,牵引场可作转向布置。(5)大小牵、张机顺线路出口方向与邻塔导线悬挂点的仰角不宜大于15°,俯角不宜大于5°。(6)小牵、张机按导线牵放顺序分别布置在每相导线的垂直下方。(7)牵张场前后两侧应有锚线场地,距离、角度满足要求。(8)放线区段不宜超过20个放线滑轮,线路长度不宜超过8km。(9)放线区段有重要跨越时,应适当缩短放线区段长度。73.2.1.3牵张场的布置各施工班组根据现场实际情况自行选择、布置牵张场。理论上应遵循如下要求:①、牵引场布置牵引机、回收地线或导引绳用的空线盘。牵引场选择尽可能在顺线路方向,道路条件差的地方,也可选择在线路外侧,牵引绳通过转向轮后进牵引机。施工开始时,牵引机应缓慢加速到每分种5m的速度,正常牵引速度可增加到最大值每分种15m~20m。②、张力场布置有张力机、放线架等。张力场尽可能选择在顺线路方向,张力机必须要保证恒定的张力,光缆至少在张力轮上缠绕5圈固定。③、受地形限制,牵引场转向布置时,各转向轮的转角不得超过30°,转向滑轮和地锚应经计算确定。导线牵引场平面布置示意图1,导线张力场平面布置示意图2。过渡绳牵引绳牵引绳锚桩小牵中张锚桩锚桩锚桩图1导线牵引场平面布置示意图导线过渡绳牵引绳8小张中牵锚桩锚桩图2导线张力场平面布置示意图牵张场布置情况一览表表一(新建段)放线范围耐张长度牵引场张力场备注33#-28#3415米33#28#跨越高速1次28#-20#5949米20#28#跨越高速1次20#-15#3215米20#15#跨越高速2次、15#-11#2387米11#15#跨越110KV线路1次表二(改造段)放线范围耐张长度牵引场张力场备注175#-166#5016米166#175#166#-158#5655米166#158#158#-149#5427米149#158#149#-136#4299米149#136#136#-127#4376米127#136#127#-114#4745米127#114#9114#-106#3315米106#114#3.2.1.4悬挂放线滑车放线滑车一般要求,轮径、轮槽尺寸及使用材料应与导地线相适应,确保导地线通过时不受损伤;滑轮的磨擦阻力系数应不大于1.015,同一放线区段内应使用滑轮磨擦阻力系数接近的滑车。对于一般直线塔选用的放线滑轮直径不小于264mm,对于大跨越档直线塔和耐张塔选用的放线滑轮直径不小于600mm,使用前应逐个检查滑轮,并保证其转动灵活。对已放地线的杆塔采用提线系统(6T手链和φ15.
本文标题:放线作业施工方案
链接地址:https://www.777doc.com/doc-5633540 .html