您好,欢迎访问三七文档
当前位置:首页 > 电子/通信 > 数据通信与网络 > 软件测试技术复习资料
rack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetricButypesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-ⅱhydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetricypipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravelbackfillmaterialtothesurface,and1:100slopedrainagetogutters.Gutterwidth0.5Mdepth0.5m,M5groutedrubblemasonry.9.2mainengineeringcontentthisstandardpressurepipeandthemetalstructureinstallationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);一、填空题1.完整的测试应包括(制定测试计划)(设计测试方案)(测试准备和测试环境的搭建)(执行测试)(测试评估)。2.设计测试用例时应包括(输入数据)和(预期结果)。6.对面向过程的系统采用的集成策略有_____自顶向下集成______________、_________________自底向上集成__两种。7.软件测试主要分为__单元测试、集成测试、系统测试、验收测试_四类测试。8.黑盒测试用例设计方法包括等价类划分、边界值分析、_以及_____因果图,错误推测法等。9.测试工作就是进行输入、接受输出、检验结果,不深入代码细节,这样的测试方法称为________黑盒测试________,10.白盒测试是根据程序的(内部逻辑)来设计测试用例1、在测试执行结束后应该提交的文档有:测试问题报告、测试记录报告、阶段问题统计报告。2、在测试总结后应该提交的文档有:测试问题分析报告、测试总结报告。3、RAD方法中由于根本的需求没有被冻结,所以用户在设计的过程中是迭代的。4、在RAD环境的测试是基于开发过程中的用户改进迭代。5、在RAD方法中由于设计、编码和集成的反复循环性,导致了测试的设计、执行等的循环性。6、测试项目的流程中一般有测试策划、测试设计、测试准备、测试执行、测试总结五个阶段。7、在测试规划过程中,应对测试内容、测试需求的资源、测试通过的标准、测试进度和风险进行计划。8、在测试设计过程中,应做出测试计划、测试用例,并要经过评审。9、在执行测试的过程中应该注重用例执行时系统的实际动作和输出的真实准确记录。10、所有的测试都应追溯到用户需求。11、在集成测试的过程中,由于采用的测试策略不同,需要集成测试人员自己去编写驱动器和桩模块。12、软件=程序+数据+文档+服务。13、代码评审主要做代码审查工作。14、软件测试主要分为单元,集成,系统,验收四类测试。rack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetricButypesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-ⅱhydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetricypipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravelbackfillmaterialtothesurface,and1:100slopedrainagetogutters.Gutterwidth0.5Mdepth0.5m,M5groutedrubblemasonry.9.2mainengineeringcontentthisstandardpressurepipeandthemetalstructureinstallationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);215、测试人员A在测试中发现系统20个缺陷,测试人员B在系统中发现了30缺陷,他们有5个缺陷是一样的,从理论上分析,系统大概存在120个缺陷?测试员A发现n个缺陷,B发现m个缺陷,共同缺陷m1个,理论上总的缺陷N=m/m1*n16、网络通讯三个要素,包括协议、IP、端口。17、在32位的系统中,inta,charb分别占用4、1字节。18、软件验收测试包括:正式验收测试,alpha测试,beta测试。19、系统测试的策略有:功能测试,性能测试,可靠性测试,负载测试,易用性测试,强度测试,安全测试,配置测试,安装测试,卸载测试,文挡测试,故障恢复测试,界面测试,容量测试,兼容性测试,分布测试,可用性测试20、设计系统测试计划需要参考的项目文挡有:软件测试计划,软件需求工件和迭代计划。21、对面向过程的系统采用的集成策略有:自顶向下,自底向上两种。22、通过画因果图来写测试用例的步骤为:(1)分析软件规格说明描述中,哪些是原因(即输入条件或输入条件的等价类),哪些是结果(即输出条件),并给每个原因和结果赋予一个标识符。(2)分析软件规格说明描述中的语义,找出原因与结果之间,原因与原因之间对应的是什么关系?根据这些关系,画出因果图。(3)由于语法或环境限制,有些原因与原因之间,原因与结果之间的组合情况不可能出现。为表明这些特殊情况,在因果图上用一些记号标明约束或限制条件。(4)把因果图转换成判定表。(5)把判定表的每一列拿出来作为依据,设计测试用例。23、代码评审主要做检查代码编码是否规范工作。27、单元测试中,自底向上需要__驱动__模块,自顶向下需要_桩___模块。二、判断题1.好的测试员不懈追求完美。(×)2.测试程序仅仅按预期方式运行就行了。(×)3.不存在质量很高但可靠性很差的产品。(√)4.在没有产品说明书和需求文档的条件下可以进行动态黑盒测试。(√)5.静态白盒测试可以找出遗漏之处和问题。(√)6.测试错误提示信息不属于文档测试范围。(×)7.单元测试能发现约80%的软件缺陷。(√)8.代码评审是检查源代码是否达到模块设计的要求。(√)9.自顶向下集成需要测试员编写驱动程序。(×)10.总是首先设计黑盒测试用例。(√)rack,door(ga
本文标题:软件测试技术复习资料
链接地址:https://www.777doc.com/doc-5877705 .html