您好,欢迎访问三七文档
管理制度中国葛洲坝集团电力有限责任公司大城县15兆瓦光伏发电工程项目部I目录第一篇:分包单位管理制度一、分包队入场手续办理管理规定····································2二、分包队管理人员考勤制度·······································3三、分包商民技工考勤与工资发放管理办法····························4四、分包队营地管理规定············································14五、分包队安全文明施工奖惩制度····································21第二篇:安全文明生产管理制度六、分包队安全文明施工管理总则····································27七、安全文明施工责任制············································29八、安全施工教育培训制度··········································37九、安全交底制度··················································39十、安全施工检查制度··············································41十一、安全文明工作例会制度········································44十二、现场文明施工环境保护管理制度································46十三、施工垃圾和废旧物资管理规定··································48十四、脚手架搭设、拆除、使用管理制度······························50十五、特种作业人员管理制度········································52十六、临时用电管理制度············································54十七、消防保卫管理制度············································56十八、防护用品、安全设施管理及使用制度····························58十九、车辆交通安全管理制度········································62第三篇:施工质量管理制度二十、施工现场工程质量管理制度总则································65二十一、技术资料管理制度··········································67二十二、样板工程管理制度··········································69II二十三、质量检查验收制度··········································73二十四、工程质量挂牌制度··········································75二十五、隐蔽工程验收制度··········································76二十六、技术交底制度··············································78二十七、设备、材料管理制度········································80第四篇:质量通病防止手册二十八、光伏电站质量通病防止手册··································81-1-第一篇:分包单位管理制度-2-分包队入场手续办理管理规定目的:为了加强对劳务分包单位人员的管理,使所选择的分承包方能满足我项目部的要求,以确保整个工程质量和进度,避免出现劳务纠纷,并保证对分包队伍的管理更加规范、有效,达到统一管理,规范行动,特制订本制度。适用范围:所有分包单位细则:1、入场前,分包队必须提供劳务分包合同复印件、公司资质、以往业绩、委托任命书,均需加盖公章;2、开工前,分包单位必须提供所有民技工的花名册(包含姓名、性别、年龄、身份证号、工种);管理人员(项目经理、施工八大员)的花名册(包含姓名、性别、年龄、身份证号、工种、联系方式);3、分包单位必须提供所有人员的身份证复印件、一寸照片、最近半年内正规医院体检合格报告(或健康证)、所购买意外险的支付证明、特种作业人员的证件复印件、管理人员资质证书;4、所有进场施工人员必须通过三级安全教育;5、以上审核通过后由项目部统一办理入场证,并随身携带备查;6、进入现场时施工人员需统一工作服,安全帽,在厂门口排队依次打卡考勤;7、分包单位需指派专人负责,确保打卡考勤顺利进行,项目部每天定时收集考勤信息,作为发放民技工工资的凭证;8、后续进场的施工人员必须补办以上手续。中国葛洲坝集团电力有限责任公司大城县15兆瓦光伏发电项目部2016.5-3-分包队管理人员考勤制度目的:为了加强对分包单位的管理,确保本项目的工程质量、施工进度、施工安全文明以及环境保护,并保证对分包队伍的管理更加规范、有效,达到统一管理,规范行动,特制订本制度。适用范围:各分包队具体细则:1、分包队管理人员包括项目经理、施工八大员(施工员、质量员、安全员、标准员、材料员、机械员、劳务员、资料员)等;2、各管理人员必须各司其职,持证上岗;3、各管理人员每天必须到施工现场项目部签到;4、管理人员应急需要离开现场时,必须提前做好本职交接工作,到项目部填写请假单,获得项目部经理批准后方可离开;5、管理人员无故旷工者参照《分包队安全文明施工奖惩制度》进行考核。中国葛洲坝集团电力有限责任公司大城县15兆瓦光伏发电项目部2016.5-4-分包商民技工考勤与工资发放管理办法目的:根据集团公司要求,为控制用工风险,规范民技工工资管理,维护和保障民技工合法权益,防范分包商劳务纠纷,结合公司实际情况,制定本规定。适用范围:适用于项目部,各分包商细则:一、民技工考勤规定1、分包商民技工进场、退场3日内,分包商填写《民技工花名册》(见附件1),经民技工本人、班组长、分包商负责人签字后,报送项目部,项目部核对信息的真实性、准确性。2、民技工进场需要在规定的时间地点内打卡考勤,分包商指定专人负责打卡事宜顺利进行,可根据人员数量增减考勤机数量。3、项目部每天收集考勤信息,对照《民技工花名册》清点现场民技工人数,填写《民技工考勤表》(见附件2),分包商授权经办人签字确认。4、项目部每月3日前,统计、汇总并打印上月的《民技工考勤月报表》(见附件3),分包商班组长和现场负责人签字确认。5、《民技工考勤表》、《民技工考勤月报表》原件由项目部存档,工程完工后整理成册。二、民技工工资规定1、分包商民技工工资实行代付制。2、分包商民技工工资按照预发工资和预留工资相结合的方式发放。3、预发工资根据民技工考勤,按照1000元/人/月标准,支付给分包商。4、预留工资以银行卡和现金相结合的方式代付给民技工。5、预留工资根据民技工花名册和民技工考勤,按发放节点实行不定期代付。发放节点为民技工退场、项目完工、秋季开学、春节等。6、民技工进场一周内,分包商按照《民技工开立银行卡信息汇总表》(见附件4)收集办卡资料,银行卡在项目所在地办理。-5-7、项目部按照《民技工工资银行卡发放表》(见附件5)要求,将卡发放到民技工本人。8、根据公司审批的《民技工工资发放表》(见附件6),分包商出具代付委托后,由资金管理中心直接支付到民技工工资银行卡特别规定:1、分包商办理尾款支付,民技工工资必须已全部支付完毕,并出具《民技工工资发放承诺书》(见附件7)。2、严禁与分包商串通,套取民技工工资或挪作他用。3、严禁将代付到民技工本人的工资直接支付给分包商负责人或现场负责人。4、本办法自下文之日起执行,原相关办法、规定同时废止。中国葛洲坝集团电力有限责任公司大城县15兆瓦光伏发电项目部2016.5-6-附件1分包商民技工花名册工程名称:班组名称:制表时间:年月日序号姓名身份证号码从事岗位月工资标准(元)进场时间退场时间联系电话签字(按手印)123456789…本表已包涵我班组所有施工范围和界限内的所有进场从业人员,不存在遗漏。后期若因工程需要增加班组人员花名册,本人将按贵单位要求在进场3日内进行补报,若因本人未及时补报或弄虚作假带来的任何责任由我本人承担,与贵单位无关。若出现任何纠纷,我本人愿意接受贵单位的处罚,同时愿意接受其他行政主管部门依照有关规定作出的其它处罚决定。班组长:(签字并按手印)分包商现场负责人:(签字盖章)-7-附件2民技工考勤表项目名称:分包商名称:日期:序号班组名称工种姓名考勤工种姓名考勤12-8-3…说明:出勤打“√”,缺勤打“O”,队长、班长在考勤栏内手签。本表已包涵我单位在此项目所有施工范围和界限内的所有进场从业人员,不存在遗漏。若因本人漏报、错报或弄虚作假带来的任何责任由我本人承担,与贵单位无关。若出现任何纠纷,我本人愿意接受贵单位的处罚,同时愿意接受其他行政主管部门依照有关规定作出的其它处罚决定。分包商经办人:-9-附件3民技工考勤月报表项目名称:班组名称:分包商(盖章):填报时间:序号姓名身份证号考勤记录出勤天数合计签字12345678910111213141516171819202122232425262728293031注:出勤在对应的日期下打“√”,否则打“O”。本表已包涵我单位在此项目所有施工范围和界限内的所有进场从业人员,不存在遗漏。若因本人漏报、错报或弄虚作假带来的任何责任由我本人承担,与贵单位无关。若出现任何纠纷,我本人愿意接受贵单位的处罚,同时愿意接受其他行政主管部门依照有关规定作出的其它处罚决定。班组长(签字并按手印):分包商负责人(签字并按手印):-10-附件4民技工开立银行卡信息汇总表项目名称:序号姓名性别工种工资标准身份证号码身份证有效期手机号码分包商名称备注备注:1、输入以上个人信息时每一单元格内前后中间不能有空格,必须提供身份证正反面扫描件,其他证件银行不予办理。2、所有项目必填。-11-附件5民技工工资银行卡发放表项目名称:年月日分包商名称(盖章):班组名称:序号姓名性别身份证号联系方式开户银行及卡号工种签字、按手印班组长(签字、手印):分包商现场负责人(签字、手印)-12-附件6民技工工资发放表项目名称:发放时段:年月日至年月日分包商名称(盖章):班组名称年月日序号姓名性别身份证号码开户银行及卡号工种出勤(天)本次应发工资(元)本次实发工资(元)签字、按手印合计该工资发放表已涵盖本班组本期所有施工范围和界限内的所有从业人员,不存在遗漏。若因弄虚作假带来的任何责任由我本人承担,与贵单位无关。若出现任何纠纷,我本人愿意接受贵单位的处罚,同时愿意接受其他行政主管部门依照有关规定作出的其它处罚决定。班组长(签字、手印):分包商现场负责人(签字、手印):-13-附件7民技工工资发放承诺书中国葛洲坝集团电力有限责任公司项目部:1.项目现已完工,我公司承诺已将所使用的所有民技工的劳务工资全部发放完毕,不存在漏发、欠发情况,若发生民技工工资纠纷,由我公司承担全部法律责任。2.本承诺书一式两份,本单位和贵单位各留一份。特此承诺劳务分包商(公章):承诺人:法定代表人:日期:年月日-14-分包队营地管理规定第一章总则第一条为了规范项目部下属施工队生活营地的管理,建立整洁干净明亮的办公、生活环境,以树立中国葛洲坝集团电力有限责任公司的良好形象,特制定本规定。第二条施工队营地管理包含营地消防管理、环境卫生、公共娱乐以及食堂和人员作息等,施工队全体员工必须认真遵照执行。第三条生活营地的总体规划是由项目部完成,其营地内房产、相关设施等均为项目部所有权,各施工队负责合
本文标题:项目管理制度-完成
链接地址:https://www.777doc.com/doc-607208 .html