您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 施工组织 > 高速铁路超长无缝线路应力放散技术
20121241CONSTRUCTIONTECHNOLOGY710014、。。、、、、。、。TU731.3A1002-84982012S1-0207-03DiscussiononHighSpeedRailwayContinuousWeldedRailStressReliefLiZhenweiLogisticsServiceCentreXi’anRailwayVocational&TechnicalInstituteXi’anShaanxi710014ChinaAbstractChina’shigh-speedrailwayandthemainlineareusingalargenumberoftheintervaltransintervalcontinuousweldedrailstructure.Continuousweldedrailchangesthestructureoftrackconnectionmodereducesthetraininthejointareaofshockandvibrationandbringsmanybenefitstotrainoperationandthetrafficsafety.TheprincipleofCWRtem-peraturestressandtherelationshipoflockedrailtemperaturestressreleaseconditionsstressrelieforganizationattentiontomattersareelaborated.Ithasanimportantroleinmasteroflockedrailtemperaturetimelyreleasingstresstopreventtheriseoftrackavoiddrivingsafetyandpersonalsafetyaccidents.Keywordshighspeedrailwaycontinuousweldedrailstressrelieving2012-09-27E-mailsxxalzw@126.com。、。、、、、、、。。11continuousweldedrail。、25m250~500m。、、。2。12~4、、。。。。3、。4。σtσt=E×ε=E×α×Δt702EE=2.1×105MPaεΔt℃α11.8×10-6/℃。σt=2.5×ΔtN。PtPt=2.5×Δt×FΔt℃Fmm2。、。Δt。。。。、、、、。21。。。、、、。2。3。。±5℃。4。5。、。。。、、。3、、、。3.1、。《》。15℃。2。35℃、10℃。4。5。6。7。8。9。3.2。50~100m。3.3ΔL=αT-T0LΔLmmα0.0118/℃LmT0、、T0=T+T+T/3T。100m、。3.41、、、、、、、。2、、“”、。38022012。4①、≤500m。。②100m。③20m。④7500m1。。⑤1。⑥。⑦。⑧。100~140N·m。50m500℃。⑨。。41、、、。2、、、、、。3“”。4。、。5。6。7、。8、。9。5、。、。1S.2006.2200~250km/hS.2008.3.M.2003.4.M.2004.9022012
本文标题:高速铁路超长无缝线路应力放散技术
链接地址:https://www.777doc.com/doc-6084211 .html