当前位置:首页 > 建筑/环境 > 给排水/暖通与智能化 > 凤坑隧道防排水施工方案
中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案1目录目录····················································································11工程概况················································································22主要工程数量··········································································23施工准备情况··········································································23.1施工管理人员名单·································································23.2主要机械设备计划··································································34工期、进度计划及劳动力安排。··················································34.1工期及进度计划·····································································34.2劳动力安排···········································································35施工方案及施工方法·································································45.1隧道衬砌防水施工方案:·························································45.2隧道衬砌防水施工方法:·························································45.3隧道衬砌排水方案:·······························································85.4隧道衬砌排水施工方法:·························································86.1保证工期的方法···························································································106.2施工技术保证·······························································································109质量安全保证体系及措施··························································109.1建立质量安全管理领导小组····················································109.2质量保证措施······································································119.3安全保证措施······································································11中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案2凤坑隧道防排水施工方案1工程概况凤坑隧道设计为上下行分离式隧道,进口位于广宁县洲仔镇田兴屋村,出口位于洲仔镇凤村,洞身横穿一座连续山丘,山顶最大高程约235m,隧道最大埋深约138m。隧道左线起讫桩号为ZK77+099~ZK77+861,长762m;隧道右线起讫桩号为YK77+098~YK77+893,长795m。左右线隧道间距40m左右。隧道左线平面除出口段674.44m位于R=3720的圆曲线上外,其余设在直线上,纵坡面设坡率为+1.720%的单向坡;隧道右线平面为R=3450m圆曲线,纵断面设坡率为+1.530%的单向坡。2主要工程数量主要工程数量表序号项目名称单位数量备注1350g/m2无纺土工布m242277.421.2mmPVC防水板m3418973中埋式橡胶止水带m700.64钢筋卡Kg1545.15钢板腻子止水带m3659.76φ8cmHDPE双壁打孔波纹管m6587.97φ10cmHDPE双壁打孔波纹管m3147.58φ10cm半圆软式透水管m42569Ω型弹簧排水管m541910φ10cmPVC管m452.43施工准备情况3.1施工管理人员名单姓名职务电话号码李伟杰项目经理13580618969李杰项目总工13580618680高玉华质检工程师13556513117刘孝堂安检工程师13435803755先锐隧道工程师13138537706中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案3邹斌作业队队长13556531366简平现场领工员13679565973王勇现场领工员13556530276喻健测量工程师13556528315邱海明物资管理员134253869083.2主要机械设备计划机械名称规格型号单位数量备注防水板焊接机台43.3材料准备情况序号项目名称单位数量备注1350g/m2无纺土工布m242277.4据工程进度及时近场21.2mmPVC防水板m341897据工程进度及时近场3中埋式橡胶止水带m700.6据工程进度及时近场4钢筋卡Kg1545.1据工程进度及时近场5钢板腻子止水带m3659.7据工程进度及时近场6φ8cmHDPE双壁打孔波纹管m6587.9据工程进度及时近场7φ10cmHDPE双壁打孔波纹管m3147.5据工程进度及时近场8φ10cm半圆软式透水管m4256据工程进度及时近场9Ω型弹簧排水管m5419据工程进度及时近场10φ10cmPVC管m452.4据工程进度及时近场4工期、进度计划及劳动力安排。4.1工期及进度计划计划工期:2007年6月20日至2008年8月20日完成主体工程砼衬砌施工指标:63m/月。防排水设施随砼衬砌进行。4.2劳动力安排调遣有丰富施工经验的施工作业队伍和技术人员。隧道施工各作业班组配置人员如下:⑴防水板、无纺布挂设及各种型号排水管安设固定20人。⑵综合班:20人(风、水、电管理维护,零星工程)中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案45施工方案及施工方法隧道的防、排水遵循“防、排、截、堵相结合,因地制宜,综合治理”的原则,形成完整的防排水系统,达到防水可靠、排水畅通,使隧道建成后达到洞内基本干燥的要求,保证结构和设备正常使用及行车安全。5.1隧道衬砌防水施工方案:5.1.1混凝土自防水:隧道衬砌结构均采用防水混凝土,防水混凝土抗渗等级不小于S8。5.1.2洞身衬砌结构防水:采用半包防水。隧道洞身、横通道及各种附属洞室在初期支护和二次衬砌之间拱部至边墙脚下纵向排水管范围设350g/m2无纺布和1.2mm厚PVC防水板。5.1.3特殊部位防水:每处环向施工缝设置钢板腻子止水带进行止水,沉降缝设置在隧道围岩衬砌形式变化处或连续30m~80mⅣ级、Ⅴ级围岩处,沉降缝在结构混凝土中部埋设橡胶止水带。5.2隧道衬砌防水施工方法:5.2.1初期支护基面的准备:隧道开挖并进行初期支护后,喷射砼基面仍可能相当粗糙,局部凹凸不平,并有锚杆头外露现象,个别地方表面有渗水现象。若直接铺设防水卷材,其防水质量难以保证。因此,在防水卷材铺设前应对喷射砼基面进行认真处理,处理控制要求如下:(1)基面平整度要求喷射砼基面凹凸显著时,对防水层的施工质量影响巨大,关键在于难以正确的确定防水板的富余长度,防水板的富余长度不足时,则防水板铺设过紧,在混凝土浇注压力作用下防水板有可能断裂或接头分离,使防水板卷入混凝土中,完全失去防水层的作用;或防水板与初期支护之间形成过大空隙,这种影响在拱部特别明显,是导致衬砌厚度不足的原因之一。防水板富余长度过大时,则防水板的铺设过松,一方面增大施工成本造成了浪费,另一方面拱部因板的挠度也是产生空洞的原应之一。(2)喷射砼基面修整方法与要求如下:①填平补齐凹坑用喷射砼将凹凸不平的初期支护基面“填平补齐”使之圆顺。其表面平顺的标准是凹部的矢跨比要小于1/6~1/10(边墙D/L≤1/6,拱顶D/L≤1/10)。如设有钢支撑时,不要在相邻两榀钢支撑之间留有较大的凹槽,必须喷平。②切断抹平尖锐凸出物:当基面有钢筋或凸出的管道口时,应先切断再用锤铆平,后用砂浆抹平。当基面有外露锚杆头时,应切断后用保护砂浆覆盖。5.2.2防水层施工:中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案5防水板的铺设应超前衬砌混凝土的施工,超前距离宜为10~20m。防水板的施工采用专用自制滑轮式专用作业台架。①铺设缓冲层用热融塑料衬垫将无纺土工布贴在初期支护表面,然后用射钉枪钉上水泥钉锚固,锚固点密度为拱顶3~4点/㎡,边墙2~3点/㎡。水泥钉长度不小于5㎝。(2)防水板施工:防水板施工缝构造图防水板搭接防水大样图岩面初期支护2350无妨土工布二次衬砌防水板中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案62350无妨土工布塑料垫片间距:拱部50腰部70边墙100防水板垫片间距分区图70区100区100区70区50区大样图射钉初期支护塑料垫片防水板二次衬砌①安装防水板张挂防水板时,应确定保有一定的富余长度,板的长度应比初期支付表面的轮廓线长度大10%左右,特别是在表面有凹槽的情况下时,张挂不要过紧,应考虑在灌注的混凝土的挤压下,防水板能够有与初期支护的表面密贴的可能。防水板在拱部和边墙按环状由拱顶向两则铺设,铺设前先行试铺,并加以调整,在土工布锚固点的热融材料衬垫处用专用的平头烙铁将防水板与衬垫热合,由于衬垫与防水板为同质材料,故两着热合牢固,质量可靠②防水板的结合本幅防水板与上幅防水板接头在洞内采用双缝自动爬行热合机进行焊接,下部防水板应压住上部防水板,两幅防水板的搭接宽度12㎝,单条焊缝的有效焊接宽度不小于中铁二局第一工程有限公司二广高速公路怀集至三水段第21合同段凤坑隧道防排水施工方案715㎜,焊接严密,不得焊焦焊穿。为保证现场焊接质量,可在施焊时在防水板接头内侧放置长2m,宽约20㎝的木版,以形成焊接平整面。(3)防水板的铺设质量检查①直观检查用手托起防水板,看其是否和喷射砼密贴;看防水板是否被划破、扯破、扎破等破损现象;看焊缝密度是否符合要求,有无漏旱、假旱、焦旱、考焦现象;看外露的锚固点是否有塑料片覆盖。②压缩空气检查:首先封闭检查接头的两端,把检查针插入检查沟,用泵以适当压力(约0.25MPa)压入压缩空气;15min的气压下降值不小于10%为合格。检查合格后插入检查针的位置应进行修补。检查频率为每一模检查一次以上。(4)防水板的保护防水层施工后安装钢筋和浇筑二衬混凝土时,应特别注意不要损伤防水板:设置临时挡板,防止机械损伤和电焊火花灼伤防水板。浇筑砼时,振捣棒不得直接接触防水板;浇筑拱顶时防止防水板绷紧;泵送混凝土灌注孔附近涌出的混凝土直接接触砼,也可能使防水板破损,要进行必要的保护。安装堵头板时,堵头板一般在现场用木板加工而成,在与防水板接触时也可能使其破损,必要时可在堵头板与防水板之间设置缓冲垫。5.
本文标题:凤坑隧道防排水施工方案
链接地址:https://www.777doc.com/doc-6134218 .html