您好,欢迎访问三七文档
当前位置:首页 > 行业资料 > 其它行业文档 > 低CN条件下双污泥系统运行参数分析李响
:1009-6825(2008)36-0007-02C/N*:2008-08-20 *:863(:2002AA601012-1A): (1987-),,, 210096李 响 :对双污泥系统处理工艺的运行机理和特点进行了介绍,将影响反硝化除磷的运行参数及处理效果进行了分析,最后总结出各段优化运行参数,从而促进低C/N条件下双污泥系统运行的研究。:双污泥系统,反硝化除磷,运行参数,C/N:X703:A ,,(GB18918-2002),。(A2O),:1):;2):;3):,。,;,。1 、1.1 DEPHANOX工艺1992,Wanner:。Kuba[1],DEPHANOX,1。DEPHANOX:1)DPB,。2),SRT。3),CODPHB,PHB,,C/N。R.orm,DO0.2mg/L,3.0mg/L~4.0mg/L[2],,1。4.8L/d,24L/d。1 R.ormC/NT℃pHISRTdSVIHRThCODmg/LCODmg/LTNmg/LNO-3-Nmg/LTPmg/LTPmg/L4.7247.8103823200344211.66.40.6 。C/N,600mg/L,;,,DPB,。,C/P,1mg7mg~9mg。1.0mg/L,BOD/P20∶1COD/P40∶1。,。1.2 A2N工艺A2NA/OCOD50%,COD,C/N;,,2。KubaC/N=3.4,,NH+4-N,C/N=3.8。C/N3.4,N,NO-3-NDPBPHB;C/N3.4,,DPBNO-3-N。C/N=5,、95%,98%。A2N,N-SBR(SRT),;A2SBR(SRT)14d8d,1%~2%。A2N2。2 A2NC/NTpHininfluentReturnSludgeRatio/%SRT/dTNremoval%TNeffmg/LTPremoval%TPeffmg/L6.496.84~7.453412~1492.74.1897.950.12 ,33%~38%,19.7h,。。,,,,,,2h。45min30minCOD80%[4]。:1.0h,0.5h,1.5h。1.3 改良A2N工艺[5]A2N,3。:(A-N),(A-O),DPB;,,;A2N,,。·7· 第34卷第36期2008年12月 山西建筑SHANXI ARCHITECTURE Vol.34No.36Dec. 2008DOI:10.13719/j.cnki.cn14-1279/tu.2008.36.005:1009-6825(2008)36-0008-03*:2008-08-29 *:“”(:2006BAJ13B04-01): (1978-),,, 450052 (1955-),,,,,,, 450052(1968-),,,,, 450053刘洋 韩阳 巴松涛 :利用数据包络分析方法(DEA)与C2R模型对城市地下管网防灾投入与震害风险进行协调与效率分析,给出算例,并针对算例结果说明协调与效率分析过程,探讨了如何让有限的防灾投入最大地发挥其作用,达到投入与产出的协调与高效。:数据包络分析,地下管网,抗震防灾,协调分析:TU990.3:A ,,,、。。,,。(DEA),,、。1 DEAC2R(DEA)、、。 A2N3。3 C/N/PRangeT/℃pHininfluent/%/%SRTdHRThHRThHRTh26.7/7.67/1~26.6/3/12573005015333 A2N,。NO-3-N=3mg/L,30%。5mg/L,,N/P=4。,8mg/L,5mg/L~8mg/L。2 C/N:1)C/N=3.4~8.7。2)DPB8d~10d,,2h~3h;4h~5h。3)300%;33%~50%。4):DO0.2mg/L,20℃~40℃,pH6.8~8.0;:OPR250mV~300mV,20℃~35℃,pH7.5~9.0;:DO0.5mg/L,20℃~35℃,pH7.0~8.0,5mg/L~8mg/L,。:[1] KubaT.Biologicalphosphorusremovalfromwastewaterbyanaero-bic-anoxicsequencingbatchreactor[J].WatSciTech,1993,27(5):241-253.[2] ShehabO,DeiningerR,PortaF.Optimizingphosphorusre-movalattheAnnArborwastewatertreatmentplant[J].WatSciTech,1996,34(1):493-499.[3] KubaT,VanLocsdrechtMCM,HeijnenJJ.PhosphorusandnitrogenremovalwithminimalCODrequirementbyintegrationofdenitrifyingdephosphatationandnitrificationinatwo-sludgesystem[J].WatRes,1996,42(1):1702-1710.[4] 刘 壮.厌氧快速吸收有机物的启动能源研究[J].中国给水排水,2000,16(5):1-4.[5] LiuHongbo,SunLiping,XiaSiqing.AnefficientDPButiliza-tionprocess:ThemodifiedA2Nprocess[J].BiochemicalEngi-neeringJournal,2008(38):158-163.Analysisonoperationalparametersofseveraltwo-sludgesystemsintheconditionoflowC/NLIXiangAbstract:Themechanismandcharacteristicofseveraltwo-sludgesystemsareintroducedinthispaper.Moreover,theoperationalparametersaffectingdenitrifyingphosphorusremovalandtheefficiencyareanalyzed.Finally,theoptimaloperationalparameterforeveryphaseisgivenout,inordertopromotethestudyofseveraltwo-sludgesystemsinconditionoflowC/N.Keywords:two-sludgesystem,denitrifyingphosphorusremoval,operationalparameters,C/N·8·第34卷第36期2008年12月 山西建筑SHANXI ARCHITECTURE Vol.34No.36Dec. 2008
本文标题:低CN条件下双污泥系统运行参数分析李响
链接地址:https://www.777doc.com/doc-6553474 .html