您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 给排水/暖通与智能化 > 污水厂构筑物计算公式
0.048611111600.866030.020.40.511.30940.010.329280.2200.1776010910.08882.4230.031830.30.731832.170550.071.888880.155650.25307.50.481.9210.80.82.42301.51.6588820.829440.5550.350.990150.20130.062.650.5090.33.20910.11.920.052080.1518.70.2512.513.90830.214.37990.820.61.20.6666711.9832772647.933130s0.117603710.30.706490.051.869192013021.693490.359999850.360.93460.25550.97771.197510.30.252.52771.7132435.043422.51.221440.11222.40.50.63.910.70.65.99127.22022.07362.528772.80.11574074116.944440.061.9290114.80.5030.50.70.610.0153.61.082040.82.528115.920.4828640.51.28640.50.99600.424002250.950.51000001000.041670.5污泥量计算9000.82509910001834.722230002.513.88894.423210.260650.325820.10.084930.912290.093090.408860.00011918926.690.060.120.060.12222.4172230.122.30.150.211590.2325990050010004322216258.6411.520.50.5011.54.50.444440.0341200.1097715135000.03550.43.362.242.81.40.466670.9333361.211.31.014370251.136457791.007159491192.30769232250.950.52000.20.21113.141592651110.20.33.55000.030.19290.495590.020.669050.137660.2250022250.950.55550.5550.50.50.20.20420.20.21441.0456.42111440111111.12838112150.980.752000.30.30.20.40.10.043980.40.20.018670.10.11.4污泥斗上部半径R(m)污泥斗下部半径r(m)圆锥体V1(m3)沉淀部分有效水深h2(m)超高h1(m)缓冲层高度h4(m)沉淀池高度H(m)沉淀池直径D(m)污泥含水率污泥量0.3-0.8S(L/人·d)设计人口数量N(人)污泥部分所需的总容积V(m3)每格池污泥部分所需容积V''(m3)污泥斗高度h5(m)喇叭口与反射板之间的高度h3(m)污水在沉淀池中流速v(m/s)沉淀部分有效段面积F(m2)沉淀时间t(h)两次清除污泥间隔时间T(d)污泥量定额(g/人·d)最大设计流量Qmax(m3/d)中心管内流速V0(m/s)中心管面积f(m2)中心管直径d0(m)污水由中心管喇叭口与反射板之间的流速v1(m/s)喇叭口直径d1(m)接触氧化池接触时间t(h)配水区高度h4,考虑需人检修1.5m,无人检修0.5m接触氧化池总高度H0(m)间触氧化池实际充填率P%比例常数K竖流式沉淀池暴气池内每日活性污泥增长量ΔX(g/d)污泥理论产生率Y(kg(生物量)/kg(降解的BOD5)接触氧化池座数n污水与填料的接触时间t(h)超高h10.5-1m(m)填料上部稳定水层深h20.4-0.5m(m)最大设计流量Qmax(m3/d)去除率η(%)进水悬浮物浓度C0(mg/L)污泥含水率P(%)沉淀污泥密度以1000kg/m3初次沉淀池污泥量m3/d池子总高度H(m)平 流 沉 淀 池 设 计 计 算 表(第一种:无污水悬浮物沉降资料)平 流 沉 淀 池 设 计 计 算 表(第二种:有污水悬浮物沉降资料)截锥部分倾角α(度)中心管底至沉砂砂面的距离h3(m)沉砂部分高度h4(m)圆截锥部分实际容积V1(m3)超出地面高度h1(m)超出地面高度h1(m)水流断面面积A(m)竖流式沉砂池设计计算表最大设计流量Qmax(m3/s)格数n竖流沉砂池中心管流速v1(m/s)中心管直径d(m)池内水流上升速度v2(m/s)池子直径D(m)最大设计流量时的流行时间t(s)沉砂池水流部分高度h2(m)城市污水沉砂量X(m3/106m3)沉砂室同一平流式沉砂池的设计计算表(第一种方法:无砂粒沉降资料)平流式沉砂池的设计计算表(第二种方法:有砂粒沉降资料,最小粒径采用0.2m)两次清除沉砂的时间间隔T(d)生活污水总变化系数KZ沉砂池部分所需容积V(m3)每个沉砂斗容积V0(m3)沉砂池半径R(m)圆截锥部分下底半径r(m)池总高度H(m)水流断面面积A(m2)池子格数n最大设计流量时的流行时间t(s)每格宽度b(m)池总宽度B(m)设计有效水深h2(m)沉砂池长度L(m)验算最小流速vmin(m/s)超出地面高度h1(m)沉砂池总高H(m)最小流量只用一格工作n115℃时静水沉降速度μ0(mm/s)水流水平速度v(m/s)水流垂直分速度ω(m/s)砂粒平均沉降速度μ(m/s)最大设计流量Qmax(m3/s)水面面积F(m2)沉砂斗容积V0(m3)沉砂池底坡度i池底坡长l2(m)沉砂室高度h3(m)最小设计流量Qmin(m3/s)Qmin时的水流断流面积ωmin每一分格沉砂斗数量每个沉砂斗的容积V0(m3)沉砂斗底宽a1(m)斗壁与水平面倾角α(度)沉砂斗高度h'3(m)沉砂斗上口宽a(m)池总宽度B(m)设计有效水深h2(m)两次清除沉砂的时间间隔T(d)城市污水沉砂量X(m3/106m3)生活污水总变化系数KZ沉砂室所需要V(m3)栅条间隙数n(个)最大设计流量时的流速v(m/s)最大设计流量时的流行时间t(s)长度L(m)最大设计流量Qmax(m3/s)水流断面面积A(m2)池子格数n每格宽度b(m)设计流量Qmax(m3/s)格栅倾角α(度)格栅倾角正玄值栅条间隙宽度b(m)栅前水深h(m)过栅流速v(m/s)格栅的设计计算表栅前渠道超高h2(m)栅后槽总高度H(m)栅槽总长度L(m)定额产渣量(m3/1000m3)渐窄部分长度l2(m)形状系数β水头增大倍数k过栅水头损失h1(m)栅槽宽度B(m)最大设计流量Qmax(m3/s)Qmax时的停留时间t(min)沉砂池的总有效容积V(m3)Qmax时的水平流速v1(m/s)每日栅渣量W(m3/d)总变化系数KZ进水渠道宽B1(m)渐宽展开角α1渐宽部分长度l1(m)栅条宽度S(m)污泥斗以上部分污泥容积V2(m3)污泥斗和梯形部分污泥容积V3(m3)污泥含水率格数n沉砂池宽度b(m)池底坡度i单位池长空气量查表(m3/m·h)每格沉砂池实际进水断面A'(m2)沉砂池长度L(m)每格沉砂池沉砂斗容量V0(m3)水平流速v(mm/s)排砂频率(d/次)每格沉砂池实际沉砂量V'0(m3)两次清除污泥间隔时间T(d)污泥量定额(g/人·d)污泥斗容积V1(m3)污泥量0.3-0.8S(L/人·d)污泥部分所需的总容积V(m3)每格池污泥部分所需容积V''(m3)沉淀池个数n(个)包气管浸水深度h3(m)全池总高度H(m)集砂槽槽底宽度b1(m)沉砂池池底坡高h1(m)集砂槽高度h2(m)污水的含砂量(m3/106m3)单位时间内所需空气量q(m3/h)嚗 气 沉 砂 池 设 计 计 算 表(日平均流量Q(m3/S)表面负荷q'(m3/m2·h)池子总表面积A(m2)沉淀时间t(h)沉淀部分有效水深h2(m)沉淀部分有效容积V'(m3)缓冲层高度h3(m)设计人口数量N(人)沉淀池长度L(m)沉淀池宽度B(m)每格池宽b(m)进出水BOD5差Sr(mg/L)污泥内源呼吸率Kd(1/d)堰上水宽(m)水力坡度i(%)出水堰长L(m)出水堰计算过水断面面积A(m2)最大设计流量Qmax(m3/d)出水堰负荷q(L/(s*m))出水堰长L(m)出水堰直径D(m)集水槽宽b(m)集水槽起端高度h0(m)堰自由跌落Δh(m)湿周f(m)堰上水头(m)堰为等腰直角三角形填料总有效容积W(m3)填料层高度H一般取3m(m)接触氧化池总面积A(m2)每座接触氧化池面积f〈=25(m2)流速V(m/s)填料层间隙高度h30.2-0.3m(m)填料层数m处理水BOD值Se(mg/L)原污水bod5值S0(mg/L)BOD-容积负荷率,Nw(gBOD5/(m3*d)水力半径R(m)校核堰上负荷实际堰长堰后自由跌落水头损失总水头损失堰高(m)堰宽(m)斜板区上部水深h2(m)斜板高度h3(m)池内停留时间t(h)每立方米污水需气量Do8-10(m3/m3)需气量D(m3/d)计算堰数n实际堰数安全堰上宽接触氧化池日平均污水量Q(m3/d)最大设计流量Qmax(m3/d)池子个数n设计表面负荷q',一般3-6(m3/(m2*h)池子水面面积F(m2)圆形池子直径D(m)方形池子边长a(m)设计人口数量N(人)污泥部分所需的总容积V(m3)每格池污泥部分所需容积V''(m3)污泥斗高度h5(m)两次清除污泥间隔时间T(d)污泥量定额(g/人·d)污泥含水率污泥量0.3-0.8S(L/人·d)斜管沉淀池沉淀池高度H(m)污泥斗上部边长a2(m)方锥体V1(m3)超高h1(m)斜板区底部缓冲层高度h4(m)污泥斗上部半径R(m)污泥斗下部半径r(m)圆锥体V1(m3)污泥斗下部边长a1(m)幅流式沉淀池最大设计流量Qmax(m3/d)设计表面负荷q',一般1.5-3(m3/(m2*h)池子水面面积F(m2)池子个数n每个池子表面积A1(m2)池子直径D(m)沉淀时间t一般初1-5h,二1.5-2.5h有效水深h2(m)两次清除污泥间隔时间T(d)污泥部分所需的总容积V(m3)每格池污泥部分所需容积V''(m3)污泥斗高度h5(m)污泥斗上部半径R(m)污泥量定额(g/人·d)污泥含水率污泥量0.3-0.8S(L/人·d)设计人口数量N(人)方锥体V1(m3)超高h1(m)缓冲层高度h4(m)沉淀池高度H(m)污泥斗下部半径r(m)圆锥体V1(m3)污泥斗下部边长a1(m)污泥斗上部边长a2(m)
本文标题:污水厂构筑物计算公式
链接地址:https://www.777doc.com/doc-6578351 .html