您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 设计及方案 > 园林景观绿化、铺装工程施工组织设计方案
word格式文档专业整理施工组织设计编制单位:大连亿强园林景观工程有限公司编制日期:2016年5月31日word格式文档专业整理一、编制概要·····························-4-1、编制依据:···························-4-2、施工组织设计编制特别说明:···················-4-二、工程概况·····························-6-三、施工方案及技术措施························-6-1、场地平整及测量工程·······················-6-2、绿化苗木栽植工程施工······················-7-3、绿化苗木移植施工方案·····················-12-4、花岗岩、混凝土砖地面铺装施工方案···············-14-5、沥青混凝土施工方案······················-17-6、毛石挡土墙施工方案······················-23-7、木栈道、木栏杆工程施工····················-26-8、金属栏杆工程施工·······················-27-四、质量保证措施和创优计划·····················-27-1、保证质量的管理措施:·····················-27-2、保证质量的技术措施······················-29-3、创优计划···························-32-五、施工总进度计划和各阶段进度与保证措施:·············-32-1、施工总进度计划························-33-2、施工进度计划保证措施·····················-33-3、主要施工机械、办公、检测设备投入、进场计划及保证措施·····-34-4、劳动力投入计划及、持证上岗及保证措施·············-35-六、施工安全措施计划························-37-1、安全生产目标计划·······················-37-2、安全管理措施·························-37-3、安全生产要素管理网络·····················-38-4、安全保证体系·························-38-5、施工用电安全生产措施·····················-39-6、中小型机械安全生产措施····················-40-7、其它安全生产措施·······················-40-七、文明施工措施计划························-40-1、施工现场保证措施如下:····················-41-2、防噪音、防尘措施·······················-41-八、施工场地治安保卫管理计划及消防措施···············-41-1、工地成立治安、消防小组。···················-41-九、施工环保措施计划························-42-1、保护措施···························-42-2、控制排污···························-42-3、降低施工噪音·························-42-4、弃土安排···························-42-5、控制扬尘···························-43-十、冬季和雨季施工方案·······················-43-1、园林、景观工程冬季施工方案··················-43-word格式文档专业整理2、园林、景观工程雨季施工方案··················-46-十一、施工现场总平面布置······················-48-1、施工现场总平面布置原则····················-48-2、其它临建系统布置·······················-48-十二、项目组织管理机构·······················-48-1、组建项目经理部························-48-2、确立工程各项管理目标·····················-49-3、开工前施工准备工作······················-50-十三、承包人自行施工范围内拟分包的非主体和非关键工作、劳动力、材料、投入计划-50-1、人员动员周期与保证措施····················-50-2、人员、材料进场的方法与保证措施················-51-3、本工程所需的人员、材料进场的方法···············-51-十四、成品保护和工程保修工作的管理措施和承诺············-51-1、成品保护的管理措施······················-51-2、保修承诺···························-52-十五、任何可能的紧急情况的处理措施、预案以及抵抗风险(包括工程施工过程中可能遇到的各种风险)的措施·······················-53-1、组织准备···························-53-2、消防预防方案及处理预案····················-53-3、抵抗风险的措施·······················-53-4、投标报价风险·························-54-十六、对总包管理的认识以及对专业分包工程的配合、协调、管理、服务方案-54-1、对总包管理的认识····················-54-2、项目工程管理的思路·····················-54-3、对各专业分包商提供的主要服务················-55-十七、与发包人、监理及设计单位的配合················-55-1、与发包人的配合措施·····················-55-2、与监理单位的配合措施····················-55-3、与设计单位的配合措施····················-56-十八、施工重点、难点、关键技术、工艺的分析及解决方案········-56-十九、新技术应用及违约承诺·····················-58-1、新技术应用的具体措施·····················-58-2、新技术应用的验证材料·····················-59-3、新技术应用对节约投资和工期的保证措施·············-60-4、采用新技术可能产生的风险···················-60-5、新技术应用违约承诺······················-60-二十一、对设计图纸、工程量清单、施工管理合理化建议·········-61-二十一、施工项目承包服务承诺····················-61-1、服务目的···························-61-2、成立保修小组·························-62-附表拟投入的主要设备表------------------------------------------------------附表1拟配备本工程的试验和检测仪器设备表--------------------------------------附表2劳动力计划表------------------------------------------------------------附表3计划开、竣工日期和施工进度网络图----------------------------------------附表4word格式文档专业整理施工总平面图------------------------------------------------------------附表5临时用地表--------------------------------------------------------------附表6word格式文档专业整理一、编制概要1、编制依据:(1)、《工程招标文件》。(2)、随同文件发送的有关资料。(3)、施工现场的察看和了解。(4)、有关国家法律《中华人民共和国建筑法》、《中华人民共和国消防法》、《中华人民共和国劳动法》(5)、国家、行业技术标准及管理规定1)、《测量规范》(GBJ50026-93)2)、《市政排水管渠工程质量检验评定标准》CJJ3-903)、《市政工程质量检验评定标准(污水处理工程)》JBJ104-914)、《钢筋焊接及验收规范》GBJ18-845)建设部《市政工程基础基础设施工程施工技术文件管理规定》建城【2002】221号6)、《城市道路绿化规划与设计规范》7)、《城市绿化工程施工及验收规范》(CJJT82-99)8)、城市绿化条例9)、城市绿化植树工程施工规范10)、城市绿线管理办法11)、草坪及地被规程规范12)、垂直绿化技术规程13)、国家园林城市标准14)、绿地设计规程15)、园林绿化管养规范16)、园林植物栽植技术规程17)、城市绿化规划建设指标的规定(6)、安全生产规范、规程标准1)、《建筑工程施工现场管理规定》(建设部15号令)2)、《建筑施工工程安全技术规程》(国务院)3)、《建筑机械使用安全技术规程》JGB33-864)、《建筑安全监督管理规定》(建设部13号令)说明:上述规范、标准、规程仅是本工程建设的最基本要求,并未包括实施中所涉及到的所有规定、标准和规程。在施工中对与上述未尽事宜,按国家和地方现行的规定执行。(7)、本企业的施工技术水平、管理水平和成功经验。2、施工组织设计编制特别说明:(1)本施工组织设计在施工中用于指导现场的施工、生产工作。具体施工方案完全满足国家、省、市法律法规及行业强制性等标准,完全服从建设单位、监理、设计等单位对本工程施工的要求,以及招标文件第七章技术标准和要求中的全部要求。如若有本施word格式文档专业整理工组织设计与招标文件、设计图纸、建设单位、监理单位对本工程要求相冲突,我方可与业主签订协议,完全按照上述单位要求保质、保量进行施工。(2)本施工组织设计完全服从招标文件要求、工程实际情况、现有施工条件、业主监理要求,本着充分利用和发挥我公司现有施工实力及技术特长,体现先进性、合理性、可行性的特点为原则来编制,以指导本工程施工,达到快速、优质、高效、安全、质量的管理目标。(3)施工时为保证苗木成活率,按照施工图纸要求进行回填土,对树坑实施整体换土,残土外运等措施。(4)施工时选用的种植土均为为客土、优质熟土,且经建设单位代表及监理工程师检查认可后使用。(5)栽植1)苗木采购施工时苗木的规格及质量严格按照施工图纸要求精心挑选。如果我方中标我方将选择,苗木外形饱满、美观,主干通直,且无伤,无病虫害,并附带检验检疫手续(报经开发区林业部门审验及抽样检查后方可移交苗木)的苗木。我方苗木采购地为大连地区,中标后我方会同建设单位、监察、财政、招标办及监理单位对我方采购苗源进行现场考察,择优采购。2)苗木挖掘、运输苗木挖掘、包装符合园林技术操作规定。3)苗木栽植树木栽植前坑内适量回填种植土,带土坨树种栽植后树根土球上部覆土厚度不超过8公分。4)苗木栽植地形完全按照施工图纸的设计要求及设计说明,进行场地平整及客土回填。5)苗木定植苗木栽植后立即浇足定根水,第一次浇水采取逐步浇灌的方法,直到浇透为止。栽植后浇透水不少于三遍,并及时覆土保墒。(
本文标题:园林景观绿化、铺装工程施工组织设计方案
链接地址:https://www.777doc.com/doc-7296841 .html