您好,欢迎访问三七文档
当前位置:首页 > 办公文档 > 工作范文 > 顶管分包合同(1)范文
想到这里,他立即带上两个测工,肩扛手拎着仪器,硬是徒步走到了现场。sectionoftheDepartmentofprojectmanagement;Projectdocumentsandinformation:ProjectEngineeringDepartment;Materialsandequipment:materialsupplyprojects;Securitycontrols:theprojectDepartmentofsafetyandsecurity;Constructionmachinery:ProjectEngineeringDepartment;Financial:ProjectManagementDepartmentoffinance;Securityandfireservices:projectsecurity.3.3.5managementrepresentativeandprojectmanagerinthisitemspecifiesthattheChiefEngineeristhemanagementrepresentative,responsiblefortheoperationofqualitymanagementsystemandsupervision,regardlessofhowhisotherresponsibilities,shouldhaveaclearmandateto:ensurethatthequalitymanagementsystemisimplementedandmaintained;Therunningofthequalitymanagementsystemtotheprojectmanager,includingneededimprovements;Alwaysbeawarethatthecustomer'sneedsandrequirements.3.43.4.1projectmanagementreviewshouldbeanannualreviewofitsqualitymanagementsystemtoensureitscontinuingsuitability,adequacyandeffectiveness.3.4.2Administrationreviewbytheprojectmanagerresponsiblefororganizationandimplementation,projectqualitycontrolDepartmentisresponsibleforspecifictasks.3.4.3themanagementreviewshouldcompareandevaluatethefollowinginput:internalandexternalqualityauditsandcorrectiveeffect;Customerfeedbackontheconstruction,installation,commissioning,serviceinformation(complaintsandsatisfaction);Qualityrecords,qualitycompliancewithtrendreports,analysisofresults;Combinedwiththequalitypolicyandtheachievementofthegoals,statusandsuitabilityevaluationofthequalitymanagementsystemtodeterminecorrective,preventiveandimprovementmeasuresofperformance.3.4.4evaluationmethodandprocedure(1)review:bytheprojectmanager,projectmanager,functionaldepartmentsandheadsofspecialized劳务分包合同承包人:安徽振江建设工程有限公司(以下简称:甲方)分包人:(以下简称:乙方)依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其它有关法律、行政法规,参照《建设工程劳务分包合同示范文本GF-2003-0214》,遵循平等、自愿、公平和诚实信用的原则,双方就劳务分包事项协商达成一致,订立本合同。一、劳务分包工作对象及提供劳务内容工程名称:湖南省湘潭市芙蓉大桥及北引线工程工程地点:湖南省湘潭市岳塘区分包范围:顶管工程劳务分包内容:顶管施工劳务分包,详见下述。序号项目名称乙方工作内容乙方劳务包含的设备和材料(但不限于)甲方提供的设备和材料备注1开挖工程(井位)降水、排水、机械不到位处人工挖运、清理(含塌方)、修整等手工器具开挖机械2模板工程施工机具准备、模板加工、场内转运、制作、安装、刷隔离剂,脚手架搭设,砼浇筑时模板的维护、拆模、校正加固,自身施工工作面临边防护、周转材料的看护、维修、整理、集中堆放模板、模板制作及安装时所需所有附属材料及设备、脚手架(钢管)无3钢筋工程翻样、提料、除锈、调直、下料、制作、运输、绑扎、钢筋连接(机械或焊接)、安装,预埋件制作安装,保护层垫块的制作、安装,材料场内运输及看管等扎丝、焊条、焊剂等辅材、钢筋加工机械等钢筋、保护层垫块4混凝土工程浇筑、振捣、收光、养护、凿毛(如需要)等混凝土施工所需工器具混凝土想到这里,他立即带上两个测工,肩扛手拎着仪器,硬是徒步走到了现场。sectionoftheDepartmentofprojectmanagement;Projectdocumentsandinformation:ProjectEngineeringDepartment;Materialsandequipment:materialsupplyprojects;Securitycontrols:theprojectDepartmentofsafetyandsecurity;Constructionmachinery:ProjectEngineeringDepartment;Financial:ProjectManagementDepartmentoffinance;Securityandfireservices:projectsecurity.3.3.5managementrepresentativeandprojectmanagerinthisitemspecifiesthattheChiefEngineeristhemanagementrepresentative,responsiblefortheoperationofqualitymanagementsystemandsupervision,regardlessofhowhisotherresponsibilities,shouldhaveaclearmandateto:ensurethatthequalitymanagementsystemisimplementedandmaintained;Therunningofthequalitymanagementsystemtotheprojectmanager,includingneededimprovements;Alwaysbeawarethatthecustomer'sneedsandrequirements.3.43.4.1projectmanagementreviewshouldbeanannualreviewofitsqualitymanagementsystemtoensureitscontinuingsuitability,adequacyandeffectiveness.3.4.2Administrationreviewbytheprojectmanagerresponsiblefororganizationandimplementation,projectqualitycontrolDepartmentisresponsibleforspecifictasks.3.4.3themanagementreviewshouldcompareandevaluatethefollowinginput:internalandexternalqualityauditsandcorrectiveeffect;Customerfeedbackontheconstruction,installation,commissioning,serviceinformation(complaintsandsatisfaction);Qualityrecords,qualitycompliancewithtrendreports,analysisofresults;Combinedwiththequalitypolicyandtheachievementofthegoals,statusandsuitabilityevaluationofthequalitymanagementsystemtodeterminecorrective,preventiveandimprovementmeasuresofperformance.3.4.4evaluationmethodandprocedure(1)review:bytheprojectmanager,projectmanager,functionaldepartmentsandheadsofspecialized5顶进工程铺顶管导轨、设置顶进后背、安装顶进设备及吊放管节、挖土顶进主顶设备、基坑导轨、顶铁和后靠背、起重设备、注浆设备等D1000管材6场内运输上料、下料、捆绑、运料平台搭拆、堆码等所有施工设备无77测量放线内业计算,现场测设、弹线、标记,放控制线、点。油墨、漆、线、铁钉、钢(木)桩等测量仪器、工器具8材料装卸卸车、倒运、分类、拣选、堆码、标识、保护人工机械设备、防护材料、标识9安全文明施工本工程所有施工过程中的安全网、密目封闭防护网、等安全与文明施工设施搭拆、安全防护、现场清洁、材料堆码、标识等人工、安全网、密目封闭防护网、机械设备等安全警示牌、标语牌10劳动保护劳保用品的配置、发放劳保用品(绝缘手套、筒靴、手电筒、雨衣等)、安全带安全帽乙方劳务所属人员11临水临电按规范规程要求进行配置、安装、拆除、维护、检查抽水机、电缆(线)、配电箱、遮雨棚罩提供主配电箱至施工现场100m范围内上述,除明示列举甲方提供的材料、机具、工作内容外,都属于乙方应按设计和规范要求完成的工作(工序)、提供的材料、机具。二、对劳务分包人的技术质量要求1、本工程质量要求:按施工时实施的国家相关规范、标准要求合格。2、乙方应接受甲方施工过程中的管理。甲方的管理人员在施工过程中发布的指令及建议乙方应遵照执行。3、乙方在施工中应执行自检、互检、交接检的规定,以保证工程质量的合格率。4、严格把好质量关,如因乙方施工原因造成工程质量不合格,乙方必须返工,返工费用自理。三、对劳务分包人的材料要求1、乙方对甲方提供的水泥、砂石、钢筋、砼等主材应妥善保管、合理使用,超用部想到这里,他立即带上两个测工,肩扛手拎着仪器,硬是徒步走到了现场。sectionoftheDepartmentofprojectmanagement;Projectdocumentsandinformation:ProjectEngineeringDepartment;Materialsandequipment:materialsupplyprojects;Securitycontrols:theprojectDepartmentofsafetyandsecurity;Constructionmachinery:ProjectEngineeringDepartment;Financial:ProjectManagementDepartmentoffinan
本文标题:顶管分包合同(1)范文
链接地址:https://www.777doc.com/doc-7382300 .html