您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 工程造价综合课程设计
铁道大学自学考试综合课程设计会议室工程预算书2011届继续教育学院专业工程造价管理号学生指导教师完成日期2013年6月19日目录第一部分······································································1第二部分造价书····················································2总说明···············································································2单项工程费用汇总表·······························································4单位工程费用汇总表·······························································5分部工程清单项目费用汇总表····················································6措施项目清单计价表·······························································9分部分项工程工程量清单分析表·················································10措施项目费用分析表······························································16主要材料标价表····································································17第三部分附录·························································19工程量计算书······································································19第四部分附图·························································24设计施工图·········································································24第二部分造价书总说明工程名称:某单位会议室1、工程概况:施工地点为某单位院,建设规模:51.56m2;砖混结构;其他须说明事项:①施工现场实际情况:施工用水源、电源已接至施工现场,施工道路利用原道路作硬化处理,施工区域的障碍物已拆除,施工场地较为平整,施工条件较好。;②交通运输情况:本工程位于沙坪坝区,交通便捷,运输工程材料可直接从城市主干道进入到施工现场的临时道路。;③自然地理条件:工程位于中心地形平坦④环境保护要求:由于是在城区施工,必须遵守各级政府的有关环境保护的规定,材料车辆的进场时间,施工占到问题及噪声控制、污水排放、封闭施工等方面必须遵照相关规定实施。;⑤其他未尽事宜:合同条款执行中华人民国建设部、国家工商行政管理局GF-2008-0201《建设工程施工合同(示文本)》。;2、清单编制依据:依据施工图纸及建设工程工程量清单计价规,《全国统筑工程基础定额-省消耗量定额》(HEBGYD-A-2008),材料价格编制结合目前市场价执行。3、工程招标围:土建、装饰工程由分包单位施工;4、对工程质量、材料、施工等的特殊要求:确保本工程质量;5、招标人自行采购材料明细:;6、其他需说明的问题:①本预算费按核定的土建四类工程标准计取各项费用②费用项目只考虑常见费用项目③劳动保险费已计入本预算。投标总价工程名称:会议室建筑装饰工程表一建设单位:某单位工程名称:单位会议室投标总价(小写):58066.26元(大写):伍万捌仟陆拾陆元贰角陆分投标人:××建筑公司(单位签字盖章)法定代表人:×××(签字盖章)编制时间:2012年9月27日单项工程汇总表工程名称:会议室建筑装饰工程表二序号单项工程名称金额(元)1建筑工程32067.792装饰装修工程25998.47合计(结转至工程项目总价表)58066.26单位工程费汇总表工程名称:会议室建筑装饰工程表三序号单位工程名称金额(元)一分部分项工程量清单计价合计36984.941建筑工程部分16745.301.1土石方工程2360.51.2砌筑工程7675.561.3混凝土及钢筋混凝土工程4822.991.4屋面及防水工程1886.252装饰装修工程部分20239.642.1楼地面工程5881.232.2墙、柱面工程3505.381.3天棚工程438.531.4门窗工程9289.861.5油漆、涂料、裱糊工程1187.64二措施项目清单计价合计4392.27三其他项目清单计价合计14338.8四规费工程排污费(1)×1%169.85定额管理费(1+2+3)×0.14%78五税金(1+2+3+4+5)×3.40%1902.4合计(转结至单项工程费汇总表)58066.26分部分项工程量清单计价表工程名称:接待室建筑工程表四序号项目编码项目名称计量单位工程数量金额(元)综合单价合价A.1土方工程11人工平整场地m251.562.34125.2921人工挖基础土方(墙基)m334.1830.481041.8132人工挖基础土方(柱基)m30.7755.8843.0341人工(墙基、柱基)基础回填土m316.7057.71963.7652人工室回填土m38.1123.01186.61A.3砌筑工程61M5水泥砂浆砌筑基础m315.08233.243517.2671M5混合砂浆砌砖墙m324.91165.574124.3581M5混合砂浆砌砖柱m30.19178.7133.95A.4混凝土及钢筋混凝土工程91现浇C20混凝土矩形梁m30.36226.9381.69101现浇C20混凝土圈梁m31.26251.72317.17111混凝土散水m222.6327.19615.31121预应力C30混凝土空心板m33.86617.452383.36131现浇构件钢筋t0.1724310.54741.41141先法预应力钢筋t0.1345104.87684.05本页小计14859.05A.7屋面及防水工程151屋面刚性防水m255.0855.083.79161砖基础防潮层m28.878.879.04本页小计1886.25合计16745.30工程名称:接待室装饰工程表五序号项目编码项目名称计量工程数金额(元)单位量综合单价合价B.1楼地面11块料地面面层m242.69109.374669.0121块料踢脚线m26.54122.19799.1231现浇水磨石台阶面m22.82146.49413.10B.2墙、柱面工程41混合砂浆抹墙面m2137.929.291281.2852外墙面水刷石m285.7923.722034.0461柱面水刷石m23.1727.2186.2671梁面水刷石m23.7527.44102.90B.3天棚工程81混合砂浆抹天棚m246.219.49438.53B.4门窗工程91实木装饰门樘4975.373901.48101塑钢窗C-1樘6709.614257.66111塑钢窗C-2樘1565.36565.36121塑钢窗C-2樘1565.36565.36B.5油漆、涂料工程132墙面、天棚面乳胶漆m2184.136.451187.64本页小计20239.64合计20239.64措施项目清单计价工程名称:建筑工程表六序号单位工程名称金额(元)1模板使用费3497.492脚手架使用费894.78合计4392.27分部分项工程量清单综合单价分析表工程名称:会议室建筑工程表七序号项目编码项目名称工程容综合单价组成综合单价人工费材料费机械使用费管理费利润小计11人工平整场地人工平整场地土壤类别:三类土0.990.100.091.182.36运土方弃土运距:5km0.250.730.100.081.1621人工挖基础土方︵墙基︶人工挖基础土方(墙基)土壤类别:三类土基础类型:带型标准砖放脚墙基础垫层底宽:800mm挖土深度:1.20m10.871.090.9612.9230.48运土方弃土运距:5km3.7910.991.481.3017.5632人工挖基础土方︵柱基︶人工挖基础土方(柱基)土壤类别:三类土基础类型:独立标准砖放脚柱基础垫层底宽:800mm底面积:0.64m2挖土深度:1.20m19.531.951.7223.2055.88运土方弃土运距:5km6.8620.652.752.4232.6841人工︵墙基柱基︶人工(墙基、柱基)基础回填土土质要求:含砾石粉质粘土密实度要求:密实粒径要求:10~40mm砾石夯填:分层夯填运输距离:5km9.4339.144.864.2857.7157.71基础回填土52人工室回填土人工室回填土土质要求:含砾石粉质黏土密实度要求:密实粒径要求:10~40mm砾石夯填;分层夯填运输距离;5km3.7715.601.941.7023.0123.0161M5混合砂浆砌砖墙M5水泥砂浆砌砖基础砖品种、规格、强度:MU10标砖基础类型;带型基础深度1.20m27.40103.330.6113.1311.56156.03233.24垫层及厚度;C20混凝土,200厚11.1152.701.186.505.7277.2171M5混合砂浆砌砖墙M5混合砂浆砌砖墙砖品种、规格、强度:MU7.5标砖墙体类型;实砌标准砖墙墙体厚度;240mm墙体高度;3.60m37.00102.310.0613.9412.26165.57165.5781M5混合砂浆砌砖柱M5混合砂浆砌砖柱砖品种、规格、强度:MU7.5标砖柱类型;标准砖柱柱截面:240mm×240mm柱高:3.30m45.27104.580.5815.0413.24178.71178.7191现浇C20混凝土矩现浇C20混凝土矩形梁梁底标高:3.30m梁截面240mm×300mm拌合料要求:中砂,5~20砾石39.44151.5819.1016.80226.93226.93形梁101现浇C20混凝土圈梁现浇C20混凝土圈梁梁底标高:2.40m梁截面;180mm×240mm拌合料要求:中砂,5~20砾石52.86154.244.7821.1918.65251.72251.72111混凝土散水混凝土散水垫层材料:素土夯实散水厚度:60mm混凝土强度等级:C10混凝土拌合料:中砂,5~20砾石3.609.800.351.381.2116.3427.19填塞材料:沥青砂浆2.326.820.910.8010.85121预应力C30混凝土空心板预应力C30混凝土空心板构件尺寸:3900mm×600mm混凝土拌合料:中砂,5~20砾石接头灌浆:C20细石混凝土55.03214.5515.4228.5025.08338.58617.45构件运距:8km15.609.9462.398.797,。74104.46安装高度:3.60m50.4144.1452.2614.6812.92174.41131现浇构件钢筋现浇构件钢筋钢筋种类、规格HPB235Φ1281.40801.515.6488.8678.191055.604310.54HPB235Φ6.5123.262146.8043.90231.40203.632748.99HRB235Φ1419.77359.486.6338.5933.96458.43钢筋运距:2km40.004.003.5247.52141先法预应力钢筋先法预应力钢筋钢筋种类、规格:CRB650Φ4358.213816.6471.42424.63373.675044.595104.87钢筋运距:2km50.755.0
本文标题:工程造价综合课程设计
链接地址:https://www.777doc.com/doc-7881823 .html