您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 质量控制/管理 > 钢结构的质量保证措施
requireblastingconstructionareaagainstadjacentbuilding,slopeaffected,settheinfluenceofblastingvibrationmonitoringdevice,andsetupspecialfull-timesecuritystaffobservedatanytimeandmakeobservations,areaatanytimetocheckonthejob.15.3.3temporarypowerandlightingcircuits(1)substations,powerdistributionroomsfortifiedThunder,earthleakageprotection,usezerosystem,butshallnotbeco-locatedonthesamepowersupplysystemgroundconnectionandzeroconnection;(2)theerectionoflightinglinessuspendedheightshallbeinaccordancewithlocalrequirementsintheelectricitysector;(3)constructionsitelightinglineshort-circuitprotection,fixedandjointloadsshallbeaccordingtotheregulationsofthelocalpowersector;(4)portablepowerequipment,cablesandothervehiclesrolledleakage-proof;(5)electricdrivewheel,wheel,flywheelsandotherexposedpartsofprotectivedevices.(6)constructionorganizationdesignoftemporaryelectricityinconstructionsiteshallbeprepared,noprivatelines.15.3.4safetyassurancemeasures(1)trafficshouldbesmooth,cleanandsmoothdrainagesystem.Slope,turningradius,thewronglanes,road...15.4.1organitzacióderespostad'emergènciaideures(1)Departamentdetreballrespostad'emergènciadeseguretatgruplíderd'undirectordeprojected'establirl'organització.Presideixeldirectordelprojecte,capadjuntprojectedirectoradjunt,directorsde钢结构的质量保证措施1.质控主要依据(1)钢结构设计图纸和施工说明书(2)《钢结构工程施工质量验收规范》(3)《建筑钢结构焊接规程》2.质量控制环节(1)脚螺栓预埋就位检查(2)构件进场外观检查(3)构件进场技术资料检查(4)第三方超声波探伤检查钢构件焊接(5)脚灌浆前的垂直度检查(6)脚灌浆后的垂直度检查(7)结构安装焊接后的测量检查(8)焊接质量检查(9)现场焊接超声波质量检查3.质量控制重点(1)构件加工的质量控制(2)构件安装前对构件的质量检查(3)现场安装质量控制(4)测量的质量控制(5)焊接过程及质量控制4.质量控制措施(1)施工准备过程的质量控制优化施工方案和合理安排施工程序,做好每道工序的质量标准和施工技术交底工作,搞好图纸审查和技术培训工作。严格控制进场原材的质量,对钢材等物资除必须有出厂合格证外,需经试验复检并出具复检合格证明文件,严禁不合格材料用于本工程。合理配备施工机械,搞好维修保养工作,使机械处于良好的工作状态。对产品质量实现优质低价,使工程质量与员工的经济利益密切相关。采用质量预控法,把质量管理的事后检查转变为事前控制工序及因素,达到“预控为主”的目标,如焊缝检查等。(2)施工过程中的质量保证措施根据本工程钢结构施工难度大、质量要求高,必须加强质量管理的领导工作,严格执行规范、标准,按设计要求进行控制施工,把施工质量放在首位,精心管理,精心施工,保证质量目标的实现。检查由项目经理直接负责,总工中间控制,专职检验员作业检查、班组质量监督员自检、互检的质量保证组织系统,将每个岗位、每个职工的质量职责都纳入项目承包的岗位责任合同中,并制定严格的奖罚标准,使施工过程的每一道工序,每个部位都处于requireblastingconstructionareaagainstadjacentbuilding,slopeaffected,settheinfluenceofblastingvibrationmonitoringdevice,andsetupspecialfull-timesecuritystaffobservedatanytimeandmakeobservations,areaatanytimetocheckonthejob.15.3.3temporarypowerandlightingcircuits(1)substations,powerdistributionroomsfortifiedThunder,earthleakageprotection,usezerosystem,butshallnotbeco-locatedonthesamepowersupplysystemgroundconnectionandzeroconnection;(2)theerectionoflightinglinessuspendedheightshallbeinaccordancewithlocalrequirementsintheelectricitysector;(3)constructionsitelightinglineshort-circuitprotection,fixedandjointloadsshallbeaccordingtotheregulationsofthelocalpowersector;(4)portablepowerequipment,cablesandothervehiclesrolledleakage-proof;(5)electricdrivewheel,wheel,flywheelsandotherexposedpartsofprotectivedevices.(6)constructionorganizationdesignoftemporaryelectricityinconstructionsiteshallbeprepared,noprivatelines.15.3.4safetyassurancemeasures(1)trafficshouldbesmooth,cleanandsmoothdrainagesystem.Slope,turningradius,thewronglanes,road...15.4.1organitzacióderespostad'emergènciaideures(1)Departamentdetreballrespostad'emergènciadeseguretatgruplíderd'undirectordeprojected'establirl'organització.Presideixeldirectordelprojecte,capadjuntprojectedirectoradjunt,directorsde受控状态,并同经济效益挂钩,保证工程的整体质量水平。制定项目各级管理人员,施工人员质量责任制,落实责任,明确职责,签订质量责任合同,把每道工序、每个部位的质量要求、标准、控制目标,分解到各个管理人员和操作人员。根据工序要求,制定项目质量管理奖罚条例,岗位职责、质量目标与工资奖金挂钩,实行质量一票否决权。根据公司钢结构施工的关键工序作业指导书,严格按作业指导书进行交底和施工操作,做到施工有序控制和监控检查。施工现场的检查机构,由项目经理和项目总工牵头建立质量检查机构,是保障工程质量的重要环节。根据工种不同设专职检查员,人员责任实行到位,分批把关贯彻工程全过程,通过检查机构职能运行,把技术要求、质量要求传达到班组质检员,逐级负责控制各专业技术岗位和质量目标,通过每一系统的质量把关。5.质量保证的具体措施(1)本工程安装应按施工组织设计进行,安装程序必须保证结构稳定性和不导致永久性变形。(2)本工程构件存放场地应平整坚实,无积水,应按种类、型号、安装顺序分区存放,底层垫枕应有足够的支承面,并应防止支点下沉,相同型号的叠放时,各层的支点应在同一垂直线上,并应防止钢构件被压坏和变形。(3)安装前,应按构件明细表和进场构件查验产品合格证设计文件。应根据安装顺序,分单元成套供应。贯彻原材料,半成品和成品检验制度,施工员应会同质量检查对半成品和成品进行复检,加强成品和半成品的质量监督工作。(4)钢构件安装的测量和校正,应根据工程特点编制相应的工艺,原钢板和异种钢板的焊接、高强度螺栓安装和负温度下施工等工艺,应在安装前进行工艺试验,编制相应的施工工艺。(5)本工程的柱、梁等主要构件安装就位后,应立即进行校正、固定,当天安装的构件应形成移定的空间体系。(6)本工程顶紧的节点、接触面应和70%的面紧贴,用0.3mm厚塞尺检查,可插入的面积之和不得大于接触顶紧总面积的30%,边缘最大间不应大于0.8mm。(7)钢结构安装偏差的检测,应在结构形成空间刚度单元并连接固定后进行。(8)加强测量工作本工程采用经纬仪、水准仪、全站仪等应加强器校核,随时保证使用精度。(9)安装标高和位移的控制加强加工厂质检工作,严格控制外形尺寸、节点板位置、孔距标准规格型号数量和焊缝的外观等。凡是不合格者,要求返修。钢柱安装时初校、用高强螺栓连接、校正、固定→安装钢梁时观测→拧紧连接定位螺栓并检校复核→替换成高强螺栓→按图纸要求焊接上下翼缘→焊接腹板→测量复核。钢柱吊完后,必须及时安装钢梁,并紧接着校正,焊接固定,以便形成稳定结构。(10)加强焊接工作,焊接开始,要求以保证质量为准,保证合格率,在合格的基础上再要求进度。根据设计图纸要求各种焊缝质量要求按照《建筑钢结构焊接规程》;《钢结构工程施工质量验收规范》的有关质量标准执行。(11)措施及要求按总说明要求进行焊工培训,合格后方可进行工作。严格执行焊接工艺评定。requireblastingconstructionareaagainstadjacentbuilding,slopeaffected,settheinfluenceofblastingvibrationmonitoringdevice,andsetupspecialfull-timesecuritystaffobservedatanytimeandmakeobservations,areaatanytimetocheckonthejob.15.3.3temporarypowerandlightingcircuits(1)substations,powerdistributionroomsfortifiedThunder,earthleakageprotection,usezerosystem,butshallnotbeco-locatedonthesamepowersupplysystemgroundconnectionandzeroconnection;(2)theerectionoflightinglinessuspendedheightshallbeinaccordancewithlocalrequirementsintheelectri
本文标题:钢结构的质量保证措施
链接地址:https://www.777doc.com/doc-1283003 .html