您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 大兴线施工组织设计(初稿)
目录第一章工程概述......................................................................41.1概述........................................................................................41.2设计概况................................................................................41.3路面结构................................................................................41.4地段、气象、水文...............................................................5第二章总体施工方案................................................................52.1施工组织机构........................................................................52.2施工队伍安排........................................................................82.3临时工程安排........................................................................9第三章设备、人员安排............................................................93.1设备、人员进场方案............................................................93.2材料进场方案........................................................................93.3主要施工机械设备..............................................................10第四章各分项工程的施工顺序及工期安排........................154.1各分项工程的施工顺序......................................................154.2分项工程工期安排..............................................................16第五章主要工程项目的施工方案及施工方法......................175.1原路面处理..........................................................................175.2砂砾垫层找平层施工..........................................................195.3厂拌水泥稳定沙砾上基层..................................................225.4封层、粘层的施工..............................................................28盘锦市赵圈河生态旅游路(大兴线)工程盘锦市市政工程建设总公司25.5面层.......................................................................................315.6培土路肩...............................................................................505.7附属工程...............................................................................51第六章确保工程质量和工期的措施....................................626.1确保质量的措施..................................................................626.2保证工期的主要措施..........................................................65第七章冬季和雨季的施工安排..............................................677.1冬季施工安排......................................................................677.2雨季施工安排......................................................................67第八章质量保证体系..............................................................678.1.设置质量检查组织配备专职质检员................................678.2质量自检保证体系..............................................................688.3建立各级质量责任制..........................................................688.4质量检测标准......................................................................708.5质量管理保证措施.............................................................708.6试验检测仪器和设备..........................................................71第九章健康、安全、环保(HSE)体系.............................749.1安全保障组织机构与人员配置..........................................749.2安全保障程序......................................................................749.3施工安全防护措施.............................................................759.4临时用电安全防护措施.....................................................769.5消防安全防护措施..............................................................77盘锦市赵圈河生态旅游路(大兴线)工程盘锦市市政工程建设总公司39.6环境保护...............................................................................78盘锦市赵圈河生态旅游路(大兴线)工程盘锦市市政工程建设总公司4第一章工程概述1.1概述盘锦市赵圈河生态旅游路(大兴线)工程路线起于省道S308线与乡道大赵线交叉处,利用大赵线向西前行,在K4+600处路线折向西南进入赵圈河乡,于K5+628处与县道新荣线丁字交叉,左转后利用县道新荣线向南走行,于K12+100处路线离开新荣线,折向乡道赵兴线,沿赵兴线向西行进2.8公里,于K14+819.759处达到红海滩旅游景区大门,即一级路终点,本段路线全长14.818公里。自K14.818—K22.163为二级路。1.2设计概况盘锦市赵圈河生态旅游路(大兴线)工程路线改扩建后加宽至21.5m。本次设计中对原路面宽度范围内路面进行补强处理,加宽部分为新建路面。为保证路面整体强度,加宽补强段的旧沥青面层挖除,并挖除旧路两侧宽0.2m、厚度0.2m的旧路面,新旧路接缝处铺设宽度1m玻璃纤维格栅。1.3路面结构1.3.1主线新建路面结构如下:上面层:3cm细粒式改性沥青混凝土(AC-10);下面层:中粒式沥青混凝土(AC-16);上基层:20cm厂拌水泥稳定沙砾;下基层:20cm厂拌水泥稳定沙砾;底基层:20cm天然沙砾;盘锦市赵圈河生态旅游路(大兴线)工程盘锦市市政工程建设总公司5总厚度为67cm,满足抗冻要求。1.3.2旧路利用补强段的处理:上面层:3cm细粒式改性沥青混凝土(AC-10);下面层:中粒式沥青混凝土(AC-16);基层:20cm厂拌水泥稳定沙砾;底基层:原旧路面;1.4地段、气象、水文本项目位于盘锦市大洼县境内,项目所在地位于辽河冲积平原的最南端,沿线地面平坦,多水无山。地表覆盖以水田、芦苇为主。大地构造单元属华北陆台东北部从“燕山运动”开始形成的新生代沉积盆地,经过漫长历史年代的河流冲积、洪积、海积和风积作用,不断覆盖着深厚的四系松散沉积物。本项目所处区域地下水系类型主要为孔隙水,赋存于沙砾层中,接受地表水和大气降水的补给。地下径流以蒸发排泄为主,年水位变幅较小。地下水对混凝土无腐蚀性。项目所在区域属温暖带大陆性半湿润季风气候区。其特点是:四季分明、雨热同季、干冷同期、温度适宜、光照充裕。年平均气温8.6℃,无霜期170天,年平均降雨量627mm,年日照时间在2700小时以上,最大冻土深度1.11m。第二章总体施工方案2.1施工组织机构为了确保工程质量和进度达到业主的要求,维护公司在市场竞争中的地位,本工程按项目法组织施工,把经营的观念和施工管理的基盘锦市赵圈河生态旅游路(大兴线)工程盘锦市市政工程建设总公司6点落到项目上,确保管理和技术紧紧围绕施工生产的要素合理运转,充分发挥技术进步和质量监督作用,加强过程控制,提高工程质量和工作效率的目的,为此,我公司决定成立盘锦市赵圈河生态旅游路(大兴线)工程第二标段段项目经理部,它是承包商与业主联系的办事机构与工程项目的管理机构,项目经理部下设工程技术部、生产管理部、质量监督部、综合部、经营部,2.1.1项目组织机构设置:项目经理:负责项目全面施工管理、全面质量管理,对工程质量、工期负责;项目总工程师:领导技术部、质检部、试验室,负责制订施工组织设计、质量保证体系、施工方案,进行施工过程质量控制、工程技术交底,进行各种配合比设计。盘锦市赵圈河生态旅游路(大兴线)工程盘锦市市政工程建设总公司7项目组织机构图项目经理:张大斌项目副经理:柳邵亮总工程师:李良庸技术部质检部经营部生产部综合部稳定土拌合站沥青砼拌合站基层施工一队基层施工二队面层施工一队面层施工二队桥涵工程队2.1.2各部门人员安排及职责:2.1.2.1技术部:职责:贯彻执行技术规范与操作规程,进行新技术推广与应用,协助质检部进行过程控制,进行技术交底、设计变更和指导现场施工,负责现场平面位置及高程等的控制工作,并收集汇总各类原始记录。2.1.2.2质检部:职责:全面检查施工质量、监督指导施工,做好工程质量的预防、控制工作,对各分项工程各项指标进行检查。对不符合要求的工程提出整改方案,材
本文标题:大兴线施工组织设计(初稿)
链接地址:https://www.777doc.com/doc-177923 .html