公路工程建设项目交工检测方案工程名称:佛山市禅西大道南延线近期方案工程施工委托单位:江西中煤建设集团有限公司工程地点:佛山市顺德区乐从镇总页数(不含封面):共10页佛山市顺德区建设工程质量安全监督检测中心二○一四年九月二日第1页共10页目录一、工程概况······················································································2二、检测依据······················································································2三、检测方案······················································································3四、主要仪器设备················································································4五、拟投入的主要人员··········································································5六、协调和组织人员·············································································5七、进度安排及其他·············································································6(一)综合安排·············································································6(二)项目实施期间应急预案···························································6(三)文明检测承诺·······································································6(四)项目保密和保护所有权程序·····················································6(五)废弃物管理措施····································································7佛山市禅西大道南延线近期方案工程施工工程交工检测方案第2页共10页一、工程概况本项目位于顺德西北部的乐从镇,是对现状樵乐路进行拓建辅道,考虑到充分利用现状旧路及避免拆迁,平面线形与现状樵乐路主线保持一致,不再另开通道,路线总体呈南北走向,起点与正在建设的禅西大道二期工程终点衔接,与樵乐路相交后向东延伸与环镇西路相交后,路线转向南延伸,利用现状环镇西路,终点与佛山一环南线相交,路线全长4.57km。采用一级公路兼顾城市道路功能,双向六车道,设计速度80km/h;辅道参照城市次干路标准进行设计,双向四车道,设计速度40km/h;现状环镇西路呈南北走向,连接鹭杏线与佛山一环南线,环镇西路为已建城市主干路,设计速度为60km/h,双向六车道,路面为沥青混凝土路面,建成时间约1年,路况基本良好,本次施工直接利用现状环镇西路,并维持现状城市主干路标准,仅对其局部进行改造。本次改造主要针对樵乐路辅道、樵乐路与环镇西路交叉口、佛山一环与环镇西路交叉口进行整治。共有大桥1座,中小桥2座,人行天桥1座。樵乐路主路起止里程为K21+930.656~K23+261.899,桩号方向为东往西,乐从往西樵方向,与本项目辅道桩号方向相反。左幅道起点里程为LK0+000(=主路K23+056.979),终点里程为LK1+132.184(=主路K21+930.656);右幅道起点里程为RK0+000(=主路K23+056.979),终点里程为RK1+120.478(=主路K21+930.656)。标准横断面设计如下:5.5m(人行道)+8m(辅道)+4m(边分隔带)+25m(主路)+4m(边分隔带)+8m(辅道)+5.5m(人行道)=60m。设计技术指标:公路等级:城市次干道(Ⅰ级)行车速度:40km/h路面设计标准轴载:BZZ-100桥梁设计荷载:公路Ⅰ级二、检测依据本次检测工作依据或参照以下规范和资料进行:1、《公路路基路面现场测试规程》JTGE60-20082、《公路工程质量检验评定标准》JTGF80/1-20043、公路工程竣(交)工验收办法实施细则4、《公路桥梁承载能力检测评定规程》JTG/TJ21-20115、《回弹法检测混凝土抗压强度技术规程》JGJ/T23-20116、《混凝土中钢筋检测技术规程》JGT152-20087、佛山市交通基础设施建设项目强制性检测工作指南8、其他相关试验检测规程9、本项目相关设计资料及文件佛山市禅西大道南延线近期方案工程施工工程交工检测方案第3页共10页三、检测方案根据《公路工程竣(交)工验收办法实施细则》(交公路发[2010]65号)和《公路工程质量检验评定标准》(JTGF80/1-2004)以及佛山市交通基础设施建设项目强制性检测工作指南,公路工程质量鉴定工作包括工程实体检测、外观检查和内业资料审查。本方案仅针对工程实体检测中的相关内容和要求而编制。(1)抽查项目、频率根据《公路工程竣(交)工验收办法实施细则》(交公路发[2010]65号)以及佛山市交通基础设施建设项目强制性检测工作指南、《公路工程质量检验评定标准》(JTGF80/1-2004)和委托方要求:本工程公路等级为城市次干道(Ⅰ级),桥梁设计荷载为公路Ⅰ级,故检测项目及频率按文件中高速、一级公路进行。具体抽检项目及频率详见附件一:佛山市禅西大道南延线近期方案工程施工交工检测项目、数量及费用一览表。(2)检测方法检测方法主要参考《公路工程质量检验评定标准》(JTGF80/1-2004)、《公路路基路面现场测试规程》(JTGE60-2008)和《公路桥梁承载能力检测评定规程》JTG/TJ21-2011进行,详见表1。交工检测方法一览表表1检测项目检测方法检测对象主要仪器设备备注压实度灌砂法路基、基层灌砂仪、电子称钻芯法沥青砼路面混凝土钻孔取芯机平整度3m直尺法沥青砼路面公路工程检测尺(3m直尺)、楔形塞尺抗滑(构造深度)手工铺砂法沥青砼路面人工铺砂仪、钢直尺厚度钻芯法沥青砼路面(总厚度)混凝土钻孔取芯机横坡水准法沥青砼路面水准仪、钢卷尺宽度钢尺法沥青砼路面钢卷尺弯沉贝克曼梁法沥青砼路面公路工程路面回弹弯沉值测定仪渗水系数路面渗水系数测试法沥青砼路面沥青路面渗水试验仪混凝土强度回弹法上/下部结构回弹仪结构尺寸尺量上/下部结构钢卷尺钢筋保护层厚度电磁感应法上/下部结构钢筋扫描仪佛山市禅西大道南延线近期方案工程施工工程交工检测方案第4页共10页检测项目检测方法检测对象主要仪器设备备注墩台垂直度垂线法或全站仪法墩台钢卷尺、全站仪伸缩缝和桥面高差尺量或水准仪法伸缩缝/桥面水准仪、塞尺单梁静载试验静力荷载法预制梁水准仪、百分表、静态应变采集仪成桥静载试验静力荷载法成桥水准仪、百分表、静态应变采集仪成桥动载试验动力荷载法成桥振动传感器、动态信号采集仪成桥外观检查目测、检查全桥钢卷尺、裂缝测量仪(3)单梁及成桥荷载试验根据《大跨径混凝土桥梁的试验方法》以及《公路桥梁承载能力检测评定规程》(2011)等规程、规范为指导,进行桥梁静动载试验,以验证其承载能力是否满足设计要求,检测对象、内容和项目根据后期确定的实际桥跨,具体试验方案另行编制。四、主要仪器设备本次检验使用的仪器设备清单详见表2。拟投入本工程的检测设备清单表2仪器设备名称型号规格数量精度混凝土钻孔取芯机HZ-201--秒表DM1-001电子秒表10.1s公路工程检测尺3m1--楔形塞尺15mm10.1mm人工铺砂仪25mL±0.15mL1--钢直尺300mm11mm钢卷尺30m11mm水准仪SDL30M10.001mm条码铟钢标尺2m10.01mm温度计数字式11℃公路工程路面回弹弯沉值测定仪5.4m2/沥青路面渗水试验仪600mL12mL电子水准仪DINI0.310.01mm条码尺2m10.01mm百分表FS5cm100.01mm静态应变采集仪DT85G1/静态应变计GK4000301με动态信号采集分析仪INV306A1/佛山市禅西大道南延线近期方案工程施工工程交工检测方案第5页共10页仪器设备名称型号规格数量精度振动传感器891-216/应变采集仪DH3816N1/电阻式应变计120Ω1001με回弹仪ZCW-A5/钢筋扫描仪Profometer31mm全站仪DTM-53010.5″五、拟投入的主要人员本次检测拟参与检测人员详见表3。本项目拟参与检测人员一览表表3序号姓名职称持证情况本次检测岗位/分工1邓来富高级工程师检测工程师项目负责人2郑建民高级工程师检测工程师技术支持3梁金辉高级工程师检测工程师项目组织协调4卢嘉明工程师检测工程师现场检测负责5刘颖波工程师检测工程师室内检验负责6李猛高级工程师检测工程师桥梁检测负责7郑凯工程师检测工程师检测人员8张建文助理工程师检测员检测人员9邓红军/检测员检测人员六、协调和组织人员为顺利完成本工程的交工检测工作,特成立联络小组协调相关工作,详见表4:交工检测联络小组通讯录表4序号职务姓名联系电话备注1检测中心副主任郑建民22383216技术负责人2交通检测部部长邓来富22383198项目负责人3交通检测副部长梁金辉22383210项目组织4交通检测部组长张建锋22383340项目协调佛山市禅西大道南延线近期方案工程施工工程交工检测方案第6页共10页七、进度安排及其他本次检测采取平行作业的方式进行,根据工程实时进度,对时间采取动态调整。(一)综合安排(1)检测项目现场负责人负责综合协调与其他相关单位的工作联系,并建立定期联系制度;(2)工地实行综合治理责任制,落实分工责任,搞好综合治理工作;(3)安排专人在检测现场维持秩序,闲杂人员禁止进入试验现场。(二)项目实施期间应急预案检测过程中除保障交通畅通之外,还应对紧急事故第一时间做出反应,尽量避免事故发生。各项目都由专人作为安全员负责安全问题,保证工作过程的安全。如现场发生交通事故引起交通堵塞时,由专人第一时间电话上报检测维护现场负责人,协助现场和拯救工作并维持现场交通秩序。所有现场检测维护人员配备在作业期间均打开通讯设备,第一时间汇报现场情况,保证检测维护工作顺利进行,最终完成本次检测维护工作。若出现相应车辆事故,作如及时处理。(三)文明检测承诺(1)保证不发生任何投诉问题;(2)文明检测中发现的问题,保证立即予以整改;(3)保证文明检测管理措施落实,责任到人,有奖有罚;(4)检测工作完成后,在交通开放前拆除现场围栏(绳)、安全防护设施和其他临时设施,并将现场及周围环境清理整洁,做到工完料净场清;(5)无条件接受业主有关文明检测的监督;(6)依法检测,办理有关手续后进行检测。(四)项目保密和保护所有权程序(1)非我中心从事试验检测工作的人员,不让其介入试验检测工作。(2)试验检测人员保证数据的真实性,使之不受其它因素的影响。(3)严格为受检单位的技术资料保密,切实维护委托人的权益。佛山市禅西大道南延线近期方案工程施工工程交工检测方案第7页共10页(五)废弃物管理措施(1)检测现场设立专门的废弃物临时贮存场地,废弃物应分类存放,对有可能造成二次污染的废弃物必须单独贮存,设置安全防范措施且有醒目标识。(2)废弃物的运输确保不散撒、不混放,送到政府批准的单位或场所进行处理、消纳,对可回收的废弃物做到再回收利用。2019年09月02日佛山市禅西大道南延线近期方案工程施工工程交工检测方案第
本文标题:禅西大道工程交工检测方案
链接地址:https://www.777doc.com/doc-2231576 .html