您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 合川华地人工挖孔桩专项方案
目录一.编制说明及依据····························································································1二.工程概况········································································································1三.施工目标········································································································3四.施工部署及资源计划····················································································4五.人工挖孔桩基础施工···················································································11六.人工挖孔桩特殊地质情况下的施工及其处理措施···································17七.保证质量的技术措施···················································································20八.保证安全的措施····························································································22九.事故应急措施·······························································································28十.季节性施工技术措施···················································································33十一.保证工期的措施························································································34十二.保证文明施工、环境、职业健康安全的技术措施·······························35合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-1-一.编制依据及说明1.编制依据1.1合川华地·领域住宅小区工程设计图纸及图纸会审记录。1.2中煤国际工程集团重庆设计研究院提供的《合川“华地·领域商住项目”工程地质勘察报告》1.3国家、行业及地方有关政策、法律、法令、法规。1.4国家强制性技术质量标准、施工验收规范、规程(具体详后面第四节的2.1条)。1.5现行工艺标准及操作规程。1.6本公司质量、环境和职业健康安全一体化管理体系及管理规章制度。2.编制说明人工挖孔灌注桩的机械化程度要求不高,仅靠简单的机具就能实现,一方面可保证清底干净,另一方面在成孔过程中采用现浇混凝土护壁,呈锯齿型的护壁提高了桩侧摩阻力,保证了成桩质量。此外,还有单桩承载力高,桩受力明确,计算简单,基础成本低廉,桩身质量可靠,基础施工简便,噪音小和基础沉降小等优点,故得到广泛的应用,但在施工过程中,由于地质情况复杂,给施工带来较大的安全隐患和影响桩的成型质量,故为了顺利的完成桩基施工,编写此专项方案。二.工程概况1.工程简介工程名称:合川华地·领域住宅小区工程建设单位:重庆华川置业有限公司设计单位:重庆市设计院监理单位:重庆建新建设工程监理咨询有限公司合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-2-施工单位:重庆建工住宅建设有限公司2.工程概况本工程位于合川区政府北面,中南路和下南路间。该工程建筑面积:63927.23m2,总高:107.70m,结构形式:框剪结构。±0.000设计标高相对绝对高程212.600m。负一层为地下车库,层高5.7m。地下车库周边为钢筋砼挡墙结构,挡墙砼为C30,抗渗等级S6,墙厚为300mm。一、二层为裙房,主要使用功能为商业门面,层高5.1m。裙房上有A、B、C、D四栋塔楼。A、B、C三栋住宅各31层,层高3.0m;D栋员工宿舍六层,层高主要为3.7m;3.地层岩性(根据地勘报告提供):3.1土层(1)素(杂)填土(Q4ml):稍湿,结构松散,主要由粉质粘土夹卵石组成,其中杂填土含建筑垃圾,且块石最大粒径可达90cm,回填时间小于1年。钻探揭露厚度0~15.8m,层底高程194.05~208.91m。(2)粉质粘土(Q4al+pl):含砂量不均,随深度增加含砂量增加,上部颗粒较粗,下部颗粒较细。钻探揭露厚度0~15.0m,层底高程193.69~200.97m。(3)粉土(Q4al+pl):颗粒较细,含少量细砂。钻探揭露厚度0~5.6m,层底高程192.17~196.73m。(4)砂卵石(Q4al+pl):饱水,稍密~中密,磨圆较好,多呈扁圆状,具一定分选性。粒径一般1-18cm,含少量漂石。该层在场地内均有分布,钻探揭露厚度3.1~11.1m,层底高程186.95~190.73m。3.2基岩(J2s):砂质泥岩(J2s):紫红色,泥质结构,中厚层状构造,主要由粘土矿物组成,局部砂质含量较重。整个场地均有分布。泥质砂岩(J2s):红褐色,中细粒结构,中厚层状构造,主要由长石、石英矿物组成,泥质胶结。场地内呈透镜体、夹层状分布。4水文地质条件(根据地勘报告提供)拟建场地上覆人工填土、粉质粘土层、粉土层、砂卵石,人工填土为透水层,粉质粘土为相对隔水层,粉土及砂卵石属透含水层、渗透性较好。下伏基岩为砂质泥岩、泥质砂合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-3-岩,为相对隔水层,渗透性较差。受嘉陵江护堤影响,场地内冲沟水流不能直接向嘉陵江排放,而是主要通过市政污水管网进行排放,少部分沿松散土体间孔隙入渗,在粉土及砂卵石层中形成松散孔隙水,从南向北向嘉陵江排泄。经观察,降雨期间因水量增加,冲沟水流排泄不畅,沟内水位上升较快。场区地下水与嘉陵江互为补给关系,嘉陵江水位高于场区地下水位时(如洪水期或蓄水期),也就是嘉陵江水位高于场区主要含水层高程时,嘉陵江主要补给场区地下水,此时场区地下水丰富。在嘉陵江水位较低时,场区地下水主要补给嘉陵江,此时场区地下水相对较贫乏。场地内未见地表水分布,在场地外北侧分布有嘉陵江,据有关资料,两江常年洪水位204.17m(合川专用站)。勘察过程中在终孔后抽干地下水,24小时后进行钻孔水位观测,水位高程192.2~197.3m。5.工程基础概况:基础形式:本工程设计为人工挖孔灌注桩、地梁及承台基础。人工挖孔灌注桩、地梁及承台基础在地下室部分顶标高为206.3m,其余部分为212m。人工挖孔桩共440根,桩断面为直径900mm、1000mm、1100mm的三种圆桩及其断面带平直段的桩(以下称椭圆桩)。人工挖孔灌注桩全部嵌固于中风化岩层内,嵌岩深度900~3400(未含桩的锅底尺寸),桩以中风化岩石层作为持力层,桩端地基极限承载力特征值≥2.5MPa。桩护壁厚度为:挖方区每节护壁上口厚度为150mm,护壁下口厚度为100mm;填方区每节护壁上口厚度为200mm,护壁下口厚度为150mm。电梯井等核心筒部位筏板设计为:1500厚C30砼,内配25@150双层双向钢筋。基础材料:a、混凝土强度等级护壁C20;桩身、承台、DLx、筏基和底板:C30;JLx:C50;垫层:C20。b、基础钢筋采用HPB235级、HPB335和HRB400级钢筋。C、护壁水平、竖向钢筋设计均为Φ8@150。d、桩钢筋笼:主筋有14、16两种,螺旋箍有Φ8、Φ10两种,螺旋箍非加密区为@200,螺旋箍加密区为@100,加劲箍为14@2000。合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-4-三、施工目标1.质量目标我们将精心组织施工,确定工程质量按国家验收标准GB50300-2001《建筑工程施工质量验收统一标准》和相关专业验收规范进行验收,工程质量等级达到一次性验收合格。2.工期目标结合现场场地狭窄等实际情况,对人工挖孔桩成孔主要按两批次进行。第一批桩控制在60天内完工,开工后立即插入;第二批桩控制在60天内完工,主体结构封顶后立即插入。3.安全文明施工目标安全文明施工是加快工程进度,提高工程质量起主要作用,同时也是展示公司形象体现项目综合管理水平的重要工作之一。根据国家、市有关安全、文明施工标准要求,层层落实责任,分片包干,争创市级安全文明施工标化工地。4.环保目标环境保护已成为目前人类关注的重要话题,我们在施工过程中尽量不夜间施工,减小噪声,污水有组织排放,固体垃圾运送至垃圾处理场处理,控制扬尘污染,达到国家、市有关环境保护要求。四、施工部署及资源计划1.项目部施工管理网络合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-5-项目经理:喻宗洪技术负责人:刘章亮施工负责人:龙永涛预算、内业3人技术管理文件管理档案管理预决算质量员2人质量监督检查验收试件员1人原材料试验、试件制作送检及结构试验材料员1人材料供应验收管理平面管理设备员1人设备使用维护保养水电维护安全员2人安全监督安全检查安全验收文明施工施工员4人组织施工生产计划控制进度质量安全定位放线轴线控制第八项目部经理:刘强合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-6-2.技术准备2.1本工程执行技术标准及施工验收规范本工程执行技术标准及施工验收规范详下表:序号标准编号标准名称1GB50026-93《工程测量规范》2GB50202—2002《建筑地基基础工程施工质量验收规范》3JGJ79—91《建筑地基处理技术规范》4GBJ107—87《混凝土强度评定标准》5GB50194—93《建设工程施工现场供用电安全规范》6GB50203—2002《砌体工程施工质量验收规范》7GB50204—2002《混凝土结构工程施工质量验收规范》8JGJ18—2003《钢筋焊接及验收规范》9GB50164—92《混凝土质量控制标准》10GBJ119—95《混凝土外加剂应用技术规范》11JGJ63—89《混凝土拌合用水标准》12JGJ/T93—95《基桩底应变动力检测规程》13JGJ33—2005《建筑机械使用安全技术规程》14JGJ59—99〈建筑施工安全检查标准〉15GB50300—2001《建筑工程施工质量验收统一标准》16JGJ46—2005《施工现场临时用电安全技术规程》17JGJ52—92《普通混凝土用砂质量标准及检验方法》18JGJ53—92《普通混凝土用碎石或卵石质量标准及检验方法》19GB8076—1997《混凝土外加剂》合川华地·领域住宅小区工程人工挖孔桩施工方案重庆建工住宅建设有限公司-7-20GB50208—2002《地下防水工程质量验收规范》21JGJ94—2008《建筑桩基技术规范》22JGJ/T10—95《混凝土泵送技术规程》2.2将施工图发给有关工种负责人,组织施工技术人员熟悉和阅读施工图纸,进行图纸自审、会审,作好施工技术交底工作。2.3把工程所用的测量仪器,计量器具,资料表格和材料试验结果等送业主及监理单位审定和认可。施工仪器及通讯设备明细表序号仪器名称单位数量用途及说明1全站仪台1施工定位放线2水平仪台2标高定位用3计算机台4施工管理用4打印机台1打印各种文件资料5市内电话部1工作联系6照相机部1收集图片资料7摄像机部1收集影像资料8无线对讲机对3塔吊指挥用9铝合金塔尺(5m)把2施
本文标题:合川华地人工挖孔桩专项方案
链接地址:https://www.777doc.com/doc-2620341 .html