您好,欢迎访问三七文档
当前位置:首页 > 机械/制造/汽车 > 机械/模具设计 > 【模具与数控专业英语】教学内容2104
UnitTwoDieDesign模具与数控专业英语2.4BlankingDie模具与数控专业英语2.4.1ShearingActioninDieCuttingOperationsBeforeasheet-metalpartismade,ablankofsuitabledimensionsisfirstremovedfromalargesheetbyshearing,thatis,thesheetiscutbysubjectingittoshearstresses,typicallyoncedevelopedbetweenapunchandadie.InthefollowingFigure2-5presentsthecutting(shearing)operations.InFigure2-5,(a)Schematicillustrationofshearingwithapunchanddie,indicatingsomeoftheprocessvariables.(b),(c)Characteristicfeaturesofapunchedholeandtheslug.Notethatthescalesofthetwofiguresaredifferent.模具与数控专业英语(a)模具与数控专业英语(b)模具与数控专业英语(c)Figure2-5Schematicillustrationofshearingwithapunchanddie模具与数控专业英语Thecuttingofmetalbetweendiecomponentsisashearingprocessinwhichthemetalisstressedinshearbetweentwocuttingedgestothepointoffracture,orbeyonditsultimatestrength.Themetalissubjectedtobothtensileandcompressivestresses,stretchingbeyondtheelasticlimitoccurs,thenplasticdeformation,reductioninarea,andfinally,fracturingstarsthroughcleavageplanesinthereducedareaandbecomescomplete.模具与数控专业英语ThefundamentalstepsinshearingorcuttingareshowninFigure2-6.Thepressureappliedbythepunchonthemetaltendstodeformitintothedieopening.Whentheelasticlimitisexceededbyfurtherloading,aportionofthemetalwillbeforcedintothedieopeningintheformofanembossedpadonthelowerfaceofthematerial.Acorrespondingdepressionresultsontheupperface,asindicatedatFigure2-6a.Astheloadisfurtherincreased,thepunchwillpenetratethemetaltoacertaindepthandforceanequalportionofmetalthicknessintothedie,asindicatedatFigure2-6b.模具与数控专业英语Thispenetrationoccursbeforefracturingstartsandreducesthecross-sectionalareaofmetalthroughwhichthecutisbeingmade.Fracturingwillstartinthereducedareaatbothupperandlowercuttingedges,asindicatedatFigure2-6c,d.Iftheclearanceissuitableforthematerialbeingcut,thesefractureswillspreadtowardeachotherandeventuallymeet,causingcompleteseparation[2].Furthertravelofthepunchwillcarrythecutportionthroughthestockandintothedieopening.模具与数控专业英语Figure2-6Stepinshearingmetal模具与数控专业英语2.4.2CenterofPressureIfthecontourtobeblankedisirregularlyshaped,thesummationofshearingforcesononesideofthecenteroftherammaygreatlyexceedtheforcesontheotherside.Suchirregularityresultsinabendingmomentinthepressram,andundesirabledeflectionsandmisalignment.Itisthereforenecessarytofindapointaboutwhichthesummationofshearingforceswillbesymmetrical.Thispointiscalledthecenterofpressure,andisthecenterofgravityofthelinethatistheperimeteroftheblank.Itisnotthecenterofgravityofthearea.模具与数控专业英语Thepresstoolwillbedesignedsothatthecenterofpressurewillbeontheaxisofthepressramwhenthetoolismountedinthepress.模具与数控专业英语2.4.3ClearancesClearanceisthespacebetweenthematingmembersofadieset.Properclearancesbetweencuttingedgesenablethefracturestomeet.Thefracturedportionoftheshearededgewillhaveacleanappearance.ForOptimumfinishofacutedge,properclearanceisnecessaryandisafunctionofthetype,thickness,andtemperoftheworkmaterial.Clearance,penetration,andfractureareshownschematicallyinFigure2-7.模具与数控专业英语Figure2-7Punch-and-dieclearance,punchpenetrationintoandfractureofdie-cutmetal模具与数控专业英语2.4.4BlankingDieDesignThedesignofasmallblankingdieshowninFigure2-8isthesameasthatthepiercingdieofFigure2-4exceptthatadiereplacesthediebushingsandthetwopiercingpunchesarereplacedbyoneblankingpunch.Astockstopisincorporatedinsteadofnestplates.Tinsisadrop-throughdesignsincethefinishedblanksdropthroughthedie,thelowershoe,andthepressbolster.模具与数控专业英语Figure2-8Asimpleblankingdie1.guidepost,2—guidebushing,3—stockstop,4—uppershoe,5—lowershoe.模具与数控专业英语Largeblanksarecommonlyproducedbyaninvertedblankingdie(Figure2-9)inwhichthedieismountedtotheuppershoewiththepunchsecuredtothebottomshoe.Thepassingofalargeblankthroughthebolsterisoftenimpracticalbutitssizemaynecessitatesectionaldiedesign(Figure2-10).模具与数控专业英语Figure2-9AinvertedblankingdieFigure2-10Eight-sectionlayoutfordie模具与数控专业英语Draft,orangularclearanceinaninverteddieisunnecessarybecausetheblankdoesnotpassthroughit.Foreaseofconstruction,regrinding,andstrengththecuttingedgesofeachsectionshouldnotincludepointsandintricatecontour,withstraightcontour.Sections1and2ofthedieofFigure2-10werelaidouttoincludetheentiresemicircularcontour,withstraightcontoursincludedintheothersixsections.模具与数控专业英语Thespring-loadedstripperismountedonthelowershoe;ittravelsupwardinstripperthestockfromthepunchfastenedtothelowershoe.Stripperboltsholdandguidethestripperinitstravel.Ontheupstrokeoftheram,theupperendoftheknockoutrodstrikesanarmonthepressframe,whichforcesthelowerendoftheroddownward,throughthedie,andejectsthefinishedblankfromthediecavity.Astopcollarretainstherodsandlimitstheirtravel.模具与数控专业英语2.4.5DefinitionofVariousShearingOperationsSeveraloperationsbasedontheshearingprocessareperformed.Wefirstdefinetwoterms.Inpunching,theshearedslugisdiscarded(Figure2-11a).Inblanking,theslugisthepartandtherestisscrap.Manyoftheoperationsdescribedbelowcannowbecarriedoutoncomputer-numerical-controlledmachineswithquick-changetoolholders.Suchmachinesareparticularlyusefulinmakingthoseprototypesofsheet-metalpartsthatrequiresever
本文标题:【模具与数控专业英语】教学内容2104
链接地址:https://www.777doc.com/doc-3338861 .html