您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 3#楼---一次性百替模壳施工方案
山东桓台建设工程有限公司百替模壳施工方案1目录一、前言·····················································································2二、施工准备····················································································21、材料及主要机具·········································································22、作业条件··················································································2三、施工工艺流程及操作要点······························································31、施工工艺流程············································································32、操作要点··················································································3四、质量标准···················································································144.1、主控项目···············································································144.2、一般项目···············································································14五、质量控制···················································································141、质量控制标准···········································································142、质量保证措施···········································································14六、成品保护···················································································15七、模壳施工中的注意事项································································15八、安全与环境···············································································17山东桓台建设工程有限公司百替模壳施工方案2百替模壳施工方案一、前言一次性模壳,是用塑料制成的构件。一次性模壳是一种新型模壳,是周转模壳的更新换代产品。该模壳不受长、宽、梁高的限制,可根据荷载需要任意设计。且能制作出各种异型模壳,具有施工方便,尺寸设计灵活,耐火性高,节能环保,不易老化,抗渗漏能力强,自防水性高,不受季节影响施工等优点。具有保温隔音的效果;与混凝土间有较强的结合能力,塑性较好,可以随着混凝土的温度而变形;施工速度快,在混凝土浇筑后,模壳与混凝土结合在一起,不用拆模壳,缩短工期,节省材料及人工费用。在施工中将一次性模壳放在小肋梁之间,固定牢固,用以保证小肋梁的轴线位置和截面尺寸,同时起到小肋侧模的作用。采用一次性模壳密肋楼盖结构体系能增加大跨度建筑空间净高,使建筑物具有空间开畅、自重轻等优点。由山东桓台建设有限公司建设的烟台技术职业学院老校区3#楼地下室工程,其楼盖形式全部采用一次性模壳密肋梁楼盖。二、施工准备1、材料及主要机具1)本工程采用的规格有450×450×125,450×450×150,450×450×200三种规格。模壳本身的几何尺寸、外观质量和力学性能,均应符合国家和行业有关标准以及设计的需要,并应有产品出厂合格证、检测报告。2)支架系统支撑结构:48系列扣件式脚手架;水平面配料:100×50方木、12厚胶合板、12铁丝、铁钉等;主要机具:锤、斧、锯、电钻、水平尺、撬棍等。2、作业条件1)模板及支架系统设计根据工程结构类型和特点,确定流水段划分;确定模壳的平面布山东桓台建设工程有限公司百替模壳施工方案3置,纵横木方的规格、数量和排列尺寸;确定模壳与次木方及其它结构构件的连接方式。同时确定模壳支架系统的组合方式。验算模壳和支架的强度、刚度及稳定性。绘制模壳及支架系统的设计图、模板平面布置总图、模板及支架的组装图、零件加工图、统计详细分区分段编好号的料单,材料进场后分类堆放,做到有序可查。2)承重构件柱、剪力墙的混凝土强度已达到设计或施工规范要求的再施强度。3)测量控制楼面的轴线、水准标高引测到墙、柱上。4)支撑体系模板及其支架应具有足够的承载能力、刚度和稳定性,能可靠地承受浇筑混凝土的重量、侧压力以及施工荷载。顶托粗调标高后,先铺放钢管,其间距大约为700~900。之后在主木楞上安装100×50木方,其间距为100。木方安装就位,满铺12厚木胶合板。5)安全措施模板及其支架拆除的顺序及安全措施应按施工方案执行。三、施工工艺流程及操作要点1、施工工艺流程施工工艺流程:搭设满堂脚手架→铺设钢管→弹肋梁中心线→绑扎框架梁和肋梁钢筋→绑扎底部平板钢筋→组装、吊装模壳→铺设垫块→摆放、固定模壳→绑扎顶排钢筋→调整模壳→浇筑混凝土→模板拆除。2、操作要点(1)搭设满堂脚手架本工程为3#楼南地下室及商业网点,最高层4.9m,最大跨度10.1m。根据实际情况,脚手架平面布置纵横间距700~800,若遇梁,则在梁山东桓台建设工程有限公司百替模壳施工方案4两侧;立面布置,地面以上200第一道,以上每1800一道;设剪刀撑,须由底到顶连续设置,跨度大于6m的须在跨中成十字型设竖向剪刀撑。旋转扣件和对接扣件的抗滑必须确保拧紧牢固,必要时增设构件加固。4m立杆采用32长60cm顶丝,4.2m28长50cm顶丝。通过计算,满足荷载要求。计算书如下:百替模壳楼板板使用满堂脚手架计算书:○1、参数信息:1.脚手架参数横向间距或排距(m):0.80;纵距(m):0.80;步距(m):1.80;立杆上端伸出至模板支撑点长度(m):0.40;脚手架搭设高度(m):4.0~4.2;采用的钢管(mm):Φ48×3.0;扣件连接方式:双扣件,扣件抗滑承载力系数:0.80;板底支撑连接方式:方木支撑;2.荷载参数模板与木板自重(kN/m2):0.350;混凝土与钢筋自重(kN/m3):25.000;楼板浇筑厚度(m):0.400或0.620;倾倒混凝土荷载标准值(kN/m2):2.000;施工均布荷载标准值(kN/m2):1.000;3.木方参数木方弹性模量E(N/mm2):9500.000;木方抗弯强度设计值(N/mm2):13.000;木方抗剪强度设计值(N/mm2):1.300;木方的间隔距离(mm):100.000;木方的截面宽度(mm):50.00;木方的截面高度(mm):100.00;山东桓台建设工程有限公司百替模壳施工方案5脚手架支撑体系立面大样图○2、模板支撑方木的计算:方木按照简支梁计算,方木的截面力学参数为本算例中,方木的截面惯性矩I和截面抵抗矩W分别为:W=5.000×10.000×10.000/6=83.33cm3;I=5.000×10.000×10.000×10.000/12=416.67cm4;方木楞计算简图1.荷载的计算:(1)百替模壳楼盖按钢筋混凝土板自重(kN/m):q1=25.000×0.400×0.100=1.000kN/m;(2)模板的自重荷载(kN/m):山东桓台建设工程有限公司百替模壳施工方案6q2=0.350×0.100=0.035kN/m;(3)活荷载为施工荷载标准值与振倒混凝土时产生的荷载(kN):p1=(1.000+2.000)×0.800×0.100=0.240kN;2.强度计算:最大弯矩考虑为静荷载与活荷载的计算值最不利分配的弯矩和,计算公式如下:均布荷载q=1.2×(1.000+0.035)=1.242kN/m;集中荷载p=1.4×0.240=0.036kN;最大弯距M=Pl/4+ql2/8=1.134×0.800/4+1.242×0.8002/8=0.326kN.m;最大支座力N=P/2+ql/2=1.134/2+1.242×0.800/2=1.064kN;截面应力σ=M/w=0.541×106/83.333×103=6.495N/mm2;方木的计算强度为6.495小13.0N/mm2,满足要求!3.抗剪计算:最大剪力的计算公式如下:Q=ql/2+P/2截面抗剪强度必须满足:T=3Q/2bh[T]其中最大剪力:Q=0.800×1.242/2+1.134/2=1.064kN;截面抗剪强度计算值T=3×1063.8/(2×50.000×100.000)=0.319N/mm2;截面抗剪强度设计值[T]=1.300N/mm2;方木的抗剪强度为0.319小于1.300,满足要求!4.挠度计算:最大弯矩考虑为静荷载与活荷载的计算值最不利分配的挠度和,计算公式如下:均布荷载q=q1+q2=2.250+0.105=2.355kN/m;集中荷载p=0.810kN;最大变形V=5×2.355×900.0004/(384×9500.000×4166666.67)+810.000×900.0003/(48×9500.000×4166666.67)=0.819mm;方木的最大挠度0.819小于900.000/250,满足要求!○3、木方支撑钢管计算:支撑钢管按照集中荷载作用下的三跨连续梁计算;集中荷载P取纵向板底支撑传递力,P=2.826×0.900+1.134=3.677kN;山东桓台建设工程有限公司百替模壳施工方案7支撑钢管计算简图最大弯矩Mmax=0.883kN.m;最大变形Vmax=2.042mm;最大支座力Qmax=12.013kN;截面应力σ=0.883×106/5080.000=173.779N/mm2;支撑钢管的计算强度小于205.000N/mm2,满足要求!支撑钢管的最大挠度小于900.000/150与10mm,满足要求!○4、扣件抗滑移的计算:按照《建筑施工扣件式钢管脚手架安全技术规范培训讲座》刘群主编,P96页,双扣件承载力设计值取16.00kN,按照扣件抗滑承载力系数0.80,该工程实际的旋转双扣件承载力取值为12.80kN。纵向或横向水平杆传给立杆的竖向作用力设计值R=12.013kN;R12.80kN,所以双扣件抗滑承载力的设计计算满足要求!○5、模板支架荷载标准值(轴力):作用于模板支架的荷载包括静荷载、活荷载和风荷载。1.静荷载标准值包括以下内容:(1)脚手架的自重(kN):NG1=0.129×4.350=0.562kN;(2)模板的自重(kN):NG2=0.350×0.800×0.800=0.224kN;(3)钢筋混凝土楼板自重(kN):NG3=25.000×0.400×0.800×0.800=6.400kN;经计算得到,静荷载标准值NG=NG1+NG2+NG3=7.186kN;2.活荷载为施工荷载标准值与振倒混凝土时产生的荷载。经计算得到,活荷载标准值NQ=(1.000+2.000)×0
本文标题:3#楼---一次性百替模壳施工方案
链接地址:https://www.777doc.com/doc-4173802 .html