您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 其它文档 > JN水电站首部枢纽设计江昆
-1-西华大学毕业设计说明书目录目录.............................................................-1-摘要.............................................................-2-1.前言...........................................................-1-2.基本资料.......................................................-2-2.1工程概况....................................................-2-2.2水文........................................................-2-2.3区域地质与地震..............................................-3-3.工程等级、建筑物级别及防洪标准.................................-4-3.1确定工程等级................................................-4-3.2水闸段工程等级..............................................-4-3.3防洪标准的确定..............................................-4-4.坝轴线选择及首部枢纽布置.......................................-5-4.1坝址选择....................................................-5-4.2坝线选择....................................................-5-5.水闸设计.......................................................-8-5.1堰型选择....................................................-8-5.2闸底板高程的选定............................................-8-5.3计算闸孔总净宽..............................................-8-5.4校核闸孔出流能力...........................................-10-6.水闸消能及抗磨设计............................................-12-6.1护坦设计...................................................-12-6.2海漫设计...................................................-13-6.3防冲齿槽的设计.............................................-13-7.水闸防渗排水设计..............................................-15-7.1地下轮廓设计...............................................-15-7.2渗流计算...................................................-15-8闸室稳定分析..................................................-18-8.1荷载计算...................................................-18-8.2闸室稳定计算...............................................-23-9.非溢流坝剖面设计..............................................-30-9.1坝型及筑坝材料.............................................-30-8.2坝体三角形基本坡面确定.....................................-30-9.3实用坡面设计...............................................-31-9.4非溢流坝荷载计算...........................................-36-9.5坝基抗滑稳定验算...........................................-41-9.6坝踵与坝趾处应力校核.......................................-45-9.7细部结构...................................................-47--2-西华大学毕业设计说明书10.结论.........................................................-49-总结与体会......................................................-50-谢辞............................................................-51-参考文献........................................................-52--3-西华大学毕业设计说明书摘要JN水电站位于四川省××县境内的××河流域下游河段上,为低闸引水式电站,是单一发电工程。本设计对JN水电站首部枢纽工程进行设计。主要设计内容包括确定枢纽布署方案,首部枢纽建筑物从右至左依次布置右岸挡水坝段,泄洪闸、冲沙闸、左岸挡水坝段。对闸室进行结构布置,设置了两孔泄洪闸(6m×6m)及一孔冲砂闸(2.6m×6m),并对闸室进行抗滑稳定分析,满足要求。非溢流坝面设计,并对其进行荷载计算,计算显示均满足要求。最后绘制了相关图纸。【关键词】JN水电站;枢纽布置;剖面设计;稳定分析;应力计算AbstractJNhydropowerstationislocatedinSichuanProvince××county××riverbasindownstreamoftheriver,forthelowgatewaterpowerstation,isasinglepowergenerationproject.ThedesignoftheJNhydropowerstationhubprojectdesign.Themaindesignincludesthedeterminationofthehubdeploymentplan,thefirsthubofthebuildingfromrighttoleftinturnarrangedtherightbankofthedamsection,floodgates,scavenging,leftbankretainingdamsection.(6m×6m)andoneholeflushinggate(2.6m×6m),andtheanti-slidingstabilityanalysisofthechamberissatisfiedtomeettherequirements.Non-overflowdamsurfacedesign,anditsloadcalculation,calculationshowstomeettherequirements.Finallydrawtherelevantdrawings.【Keywords】JNhydropowerstation;hublayout;profiledesign;stabilityanalysis;stresscalculation-1-西华大学毕业设计说明书1.前言随着经济的发展,人口的不断增长,人们对于电力资源的需求逐渐增大。同时,相比于风电,火电,核电,水电具有储量大,可再生,安全系数较高等优点。水电在我国能源所占的比例正在逐渐加大。JN水电站为低闸引水式电站。为单一发电工程,无其他要求。JN水电枢纽工程的拦河坝为闸坝,由两孔泄洪闸和单孔冲沙闸,以及左右岸的非溢流重力坝组成。挡水坝段为非溢流坝,根据工程地质和地形情况,确定了泄洪闸和冲沙闸的尺寸,泄洪闸2孔,6m6m,冲沙闸1孔,2.5m6m。并且设置了49米长的护坦,21米长的海漫以及5.45米深的防冲齿槽用以消能。设置了20米长的铺盖用以防渗。并对地下轮廓进行了布置。对闸室进行了稳定分析,满足应力要求。设计了非溢流坝,对其荷载进行分析,达到相应的要求。对坝顶细部结构也做了相应的布置。-2-西华大学毕业设计说明书2.基本资料2.1工程概况2.1.1电站基本情况JN水电站为低闸引水式电站。水库正常蓄水位2378.00m,总库容197.5万m³,具有日调节性能。额定引用流量60.28m³/s。电站装机2台,总装机容量240MW。本工程规模为中型,工程等别为Ⅲ等,挡水建筑物按3级设计,次要建筑物按4级设计,临时性建筑物为5级。2.1.2洪水标准根据《水电枢纽工程等级划分及设计安全标准》(DL5180-2003)。首部挡、泄水建筑物洪水标准:设计洪水重现期为50年;校核洪水重现期为500年。下游消能防冲建筑物洪水标准为30年一遇。洪水标准及相应流量见表2-1。表2-1永久性水工建筑物洪水标准项目设计洪水校核洪水重现期(年)流量(m3/s)重现期(年)流量(m3/s)闸址50499500679泄水建筑物消能防冲设计30458厂址(大渡河边)50500020059602.2水文2.2.1流域概况×××河是大渡河上游右岸一级支流。×××河流域位于四川省西部,地理位置介于东经101°17′~102°12′,北纬30°29′~31°29′之间,属岷山、邛崃山高山区。×××河水面宽30~50m,多为“U”型河谷,平均坡降34.5‰。两河口至磨子沟汇口河长14.9km,河道较顺直,河宽30~50m,亦多为“U”型河谷,平均坡降22.2‰。磨子沟汇口至大桑河段河长18.3km,平均坡降11.8‰。2.2.2气象×××河流域属青藏高原型季风气候。×××河流域内仅有雨量站一个,无气象站点。JN水电站距离××气象站(测站海拔高程1949.7m)较近,该气象站于1961年设立,其气象资料可供JN水电站设计参考。据××县气象站历年资料统计,极端最高气温和极端最低气温分别为-3-西华大学毕业设计说明书39.0℃、-10.6℃,多年平均风速为3.5m/s,最多风向ENE、C。2.2.3暴雨洪水特性据布科站洪水资料统计,年最大洪峰流量见表2-2。年最大洪峰最早出现在5月初(1989年5月28日,洪峰流量354m³/s),最晚出现在9月底(1970年9月28日,洪峰流量216m³/s)。布科水文站年最大流量系列最大值为386m³/s(1992年6月26日),最小值为152m³/s(1967年7月10日),前者仅为后者的2.54倍,洪水年际变化不大。表2-2布科水文站年最大流量各月发生频次统计表项目5月6月7月8月9月总计统计年限次数1181977521961~2012百分比1.934.636.513.513.52.3区域地质与地震×××河流域位于四川省西部,地理位置介于东经101°17′~102°12′,北纬30°29′~31°29′
本文标题:JN水电站首部枢纽设计江昆
链接地址:https://www.777doc.com/doc-4829864 .html