您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 人事档案/员工关系 > 灌砂法压实度自动计算表
12345671-561-21-541-491-31-6840.0038.0040.0040.0037.0041.009152.71156.98206.66161.34109.00174.9910147.73151.25200.15155.88105.13168.4711107.73113.25160.15115.8868.13127.47124.995.736.515.463.886.52134.65.14.14.75.75.11415161718序号监理单位上海先行建设监理有限公司单项工程名称土方承台范围试验项目公式15压实层厚度(cm)15151515152.16压实度(15)/(16)·100%90.397.797.796.496.197.0最大干密度(g/cm3)2.162.162.162.162.165.4干密度(g/cm3)(6)/(1+0.01w)1.972.112.112.082.082.093.8平均含水量(%)4.45.03.95.14.1含水量(12)/(11)·1004.24.93.75.54.4117.05水重(g)(9)-(10)5.614.483.143.146.464.45干土重(g)(10)-(8)134.6390.7384.2257.27146.82161.50盒+干土重(g)175.63130.73123.2292.27187.82157.05盒+湿土重(g)181.24135.21126.3695.41194.281-71盒重(g)41.0040.0039.0035.0041.0040.00盒号1-671-461-281-321-53880湿密度(g/cm3)(5)/(4)2.0602.2152.1912.1882.1602.207湿试样重(g)450542203925392037102619坑体积(cm3)(3)/(Ps)218719051791179117171758灌入试坑砂重(g)(1)-(2)-(m2)325928392669266925599000灌砂后筒+砂重(g)505054705640564057505690灌砂前筒+砂重(g)90009000900090009000试验位置(桩号)K281+130左K281+130右K281+160左K281+160右K281+190左K281+190右最大干容量(g/cm3)2.16最佳含水量(%)5.8要求压实度(%)95K281+100~K282+300层次1锥体内砂重m:(g)691标准砂密度Ps(g/cm3)1.49施检表(21)灌砂法压实度检测记录表编号:第页共页项目名称京沪高速铁路廊坊站站房综合楼施工单位中铁建工集团京沪高铁站房六标项目部合同段第复核注:压实层厚度为灌砂后挖至下层实测值技术主办项目主管测量日期自检意见该层压实度平均值为:均方差为:代表值为:故该层压实度符合要求。监理意见测量计算湿样重干样重85407749.54627910.20%含水率123456789101112131415161718复核序号试验项目公式注:压实层厚度为灌砂后挖至下层实测值技术主办项目主管测量日期自检意见监理意见测量计算压实层厚度(cm)压实度(15)/(16)·100%最大干密度(g/cm3)干密度(g/cm3)(6)/(1+0.01w)平均含水量(%)含水量(12)/(11)·100水重(g)(9)-(10)干土重(g)(10)-(8)盒+干土重(g)盒+湿土重(g)盒重(g)盒号湿密度(g/cm3)(5)/(4)湿试样重(g)度坑体积(cm3)(3)/(Ps)灌入试坑砂重(g)(1)-(2)-(m2)灌砂后筒+砂重(g)灌砂前筒+砂重(g)试验位置(桩号)最大干容量(g/cm3)最佳含水量(%)要求压实度(%)层次锥体内砂重m:(g)标准砂密度Ps(g/cm3)监理单位单项工程名称范围施检表(21)灌砂法压实度检测记录表编号:第页共页项目名称施工单位合同段12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152
本文标题:灌砂法压实度自动计算表
链接地址:https://www.777doc.com/doc-5124477 .html