您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 剪力墙-施工组织设计
潍坊宝城建筑工程有限公司龙脉花园1#楼-1-龙脉花园居住小区1#楼施工组织设计编制人:审核人:编制单位:潍坊宝城建筑工程有限公司潍坊宝城建筑工程有限公司龙脉花园1#楼-2-目录第一章、编制依据·························································4第二章、工程概况·························································4第三章、施工现场平面布置·················································6第四章、施工部署·························································7第五章、主要分部分项施工方法·············································10第一节、测量方法·······················································10第二节、基础工程·······················································13第三节、钢筋工程·······················································15第四节、模板工程·······················································27第五节、混凝土工程·····················································32第六节、防水工程·······················································35第七节、脚手架工程·····················································42第八节、砌筑工程·······················································53第九节、楼地面工程·····················································56第十节、墙体保温节能工程···············································56第十一节、装饰工程·····················································57第十二节、门窗工程·····················································59第十三节、给排水及采暖工程·············································62第十四节、电气工程·····················································66第六章、工程质量、安全、进度主要保证措施·······························70第一节、质量保证措施···················································70第二节、质量通病防治措施···············································72第三节、施工技术措施···················································75第四节、冬雨季施工技术措施·············································75第五节、农忙季节施工措施···············································77第六节、安全施工技术措施···············································77第七节、工期保证措施···················································78第八节、文明施工措施···················································79第九节、环境保护措施作·················································82第十节、保修期及保修措施···············································82潍坊宝城建筑工程有限公司龙脉花园1#楼-3-第十一节、标高、轴线控制措施···········································82第十二节、造价控制技术措施·············································82第十三节、减少扰民、降低化境污染和噪音的措施···························82第十四节、地下管线及其他地上地下设施的加固保护措施·····················83第十五节、成品保护措施·················································83第七章、降低工程造价的措施···············································84附页:附表一、质量管理体系附表二、安全管理体系附表三、劳动力计划表附表四、主要施工机械设备表附表五、进度计划表附表六、施工现场平面布置图潍坊宝城建筑工程有限公司龙脉花园1#楼-4-第一章、编制依据1、工程施工招投标文件。2、青岛易境工程咨询有限公司设计的龙脉居住小区1#楼#楼施工图纸。3、筏板基础及剪力墙结构体系技术规程及验收标准4、国家有关施工验收规范、标准:《工程测量规范》(GB50026-2007);《建筑工程施工质量验收统一标准》(GB50300-2011);《建筑地基基础工程施工质量验收规范》(GB50202-2002);《砌体工程施工质量验收规范》(GB50203-2011);《混凝土结构工程施工质量验收规范》(GB50204-2002)(2011版);《屋面工程质量验收规范》(GB50207-2012);《地下防水工程施工质量验收规范》(GB50208-2011);《建筑地面工程施工质量验收规范》(GB50209-2010);《建筑装饰装修工程施工质量验收规范》(GB50210-2001);《建筑给水排水与采暖工程施工质量验收规范》(GB50242-2002);《建筑电气照明装置施工与验收规范》(GB50617-2010);《建筑施工安全检查标准》(JGJ59-2011);《施工现场临时用电安全技术规范》(JGJ46-2005);《建筑施工高处作业安全技术规范》(JGJ80-1991);《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)。第二章、工程概况项目名称:龙脉花园居住小区1#楼建设单位:山东龙脉置业有限公司监理单位:潍坊誉祥工程建设监理有限公司施工单位:潍坊宝城建筑工程有限公司设计单位:青岛易境工程咨询有限公司勘察单位:潍坊市基础工程公司项目位置:昌乐309国道以北,新昌路以东。潍坊宝城建筑工程有限公司龙脉花园1#楼-5-1、该工程为剪力墙结构,地下二层,地上十六层住宅,建筑高度为52.650m,总建筑面积为7957㎡,东西长30.48米,南北宽17.48米。。给排水及采暖、消防、电气、电话、电视、宽带网等智能建筑配套齐全。2、结构设计说明该工程基础类型为钢筋砼筏板基础,主体结构形式为剪力墙结构。100厚C15混凝土满堂垫层;筏板基础、地下室剪力外墙砼强度等级为C30加抗渗,其等级为P6,剪力墙、框架柱、梁、板、梯混凝土砼强度等级为C30。圈梁、构造柱、现浇过梁标准构件为C20混凝土,屋面为C30微膨胀混凝土。第三章、施工现场平面布置一、施工总平面布置原则根据本工程特点,施工平面布置应充分考虑各种环境因素及施工需要,布置时应遵循原则如下:1、施工现场总平面布置应结合建筑物的总体规划,和建筑周边的环境,并随着工程施工进度进行布置和安排,阶段平面布置要与该时期的施工重点相适应。2、根据场地特点,在平面布置中应充分考虑好施工机械设备、办公、道路、现场出入口、临时堆放场地等的优化合理布置。3、施工材料堆放应尽量设在垂直运输机械覆盖的范围内,以尽量减少发生二次搬运为原则。4、中小型机械的布置,要处于安全环境中,要避开高空物体打击的范围。5、临电电源、电缆、电线敷设要避开人员流量大的楼梯及安全出口,以及容易被坠落物体打击的范围,电线电缆尽量采用暗敷方式。6、本工程将着重加强现场安全管理力度,严格按照公司的《项目安全管理手册》的要求进行管理。7、本工程要重点加强环境保护和文明施工管理的力度,使施工现场保持整洁、卫生、有序合理的状态,并使该工程在环保、节能等方面成为一个名副其实的绿色建筑。8、易产生粉尘、噪音的设备设施布置于远离居民小区的位置。9、设置便于大型运输车辆通行的现场道路并保证其可靠性。10、水、电及施工机械的供应和布置要满足施工的需求。11、要保证整个施工现场的布置整洁、实用、合理、有效。二、施工总平面图的内容1、施工道路布置结合建筑物的总体规划,在场地内布置环行道路,施工通道8m,主道用混凝土硬化。其余用碎石屑垫好,并注意路面的排水坡度。为防止进出车辆污染路面,在出入口处设置车辆冲洗设备及冲洗槽;另为保证现场排水通畅,道路两侧须设明排水沟。2、大型机械布置塔吊等垂直运输设备:根据本工程建筑物占地面积大的特点,用汽车混凝土输送泵进潍坊宝城建筑工程有限公司龙脉花园1#楼-6-行混凝土的输送。该工程主体结构施工阶段,设置一台QTZ-40塔式起重机,供整段工程的垂直和水平运输,塔吊基础设在地下车库地面-6.65m地坪下。在装修阶段,设一台JS500砂浆搅拌机,混凝土搅拌机一台。3、临建设施布置1)、办公区:分别在施工现场的南侧搭设钢结构临时办公室、保管室、会议室、职工夜校,厕所在办公区东南角。工地入口前空地,按淄博市安全文明工地有关要求布置相应的图牌,成品洗车设备及120吨地磅。2)、工人生活区:在临时办公区东侧,生活区内有施工人员宿舍、食堂,淋浴室、厕所、洗手池。3)、生产加工区:在办公区西侧空地上,钢筋加工棚及钢筋堆放区、木工棚(具体位置见施工平面布置图),在结构施工阶段,在楼各栋楼侧空地堆放砌块,完全进入装修阶段后,装修材料堆放至钢筋加工场。4)、施工现场大门:设门卫值班室围墙:施工现场的西侧及北侧围墙采用钢制围墙高4米大门采用自制方管大门,门垛采用L8*8角钢焊接,尺寸:门垛1100*1100*6000(高),门口用铝塑板精装修,大门围墙布置安装按公司统一要求设置。4、施工总平面布置图施工总平面布置图:详见施工现场平面布置图第四章、施工部署一、工程目标1、质量目标:实现对业主的质量承诺,严格按照合同条款要求及现行规范标准组织施工,工程质量合格。2、安全目标:(1)无人身重伤及以上伤亡事故;(2)无交通死亡事故;(3)无重大行车事故;(4)无等级火灾事故。3、工期目标:开工日期:2013年2月28日竣工日期:2015年2月28日4、现场管理目标:创建市级安全文明工地,争创省级安全文明示范工地。二、管理组织机构1、组织机构:根据该工程特点,我公司选派路全义为项目经理承建该工程。该项目部是一支素质较高的队伍,具有较强的领导班子和技术力量,成熟的创优经验,昼夜奋斗的拼搏精神及高尚的职业道德。该项目部施工的工程以速度快、质量好、一次性交付使用潍坊宝城建筑工程有限公司龙脉花园1#楼-7-多次迎得了业主、监理公司及主管部门的好评。由具有丰富施工经验的项目经理担任该工程项目经理,配备施工过同类工程,专业
本文标题:剪力墙-施工组织设计
链接地址:https://www.777doc.com/doc-5294358 .html