您好,欢迎访问三七文档
当前位置:首页 > 行业资料 > 国内外标准规范 > 干挂壁山板幕墙的施工技术
GUANGDONGARCHITECTURECIVILENGINEERING201344APR2013No.41,,、,,,,、、、、,;,,,,,。,、、,,,。、PVC、,、、、,,、,。,,,;、,,,。,,。()29,8.4m2,,。、,8000m2,53m,。22.1,(),(),,,,,,,。2.2⑴,,;(510010):,,,,。:;;;;ConstructionTechnologyoftheBacePanelDryHangingCurtainWallChenHanchangChenJunshengHuangYupeng(TheFirstConstructionEngineeringCo.,Ltd.ofGuangdongProvinceGuangzhou510010,China)Abstract:ThisarticlebrieflydescribestheperformanceandcharacteristicsoftheBacePanel,aswellasitsdryhangingprocessesandtechnicalpointswiththeconstructionexamples.Astherearenothavethequalityofconstructionproceduresandacceptancecriteria,thisarticlecanbeusedforreferenceintheconstruction.Keywords:exteriorwall;BacePanel;pendant;steelskeleton;curtainwall38:APR2013No.4201344,,。⑵,、、、,,;、;、;,。⑶,,。⑷,,,,,。33.1:300×200×10,100×100×4,、50×30×2,80×50×2,。3.2:2400×4600×15,≥1.6gcm3,4.3%,14%,0.14%,28MPa,25MPa,9869Nmm2,8051Nmm2,35MPa,0.201W(m·K)。3.3:,、。44.1→→→→→→→→→→“”→。4.2⑴①、;②,;③、,;④、。⑵①、,15cm,、、,、,;②,;③、、,10cm;④,。⑶①RM12×160,,→→→→、;②,,≥10kN,>12kN,。⑷①(300×200×10),;②,∠75×50×6、L=60,,;③,,。⑸①:,∠40×4、L=40,L=30040×40×2,,,,,,20mm,,、、;②:M8×50,、;③,∠40×4、L=4050×30×2;④,、。392①②③②④④⑤⑥⑦⑦⑧⑨⑩⑧輥輯訛輥輰訛輥輱訛輥輰訛輥輲訛輥輳訛訳①④①⑤⑤⑥⑦⑦⑧⑧⑨⑩輥輲訛輥輲訛輥輴訛輥輵訛輥輶訛訴③①②③(100×100×4)④(∠75×50×6,L=60)⑩(300×200×10)輥輯訛輥輰訛輥輱訛輥輲訛⑤(M8×50)⑥(∠40×4,L=40)⑦(50×30×2)⑧(15)⑨(M12×150)輥輳訛輥輴訛輥輵訛輥輶訛1APR2013No.4201344⑹、、,~9,f12,4Ω。⑺,1.5mm,,。⑻,。①,,,;②,,,,,,,;③,6mm,。1。⑼①,,,;②,,15mm、8mm,,;③,,,(10~20min),(15min),,。⑽“”:,、、、,。2。5、、,、、,,,,,。[1].[C].(2),200940
本文标题:干挂壁山板幕墙的施工技术
链接地址:https://www.777doc.com/doc-9099938 .html