当前位置:首页 > 建筑/环境 > 工程监理 > 模板安装危大工程专项施工方案
〖XXXXXX项目模板安装专项施工方案〗XXXXX集团股份有限公司第1页一、工程概况·············································31.1工程概况和特点·········································31.2构建参数········································41.3施工平面布置·········································61.4施工要求和技术保证条件·································6二、编制依据·········································7三、施工计划·······································83.1施工进度计划·········································83.2材料与设备计划·········································8四、施工工艺技术·········································94.1技术参数·········································104.2工艺流程·········································124.3施工方法·········································134.4操作要求·········································174.5检查要求·······································20五、施工安全保证措施·····································235.1组织保障措施·······································235.2技术措施·······································255.3监测监控措施·······································28六、施工管理及作业人员配备和分工·························296.1施工管理人员·······································296.2专职安全生产管理人员·································30〖XXXXXX项目模板安装专项施工方案〗XXXXX集团股份有限公司第2页6.3特种作业人员·······································30七、验收要求·······································317.1验收标准·······································317.2验收程序·······································317.3验收内容·······································327.4验收人员等·······································32八、应急处置措施·······································33九、计算书及相关施工图纸································35附表一:平面布置图〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第3页一、工程概况:1.1工程概况和特点工程名称:乐海乐器有限公司民族乐器升级转型项目结构形式:框架结构总工期340天建设:乐海乐器有限公司设计单位:北京首都工程建筑设计有限公司勘察单位:河北龙和岩土工程有限公司施工单位:大元建业集团股份有限公司监理单位:保定市建筑设计院有限公司建设内容:本工程为乐海乐器有限公司民族乐器转型升级项目-办公楼、2#厂房工程,位于肃宁县肃尚路西侧北绕城路北侧。本建筑二类高层办公楼总建筑面积为8859.25㎡,建筑占地面积为1305.41㎡,地上七层,建筑高度29.75米(室外地坪至屋面面层)。本工程建筑结构类型为框架结构,设计使用年限为50年,抗震设防烈度为7度,耐火等级为二级。外门窗均采用断桥铝Low-E+12氩气+6透明玻璃,隔热桥截面高度≧24mm,传热系数为2.00W/㎡.k,内平开窗。本建筑2#厂房总建筑面积为11593.30㎡,建筑占地面积2873.35㎡,地上四层,建筑高度21.00米(室外地坪至屋面面层)。基础形式为柱下独立基础,建筑分类多层厂房,耐火等级为Ⅱ级,抗震设防烈度为7度,火灾危险性分类丙类(木质乐器组装)。本项目整厂区约800人,本厂房人数约为100人,不属于人员密集场所。外门窗均采用断桥铝6Low-E+12空气+6透明玻璃,传热系数为2.8W/㎡.k,内平开窗。由于本工程厂房首层结构层高为7m,模板搭设高度超过5m,属于危险〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第4页性较大分部分项工程,须按有关文件及施工规范要求进行施工设计,因此编制本专项施工方案指导施工。1.2构建参数1.2.12#厂房:楼层数层高构件名称构件尺寸模板搭设高度首层7m柱800mm×800mm6.72m(验算时取7m)板110mm验算时取最大板厚120mm梁300mm×900mm验算时取最大规格梁(即300mm×900mm)300mm×800mm300mm×700mm250mm×550mm200mm×500mm2~4层4.5m柱750mm×750mm4.22m(验算时取4.5m)验算时取最大规格柱(即750mm×750mm)700mm×700mm600mm×600mm500mm×500mm板110mm(4层为120mm)验算时取最大板厚120mm梁300mm×900mm验算时取最大规格梁(即300mm×900mm)300mm×700mm250mm×700mm250mm×550mm200mm×500mm〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第5页1.2.2办公楼楼层数层高构件名称构件尺寸模板搭设高度首层4.5m柱800mm×800mm4.22m(验算时取4.5m)750mm×750mm板110mm、120mm验算时取最大板厚120mm梁300mm×700mm验算时取最大规格梁(即300mm×700mm)300mm×670mm300mm×650mm250mm×400mm200mm×300mm2~6层3.9m柱750mm×750mm3.62m(验算时取3.9m)验算时取最大规格柱(即750mm×750mm)700mm×700mm600mm×600mm板110mm、120mm验算时取最大板厚120mm梁400mm×800mm验算时取最大规格梁(即400mm×800mm)400mm×700mm300mm×670mm300mm×650mm250mm×600mm7层5.1m柱600mm×600mm4.82m(验算时取5.1m)板120mm验算时取最大板厚120mm梁250mm×600mm验算时取最大规格梁(即250mm×600mm)250mm×550mm〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第6页1.3施工平面布置1、据本工程施工的实际情况,设置一个加工棚,木工棚的设置位置在联合车间南侧。2、木工加工场地的布置:木工加工场地的布置原则,塔吊、农用车短距离运输配合。模板原材料堆放在木方支墩上,半成品料堆放在平整场地上,地面以粘土砖铺贴或碎石铺垫。3、木工机械的投入:每个木工加工棚内设置2台木工圆盘锯,2台手提电钻。其它的手工机具按需要配置。4、木工的投入:本工程中木工主要以,框架柱、梁、板模板的制作与加固因此在人员的投入上,基础部分相对人数较少,主体结构部分人员要明显增多。(平面图后附表一)1.4施工要求和技术保证条件1.3.1确保模板在使用周期内安全、稳定、牢靠。1.3.2模板在搭设及拆除过程中要符合工程施工进度要求。操作人员需取得特殊作业人员资格上岗证。1.3.2技术保证条件1.3.2.1模板支撑体系搭设前,对木工班组全体成员进行技术培训,对与支撑体系搭设相关的内容进行全面的技术交底。搭设过程中安排项目部技术负责人及专职安全员随时对架体的搭设情况,依据专项施工方案、施工图纸及相关文件、规范的要求进行现场检查,发现问题立即通知木工班组进行整改,并对整改情况及时进行落实。模板支撑体系搭设完成后,由公司技术负责人组织技术、安全、质量、等处、项目经理部相关人员以及总监〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第7页理工程师进行联合验收,验收不合格不得进行混凝土的浇筑。1.3.2.2选择具有丰富类似模板支架体系搭设施工经验的技术员、安全员进行施工管理,优选具有丰富类似模板支撑体系搭设施工的架子工、木工施工队伍进行实际搭设操作,从而确保能够严格按照图纸及构造要求进行搭设,确保安全施工全过程的安全。1.3.2.3严格按照《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2011《建筑施工模板安全技术规范》JGJ162-2008中的相关要求进行本工程模板支架的计算、验算,从而确保模板支撑体系搭设的每一个数据都有据可依,从技术上保证模板支撑体系的安全性。1.3.2.4模板的搭设和拆除需严格执行该《专项施工方案》二、编制依据2.1《建筑结构荷载规范》(GB50009-2012)2.2《混凝土结构设计规范》(GB50010-2010)2.3《建筑施工模板安全技术规范》(JGJ162-2008)2.4《钢结构设计规范》(GB50017-2003)2.5《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)2.6《建筑施工高处作业安全技术规程》(JGJ80-2016)2.7《施工现场临时用电安全技术规程》(JGJ46-2005)2.8《危险性较大的分部分项工程安全管理规定》【住建部令第37号】2.9《住房城乡建设部办公厅关于实施《危险性较大的分部分项工程安全管理规定》有关问题的通知建质办》【2018】31号2.10《建设工程安全生产管理条例》国务院令第393号2.11本工程设计图纸2.12本工程施工组织设计〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第8页三、施工计划3.1施工进度计划项目施工进度计划材料进场计划前期准备阶段2018.08.30-2018.09.10模板、木方、自2018.9.13起分批进场模板安装阶段2018.9.-2018.11.30模板、木方随施工进度进场,满足施工需要3.2材料与设备计划1、材料组织计划根据总体施工进度计划安排,粗计算各材料需求量如下表:材料组织计划材料名称单位需用数量钢管吨120木板张1000安全绿网㎡20002、设备组织计划设备名称单位需用数量架子扳手把50扭力扳手把30移动电箱只10碘钨灯只10全站仪台2水准仪台33、在模板满足强度、刚度和稳定性要求的前提下,尽可能提高表面光洁度,阴阳角模板统一整齐。〖乐海乐器有限公司民族乐器转型升级项目外墙脚手架专项施工方案〗大元建业集团股份有限公司第9页4、搭设脚手架的钢管应采用现行国家标准《直缝电焊钢管》GB/T13793或《低压流体输送用焊接钢管》GB/T3092中规定的3号普通钢管,其质量符合现行国家标准《碳素结构钢》GB/T700中Q235A钢的规定,每根钢管的最大质量不应大于25kg。新用的钢管表面应平直光滑,不应有裂缝、结疤、分层、错位、硬弯、毛刺、压痕和深的划
本文标题:模板安装危大工程专项施工方案
链接地址:https://www.777doc.com/doc-1449769 .html