张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案11围堰及基坑开挖施工方案目录一、工程概况····················································································3二、施工组织和管理机构······································································4三、围堰与基坑开挖施工工艺流程·························································4四、施工进度计划···············································································5五、围堰与基坑开挖施工要点································································5六、土围堰设计计算············································································8七、基坑边坡稳定设计计算··································································8八、安全保证措施···············································································8九、质量保证措施············································································10十、文明施工措施············································································11十一、预防伤害安全生产事故应急救援预案············································12十二、附件·····················································································17附件1····························································································17附件2····························································································20附件3····························································································23附件4····························································································24附件5····························································································25张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案22一、工程概况本工程新建混凝土道路两条,全长274m,宽4m;新建4m×4m拱桥两座;1条现有混凝土道路进行沥青白改黑设计,长约400m;2m×8m钢桁架木桥1座;拆除、新建挡墙276m;新建停车位924m2、围墙152m;道路维修2260m2,并对现有驳岸压顶改建。工程施工前,先要拆除现有箱涵,拆除箱涵后,会影响现有交通通行,以及河流河水流淌,决定在箱涵拆除前先对A桥、B桥所在河道进行上下游围堰,后抽水清淤开挖的方式施工。1、围堰:施工围堰采用填筑碾压硬塑粘土,围堰分上游及下游挡土围堰。填土分层夯实,考虑汛期排涝要求,在上下游围堰不影响桩基施工部位设置直径1m的钢筋混凝土管涵。A桥、B桥围堰设计如下(具体见施工图):A桥、B桥围堰,河底清淤后河底硬土层顶标高约为1.6m,现有道路标高约为2.15m,河道常水位标高约为1.0m,上下游围堰顶标高设计为2.15m。围堰高度为3.75m,考虑通车要求,围堰顶宽度设为4m。围堰外侧(迎水面)设1:1.5边坡,内侧设1:1边坡。围堰底宽约为9.5m。围堰采用硬质粘土分层填筑压实,上边铺钢板方便村民通行,两边设钢管维护,具体详见围堰施工图。2、基坑开挖:围堰完成后,立即抽水清淤,然后进行箱涵拆除,拆除后进行基坑开挖,基坑开挖采用人工配合机械开挖,为保证边坡稳定,采用放坡开挖,坡度为1:1。基坑深度同围堰,为3.75m。边坡土质为硬质粘土。张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案33二、施工组织和管理机构三、围堰与基坑开挖施工工艺流程1、围堰施工工艺流程施工准备(路电和物资机械人员等资源准备)→上游截流,下游放空→抽排积水→测量放线→清理淤泥→分层填筑夯实堰体→清理整平围堰坡面→整平堰顶。2、基坑开挖施工工艺流程原地面清表→测量放线→基坑开挖→人工修整边坡→坑底的土方开挖→挖排水沟项目经理项目副经理项目技术负责人测量工程师材料员安全员资料员质检工程师钢筋班组其他综合班组模板班组混凝土班组项目负责人张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案44四、施工进度计划见附件3。五、围堰与基坑开挖施工要点1、编制依据(1)本工程的施工招标文件及招标答疑纪要;(2)本工程的施工图纸;(3)建筑安全检查标准及有关安全生产、文明施工的规定;(4)施工勘察资料;(5)业主要求工程质量目标;(6)《建筑地基基础设计规范》(GB50007-2002);(7)《建筑基坑支护技术规程》(JTJ319-99);(8)《建筑地基处理技术规范》(JGJ79(J220)-2002)。2、测量放样围堰施工时,要测放出围堰的位置,要保证桥梁施工时的工作面。基坑开挖时要保证基坑的平面位置正确,开挖过程中要经常检测开挖位置以及开挖深度,开挖基坑底时要特别注意,坑底最后30cm应由人工开挖,所以测量要跟踪开挖。3、围堰施工要点:(1)施工准备①施工机械设备、物资机械配备情况表机械配备数量机械配备数量挖掘机(1m3)1台潜水泵(大口径)3台推土机1台铁锹30把自卸车(5T)5台照明灯具5盒硬塑粘土若干电缆电线若干电夯1台人工夯3台②电源要准备好,以供夜间施工照明及抽排水施工。张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案55(2)截流协同建设单位与当地排涝站联系,采取上游截流一定时间,下游排空水流。(3)抽排消力池内积水准备用多台流量大以上污水泵抽排消力池内积水至下游河道内,尽快抽排完毕。(4)测量放线河道内淤泥清理完成后,测量放线;用白灰标示出围堰基础边线,(5)清理河道淤泥,用装载机铲运淤泥至下游。(6)分层填筑碾压堰体挖掘机挖装土方,5T自卸车运土至施工现场,装载机现场铲运土方,推土机推平后夯实。(7)清理整平围堰坡面人工清理整平堰体坡面,以保证坡面的顺直及坡度、平整度符合要求;(8)整平堰顶填筑夯实完成后,人工整平堰顶。(9)围堰四周的安全围护采用48钢管连接做护栏,立杆打入土层中深500以上,基脚用素砼浇实,间距1800,高1200,上下用涂有黄黑色漆的钢管连接,并用密目网封闭。3、基坑开挖施工要点:土方开挖由专人指挥,采取分层分段对称开挖,并严格遵循“分层开挖、严禁超挖”及“大基坑小开挖”的原则。当挖至标高接近基础底板标高时,边抄平边配合人工清槽,防止超挖,并按围护结构要求及时修整边坡及放坡,防止土方坍塌。坑底300mm土方采用人工清理,然后用挖机带走。主要分为两级开挖:(1)采用1m3反铲挖掘机开挖,开挖时要分层开挖,开挖深度约3.75m,机械开挖3.45m,余下部分采用人工开挖。机械开挖完成后人工立即修整边坡。(2)人工突击挖除坑底30cm后,应避免坑底长时间暴露,尽快进行下道工序施工,24小时内完成打木桩及10cm碎石垫层施工。(3)开挖过程中,随时注意基坑四周的土质情况。当基坑沿顶面裂缝、坑壁松塌等影响基坑稳定时,立即加固支护。基坑四周用土堆成30cm高土坝,防止地面水流入基坑,冲刷坑壁,基坑底设置集水坑。基坑开挖成型后,周围外设置围栏,并用密目网封闭。同时在基坑周边以及施工临时便道设置警示标志。(4)基坑开挖及进行基础施工过程中,运土自卸汽车必须按既定的马道行走,基坑其他张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案66方向10米范围不许任何机动车辆通过,防止动荷载引起坑壁塌方。10米外车辆通过时,需加强对坑壁监测。(5)挖掘机、自卸车、装载机等施工机械均已到场,并检查机械的性能、状态,符合施工要求,已经对操作人员进行了培训、交底。施工时现场配备1台挖掘机、3辆自卸汽车。(6)土方开挖技术质量要求①各层土方开挖应按要求放坡挖土,根据本工程的自然地基状况,挖机挖土放坡不得小于1(高):1(宽),视基坑土质而定。②土方开挖和外运的过程中,基坑2m不得堆放土方和重物,基坑内挖出土方应及时外运。③挖到设计标高经“三检”后,立即请地质勘察单位、设计院等进行验槽确认,如遇杂填土或成分复杂、结构均匀性差时,应会同各方确定处理,之后应立刻进行垫层施工,以避免土体隆起、泡水和土体扰动。(7)人工捡底的方法基坑形成后根据已建立的建筑物轴线控制网和高程控制桩,将轴线标高引测于坑内,并在坑内建立临时轴线控制网,测放出基础垫层外框线,作为人工捡底的依据,人工捡底应采用锹镐进行开挖,开挖过程中应注意基底标高,防止超挖,人工开挖前应邀业主、监理、质监等部门进行验槽。(8)土方的运输和堆放①开挖基坑的土方,在场地有条件堆放时,一定留足回填需用的好土;多余的土方,应一次运走,避免二次搬运。②土方运至业主指定地点堆放。堆放场地内,将土方按土的类型分类堆放,即杂填土、素填土堆放在一起,粉质粘土、粉土堆放在一起,中砂堆放在一起,圆砾、卵石堆放一起,膨胀土单独堆放。(9)基坑内排水:本工程主要采用设明沟、集水井排水法。基坑内排水,采取在基坑底形成集水沟,在集水沟两端挖掘集水井,具体尺寸如下:集水沟呈倒梯形,上口宽400mm,下口宽300mm,低于坑底0.4m。集水低于坑底标高1m,,东侧、西侧转角处各做1000×1000×1000集水坑。每处集水坑放置污水潜水泵一台,集水后用潜水泵排出基坑上口外排水沟内。(10)基坑安全通道因本工程基坑深度较深,基坑内设置二座之字形爬梯作为施工及安全通道;钢管安全栏杆高度1.2m,基坑四周各设一道。安全通道从西侧开挖一条坡道至基坑,坡比1:3,并用木栏杆围护。张浦金华村南华翔自然村农路改造工程——围堰及基坑开挖施工方案77(11)基坑安全监护在土方开挖及基础施工过程中,必须派专职监测人员和安全监督人员在基坑顶部进行巡视监护,主要观测周围土体及周围环境,如发现异常情况,立即鸣哨通知坑底施工人员及时撤离到安全区域。(12)基坑四周的安全围护①采用48钢管连接做护栏,立杆打入土层中深500以上,基脚用素砼浇实,间距1800,高1200,上下用涂有黄黑色漆的钢管连接,并用密目网封闭。②坑边不准堆积弃土,不准堆放建筑材料、存放机械、水泥罐及行车。基坑边外部荷载不得大于15kpa.③围绕坑边堆积30cm挡雨水土堆,防止地面雨水流入基坑内。对薄弱的边坡彩带布覆盖。防止雨水冲刷边坡,使边坡产生塌方。④坑边不得有常流水,防止渗水进入基坑及冲刷边坡,降低边坡稳定。六、土围堰设计计算见附件1,由PKPM专业软件计
本文标题:南华翔路改造工程――围堰及基坑开挖施工方案
链接地址:https://www.777doc.com/doc-4301508 .html