您好,欢迎访问三七文档
当前位置:首页 > 办公文档 > 模板/表格 > 底板设计中考虑锚杆与底板共同作用的优化设计
1訳訴GUANGDONGARCHITECTURECIVILENGINEERING201344APR2013No.41,,、、,,,。,,,。、,,,,。,,,,,。,,,。,,,。,,,,。2,(“”),(“”),1。OptimizationoftheFoundationSlabconsideringtheCombinedActionwithFloatingResistanceBoltChenChunhui(JiankeArchitecturalDesignInstituteofGuangdongProvinceGuangzhou510500,China)Abstract:Thearticlecombineswithengineeringlivingexamples,changesthetraditionalwayofbolt'sarrangement.Theboltiscentral-izedlayouttothespanofslab.Theauthorconsidersthecombinedactionoffloatingresistanceboltandthebasementfloorslab,makesthedesignoftheboltmoresafetyandreasonable,reducesthereinforcementintheslabanddecreasestheprojectcost.Keywords:boltarrangement;centralizeofpointtypelayout;planaruniformlayout;centralizedlayouttothespanofslab;optimization(510500):,,,,,,。:;;;;223(kN)172.20286.27286.84170.70286.27372.37372.37286.84286.84372.37372.37286.27170.70286.84286.27172.20356.26354.66356.26380.10379.53354.66354.66379.53380.10356.26354.66356.26訳訴2(mm)1.8283.0393.0451.8123.0393.9533.9533.0453.0453.9533.9533.0391.8123.0453.0393.4243.7823.7653.7824.0354.0293.7653.7654.0294.0353.7823.7653.782訳訴:APR2013No.4201344,,,,,,,。,,,。,,。,,,。,。,,,,,。3,,,,,。,;,。,。。,,,,,。,,。Q-s,,《》:K=N△l=EAl:K;N;△l;E;A;l。,、。,,。4(),3,-15.0m,-0.65m,900mm,130kN,“--”,。,,,,“--”,,。,,,,,。MidasGen8.4m×8.4m,,900mm,f200,400kN,C30,HRB400,130kNm2(-)。2~3。(7)23;,,。4.2,,,。1.43,。,3。,1.271.29,。4.3:≥1.2[1,4],,“、”。4.4,,、,;,,,。5,:①,,;②。,,,“、”。,。,,,,,。、。[1]JGJ3-2010[S][2]GB50010-2010[S][3]GB50009-2012[S][4]GB50011-2010[S][5][R].,2007APR2013No.42013444444444444444444444444444444444444444444,16,,2,,373kN,170kN。12,,,,。,,。5,、、,,。,,,。[1]GB5007-2011[S][2]GB50330-2002[S][3]CECS22:2005()[S][4],,.()[M].:,1994(23)7
本文标题:底板设计中考虑锚杆与底板共同作用的优化设计
链接地址:https://www.777doc.com/doc-4643530 .html