2012年合肥汇聚层光缆线路单项工程(长丰)一阶段设计CMDI1目录1.1概述·························································································11.1.1工程概况················································································11.1.2设计依据················································································11.1.3设计范围和分工·······································································21.2光缆线路路由简述·······································································21.2.1光缆线路路由··········································································21.2.2路由主要障碍及其处理措施························································31.3光缆线路敷设安装标准技术措施及施工要求·····································31.3.1光缆结构和应用场合·································································31.3.2器材检验················································································31.3.3杆路的建筑与安装要求······························································31.3.4敷设架空光缆··········································································61.3.5敷设管道光缆··········································································61.3.6敷设墙壁光缆··········································································71.3.7敷设引上光缆··········································································71.3.8敷设局内光缆及成端·································································81.3.9光缆预留················································································91.3.10光缆宣传牌、标识牌·······························································101.3.11光缆的接续与接头盒安装·························································101.3.12光缆防护设计········································································111.4需要说明的其他问题··································································122预算说明····················································································142.1预算编制依据···········································································142.2工程投资·················································································142.3资金筹措·················································································142.4有关费率及费用的取定·······························································142.5预算表格编号···········································································152.6预算表格2012年合肥汇聚层光缆线路单项工程(长丰)一阶段设计CMDI23附件附件一:2012年合肥汇聚层光缆线路单项工程(长丰)(长丰下塘-长丰新局段)工作量表(共2页)附件二:2012年合肥汇聚层光缆线路单项工程(长丰)(长丰新局-综合楼-庄墓-杨庙段)工作量表(共2页)附件三:2012年合肥汇聚层光缆线路单项工程(长丰)(长丰双墩-长丰下塘段)工作量表(共2页)附件四:2012年合肥汇聚层光缆线路单项工程(长丰)(长丰下塘-长丰杨庙段)工作量表(共1页)附件五:2012年合肥汇聚层光缆线路单项工程(长丰)(长丰杨庙-安然绿洲段)工作量表(共2页)附件六:2012年合肥汇聚层光缆线路单项工程(长丰)工作量表汇总(共1页)附件七:光缆长度计算表(共1页)4图纸(1)肥东、肥西和长丰三县汇聚层光缆网路由图2012AHGS0005-02Y-0105-GL-01(2)长丰下塘汇聚点-新局段汇聚层光缆线路施工图2012AHGS0005-02Y-0105-GL-02(01/23~23/23)(3)长丰新局-综合楼-庄墓-杨庙段汇聚层光缆线路施工图2012AHGS0005-02Y-0105-GL-03(01/18~18/18)(4)长丰双墩汇聚点-长丰下塘汇聚点光缆线路施工图2012AHGS0005-02Y-0105-GL-04(01/14~14/14)(5)长丰下塘汇聚点-长丰杨庙汇聚点光缆线路施工图2012AHGS0005-02Y-0105-GL-05(01/09~09/09)(6)长丰杨庙汇聚点-安然绿洲汇聚点光缆线路施工图2012AHGS0005-02Y-0105-GL-06(01/25~25/25)(7)长丰双墩站光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-072012年合肥汇聚层光缆线路单项工程(长丰)一阶段设计CMDI3(8)长丰下塘站光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-08(9)长丰杨庙站光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-09(10)安然绿洲站光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-10(11)长丰庄墓站光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-11(12)长丰综合楼光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-12(13)长丰新局光缆路由示意图及端子占用图2012AHGS0005-02Y-0105-GL-13(14)管道、架空光缆接头盒安装及预留示意图TY-Y-GL-01(15)拉线安装及仰俯角装置工艺图TY-Y-GL-02(16)架空杆路避雷装置示意图TY-Y-GL-03(17)光缆/接头盒标识牌制作安装要求图TY-Y-GL-04(18)光缆进站引接示意图TY-Y-GL-05(19)杆号书写示意图TY-Y-GL-06(20)光缆固定开剥操作图TY-Y-GL-07(21)图例TY-Y-GL-082012年合肥汇聚层光缆线路单项工程(长丰)一阶段设计CMDI11设计说明1.1概述近年来合肥城市规模不断扩大,合肥市网络规模不断扩大。根据《2012~2014年合肥城域传送网、接入网滚动规划》,结合本年度合肥市区新启用的汇聚点(萨尔斯堡、南郡明珠、岸上玫瑰、前城上品、南部营销中心、天元新城、裕东景苑、玉成明珠苑、天元新城、望湖城上街、柏林春天等11个)情况、市到县汇聚环以及所辖各县汇聚环现状,为满足2012年汇聚系统组网要求,进一步完善合肥地区传输网络结构,需启动本期光缆线路工程。另外根据设备组网需求,部分段落优化光缆建设需求急迫。本设计为合肥移动2012年城域网光缆线路工程设计。本册为第一册第五分册:2012年合肥汇聚层光缆线路单项工程(长丰)。1.1.1工程概况本工程主要建设下塘汇聚点-长丰新局、长丰新局-长丰综合楼、长丰综合楼-庄墓汇聚点、庄墓汇聚点-杨庙汇聚点、长丰双墩汇聚点-长丰下塘汇聚点、长丰下塘汇聚点-长丰杨庙汇聚点、长丰杨庙汇聚点-安然绿洲汇聚点汇聚层直达光缆。本工程施工测量长度1628.21百米,敷设48芯管道光缆12.479千米、敷设48芯架空光缆157.697千米、敷设48芯槽道光缆0.318千米、敷设墙壁吊线式光缆0.148千米、新立7米水泥杆41根、新立9米水泥杆1根、新设7/2.6拉线381条、新设7/2.2拉线18条、新设架空7/2.2吊线112.216千米,光缆线路传输长度为170.642千米。本工程光缆采用48芯G.652光纤,光缆结构为松套层绞式单模光纤光缆。按设计委托书的要求,本工程按一阶段进行设计,工程编号为2011AHGS0005-02Y。1.1.2设计依据(1)中华人民共和国通信行业标准YD5102-2010《通信线路工程设计规范》。(2)中华人民共和国通信行业标准YD5148-2007《架空光(电)缆通信杆路工程设计规范》。(3)中华人民共和国通信行业标准YD5121-2010《通信线路工程验收规范》。(4)中国移动集团有限公司安徽分公司的《关于委托编制合肥移动2012年城域2012年合肥汇聚层光缆线路单项工程(长丰)一阶段设计CMDI2网光缆线路工程设计的函》。(5)中国移动通信集团设计院有限公司安徽分公司编制的项目建议书。(6)本工程设计人员实地勘察取得的基础数据和资料(截止2012年3月9日)。1.1.3设计范围和分工本设计范围包括设计文本及工程预算的编制,设计具体内容及分工如下:(1)设计文本的编制:本单项工程涉及管道、杆路路由选择、光缆线路敷设安装、技术措施和施工要求及防护设计。(2)工程预算的编制:工程量统计、工程预算、预算说明等。(3)设计分工:设计以光缆成端接头ODF单元为界,光缆成端接头适配器、新增ODF单元侧(含光纤熔接头、双头尾纤)及光缆线路由本单项工程负责。1.2光缆线路路由简述1.2.1光缆线路路由本工程建设合肥-长丰汇聚层光缆。各段落光缆路由描述如下:下塘汇聚点-长丰新局:光缆由下塘汇聚点出局后,沿下塘-大杨-左店-朱巷-陶湖-长丰新局的原有汇聚层和接入层共用的杆路敷设至长丰长新路落地进入管道,沿长新路管道敷设至长丰新局。长丰新局-长丰综合楼:光缆由长丰新局出局后,沿长丰路、长合路管道敷设至杨公路,再沿杨公路管道敷设至长丰综合楼层机房。长丰综合楼-庄墓:光缆由长丰综合楼出局后,沿杨公路管道敷设至杨公路与南二环
本文标题:2012年合肥汇聚层光缆线路单项工程(长丰)一阶段设计-说明
链接地址:https://www.777doc.com/doc-5073049 .html