一、工程概况二、施工技术方案1、沟槽开挖...................................................................................................................................23、检查井砌筑...............................................................................................................................44、雨水口施工...............................................................................................................................55、预留支管...................................................................................................................................5三、管道工程的竣工验收.....................................................................................................................7四、质量保证措施.................................................................................................................................71、沟槽土方开挖质量保证措施...................................................................................................72、常见问题产生原因及预防措施...............................................................................................73、检验标准.................................................................................................................................104、雨季施工具体措施.................................................................................................................115、土方工程.................................................................................................................................12五、安全保证体系及安全保证措施...................................................................................................121、施工安全目标.........................................................................................................................122、安全保证体系.........................................................................................................................123、安全生产保证措施.................................................................................................................13六、文明施工措施...............................................................................................................................141、现场布置.................................................................................................................................142、道路和场地.............................................................................................................................143、材料堆放.................................................................................................................................144、周转设备存放.........................................................................................................................145、水泥库.....................................................................................................................................156、消除施工污染.........................................................................................................................15七、突发事件的应急预案措施...........................................................................................................151、一般规定.................................................................................................................................152、沟槽垮塌应急预案.................................................................................................................15****N1标段雨污水工程施工方案一、工程概况本项目设计管网包括雨水、污水、给水、绿化给水及过街预埋管。雨水管道位于道路西侧人行道下,距西侧道牙2.0米,管径为DN600~DN1000mm,最大埋深3.67m,最小埋深2.96m,管材为HDPE双壁波纹管(S2型),检查井DN600mm管道采用D1000圆形砼雨水检查井,DN800mm管道采用D1250圆形砼检查井。污水管道位于道路东侧人行道下,距行车道牙1.5米,管径为DN400~DN1200mm,最大埋深4.69m,最小埋深3.81m,管材为HDPE双壁波纹管(S2型),检查井DN400~DN600mm管道采用D1000圆形砼污水检查井,DN800mm管道采用D1250圆形砼污水检查井。二、施工技术方案1、沟槽开挖沟槽开挖时,由测量人员向挖掘机操作人员和挖土工人交底,提供沟槽深度和槽底走向。开挖时技术人员跟踪测量,避免超挖和浅挖,为防止槽底土受扰动及槽底受水浸泡,在槽底暂留30㎝土层在垫层施工前人工清理,在开挖时为保证沟槽的中心移位,先确定几个控制点,每隔5m测量一次,为控制高程,在沟槽边开挖边测量,并在每个井距中间设两道控制桩,在基本标明各部位的标高及下返常数。沟槽开挖的土方,根据现场的情况,用装载机统一推放在沟槽侧面,便于回填,为了边坡的稳定和不影响其它工序进料,堆土区下坡脚离沟槽1.5m,堆放高度不超过规定要求,弃土和回填土分开堆放,垃圾土与好土分开堆放,在靠近房屋及电线处不堆放。沟槽开挖时注意事项:1)、土方开挖时需有施工员现场指导,时刻注意施工安全,开挖施工中必须设有专人负责安全检查和监护施工,并做好检查记录。2)、挖掘机工作或行走时,注意架空线路,不得在架空输电线下工作;机械作业时施工人员不得在回转半径以内工作,并有统一的安全口令。3)、工人不得在沟槽施工过程中嬉笑打闹,严禁穿拖鞋作业、酒后作业;槽底作业人员须遵守操作规范,戴好安全帽。4)、保证用电连续供应,断电及时采取措施(发电机供电),确保井点设备停电时仍能正常运行。5)、雨季施工沟槽充分考虑雨水排除问题,防止雨水泡槽,沟槽顶面应设置防止地面水流入沟槽的措施,或在沟槽开口两侧围土埂或挖截水沟。机械作业完毕后停放在较高的坚实的地面上,不空槽过夜,堆土不得切断或堵塞原有排水管线。6)、开挖的土方不得沿开挖边线堆放,按不同的土质条件和开挖深度设置适合的安全距离,以防止土方堆放对沟槽增加侧压力发生的塌方事故,堆土高度不超过2米,堆土坡度不陡与自然休止角,弃土和回运土分开堆放,留出运输通道;车辆配合外运时,任何人不得在车上停留,向槽一侧的堆土面,应铲平、拍实、避免雨水冲塌,对突然发生的恶劣天气情况等不利因素,立即采取相应措施。沟槽支撑注意事项支撑应该经常检查,发现支撑构件有弯曲、松动、移位或劈裂等现象时,应及时处理,雨期和春季解冻时应加强检查。拆除支撑前,应对沟槽两侧的建筑物、构筑物和槽壁进行安全检查,并应做好拆除支撑的作业要求和安全措施。施工人员应由安全梯上下沟槽,不得攀爬支撑。2.管材安装管材进场时应时行检验,管节安装前应进行外观检查。管道物理性能检验及压力试验要符合施工及设计规范要求。管体外表面应有标记,应有出厂合格证,注明管材型号,出厂水压试验的结果,制造及出厂日期,厂质检部门鉴章。玻璃钢夹砂管安装(1)、在管道铺设前,对管材内外壁、承插口和橡胶圈进行验证。发现缺陷应及时处理或调整;用布将管材的连接部位擦净,用中性润滑剂,如硅油、液体凡士林等(无毒材料)涂擦橡胶圈及承口的扩张部分;把橡胶圈套入插口上的凹槽内,沿橡胶圈四周依次向外适当用力拉离凹槽并慢慢放回凹槽,以保证橡胶圈在凹槽内受力均匀,没有扭曲;在插口上做好安装限位标记,以便在安装过程中检查连接是否到位。采用前置沟槽的挖掘机推接。为避免管节的端面被碰伤,需在承口前衬填厚木板,然后伸展吊臂,沿着管轴方向推动管节,使插口部分的橡胶圈到达插口内,最后用倒链慢慢紧固承插口,直至插口达到预定的连接位置。(2)、管节承插到位后,放松倒链等紧管工具,然后进行检查。复核管节高程及中心线;对于承插连接接口,在管道连
本文标题:雨污管道施工方案
链接地址:https://www.777doc.com/doc-5653209 .html